The world’s P-3 Orion fleets have served for a long time, and many are reaching the end of their lifespans. In the USA, and possibly beyond, the new P-8 Poseidon Multi-mission Maritime Aircraft will take up the P-3’s role. While the P-8’s base 737-based airframe offers strong service & maintenance arguments in its favor, the airframe is expensive enough that the P-3s cannot be replaced on a 1:1 basis.
In order to extend the P-8 fleet’s reach, and provide additional capabilities, the Poseidon was expected to work with at least one companion UAV platform. This DID FOCUS Article explains the winning BAMS (Broad Area Maritime Surveillance) concept, the program’s key requirements, and its international angle. We’ll also cover ongoing contracts and key events related to the program, which chose Northrop Grumman’s navalized MQ-4C Triton Global Hawk variant.
The P-3 fleet’s heavy use in both maritime surveillance and overland roles points up a potential problem with its successor the P-8A Poseidon. The 737-based aircraft will be bought in fewer numbers than the aircraft it replaces, but its high end Littoral Surveillance Radar System (LSRS) capabilities could quickly turn it into a sort of “mini-JSTARS,” making it a platform with strong maritime and land surveillance capabilities like NATO’s similar sized Airbus 321-based AGS battlefield surveillance aircraft.
As an expensive but in-demand asset, the P-8’s coverage scope could easily translate into a fleet run ragged by high flight hours per airframe, and forced into early retirement. See the Strategic Review article “Brittle Swords: Low-Density, High-Demand Assets” [PDF] for more background on this phenomenon.
The logical response is to pair the P-8s with a lower cost counterpart.
Hence the P-8 Poseidon’s companion Broad Area Maritime Surveillance (BAMS) UAV program, run by NAVAIR’s PMA-263 program management office.
BAMS: Requirements and Missions NGC on BAMSThe BAMS UAV is formally designated MQ-4C Triton: “M” as a multi-mission aircraft, even though all of its missions are ISR/reconnaissance missions.
The name fits. In mythology, Triton was Poseidon’s son, and the messenger of the sea. Tritons will work with the P-8 Poseidon maritime surveillance aircraft on missions that will include maritime surveillance, collection of enemy order of battle information, battle damage assessment, port surveillance, communication relay; plus support for maritime interdiction, surface warfare, battlespace management, and targeting for maritime and strike missions. MQ-4C Increment 3 UAVs and beyond are slated to add SIGINT capabilities, to capture enemy communication and radar transmissions. They would begin replacing the current EP-3 fleet in that role.
The MQ-4C UAV’s required capabilities definitely placed it at the high end of today’s UAV spectrum. BAMS had to be capable of a completely pre-programmed mission track, communication plan, and sensor employment plan, with manual override possible to support real-time control and/or re-tasking. The baseline requirement for operation with the P-8A is currently Level II control (receipt of sensor data to/from), with a proposal to quickly increase to Level IV (full control except landings) in the P-8A’s first improvement cycle. It also needed the ability to land on its own if necessary, however, using pre-surveyed and pre-programmed air fields.
Many of those capabilities are already present in existing medium UAVs. The requirements that follow are not.
BAMS: expected ‘orbits’BAMS had to have a minimum mission radius of 3,000 nautical miles, with a 10 hour time to on-station at 2,000 nmi mission radius, and autonomous flight through moderate icing or turbulence. More to the point, the requirements were expressly crafted for persistence. They included an 80% Estimated Time On Station (ETOS) for a group of BAMS platforms, over a period of 1 week (168 hours). That means UAVs in the air, within their assigned patrol zones at an estimated 900 nmi distance from launch, for 134 hours out of 168. That’s the minimum – the goal is 95% ETOS, or almost 160/168 hours.
The Navy saw BAMS UAVs employed within 5 “orbits” around the globe, with no more than 3 UAVs operating at the same time within each orbit. While this may make BAMS seem like a tiny program, consider the fact that all aircraft have fatigue lifespans measured in flight hours. Many fighters have lifespans of 10,000-12,000 hours. Transport aircraft can reach 30,000-40,000 hours, with major rebuilds along the way. Now consider the number of UAVs required to support flight profiles within those orbits, which are estimated to sum to 43,800 on-station flight hours/year, plus flight times to and from station for each mission. Over an expected program operational lifetime of about 20 years.
BAMS also has an unlisted, but critically important, program requirement. As UAVs proliferate in this role and begin undertaking long-range missions, they’ll require enough secure bandwidth to transmit large first-pass processed data sets to accompanying aircraft or ground stations. That cannot be provided from within the BAMS program, though communications relay packages on high-altitude BAMS UAVs will help military commanders on the surface. BAMS is in turn reliant on the USA’s Global Information Grid’s future security and capacity, in order to reach its full potential.
BAMS Options BAMS/P-8 mission setsSome nations use smaller business jet derivatives for maritime surveillance, and this option was closely considered by the Navy. The joint ACS (Aerial Common Sensor) program had potential dual-use features that could have made it a maritime surveillance supplement, as well as a SIGINT/ELINT (Signals & Electronic Intelligence & intercepts) platform to replace the Navy’s aging EP-3 Aries II fleet. The ACS program’s demise has taken that option off of the table for now. As it happens, however, the Navy had already chosen a different kind of companion for its P-8.
While business jets offered economy and numbers, the US Navy believed that unmanned UAVs could bring more to the long and oft-times tedious job of maritime surveillance. They can undertake very long-endurance flights of 30 hours or more, in part because they don’t have to carry processing stations and crew, or worry about aircrew endurance.
Northrop Grumman was always the favorite to win the BAMS competition. Its unarmed RQ-4 Global Hawk UAV had already proven itself in battlefield surveillance roles around the globe, and had been used as the Navy’s GHMD/BAMS-D maritime surveillance UAV testing and concepts research.
In contrast, the General Atomics MQ-9N Mariner’s main offered efficiency at much lower flight ceilings, up to 3,000 pounds of integrated weapons, and commonality with the Air Force’s MQ-9 Reaper strike UAV.
Boeing’s manned/unmanned G550 business jet was the 3rd major entry, offering the largest payloads, twin-engine redundancy, and compatibility with a civilian fleet.
BAMS: The MQ-4C Triton MQ-4C Triton rolloutThe “RQ-4N” system chosen by the US Navy was based on the USAF’s RQ-4B Block 20 Global Hawks, but it incorporated a wide range of changes on the way to its unveiling as the MQ-4C Triton.
Sensors received the biggest overhaul. MQ-4Cs will have a more rounded belly housing for Northrop Grumman’s own 360-degree coverage AN/ZPY-3 AESA radar, as part of their Advanced Integrated Sensor Suite (AISS). Unlike conventional mechanically-scanned radars, AESA radars offer the ability to zoom in on several targets of interest, and they can do this without stopping the broader scan. That shift from Raytheon’s side-looking AESA radar used in the RQ-4B could have become a major risk factor, which was a big reason behind Northrop Grumman’s decision to field their new radar on a Gulfstream II BAMS test bed during the competition.
Beyond the radar, “Electronic Support Measures” systems that can pick-up, map, and identify radar emissions initially relied on Northrop Grumman’s LR-100, but Sierra Nevada’s Merlin ESM system was substituted in order to meet the program’s requirement for 360-degree, 300 nm/ 555 km coverage. In the visual spectrum, AISS includes an optical day/night surveillance and targeting turret.
Other sensors expected for the MQ-4C include a “due regard” radar and other systems that let them descend safely into potential air traffic over international waters (currently facing development difficulties), Identification Friend or Foe (IFF) in various modes, and of course sensor packages with additional SIGINT/ELINT equipment and other specialty mission packages. The UAV must be able to perform “first pass” processing of any data it receives, before sending it on to other ships, aircraft, and/or ground stations.
RQ-4N conceptCommunications. A Ka-band Wideband Gapfiller satellite link will replace the commercial Ku-band link used by the USAF, in order to ensure 100% accessibility over long stretches of water. In addition, a pair of Ku-band and X-band datalinks have been added to the fuselage sides, to act as communications relays. Those relays, plus the addition of dual Common Data Links instead of single-CDL, and Link 16 capability UHF/VHF radios with HAVE QUICK and SINCGARS capability, will allow real-time data feeds to other Navy ships and aircraft. The US Air Force is reportedly considering this upgraded set for its own Global Hawks.
On the MQ-4C, an Automatic Identification System (AIS) receiver will allow the detection, identification, geo-location, and tracking of cooperative ships equipped with AIS transponders.
Mechanical. The need to have Navy UAVs descend and rise from altitude during over-water missions requires de-icing systems on the MQ-4C’s engine inlet, wings and tail. Strengthened wing structures were also deemed to be necessary.
One final mechanical issue concerns the Global Hawk design’s single turbofan engine. To cope with possible engine outages without losing these ultra-expensive UAVs, the USAF reportedly uses a combination of modified control software and alternate “glide-to” landing bases. When flying over vast ocean expanses, high altitude flight will be required, in order to keep the “glide-to” option alive.
BAMS: The ProgramIn April 2008, NAVAIR’s PMA-263 selected Northrop Grumman’s RQ-4N Global Hawk, which has since been re-designated MQ-4C. The FY 2014 budget cut the program from 70 (5 test + 65 operational UAVs) to a total of 66: 5 test + 61 operational UAVs.
BAMS Budgets from FY 2009 include:
Industrial team members include:
NGC performs Global Hawk sub-assembly work at its Unmanned Systems Center in Moss Point, MS, and anticipates performing final assembly at its St. Augustine, FL manufacturing center.
Triton’s Tactical Support Centers for command and control will be focused around the P-8A’s main bases: NAS Jacksonville, FL and NAS Whidbey Island, WA. Initial MQ-4C basing will include Ventura County Naval Base, at the Point Mugu, CA facility. Beyond that, NAVAIR has been tight-lipped, but reports have highlighted a few likely locations.
Andersen AFB on the island of Guam, which already supports some RQ-4 Global Hawks, is expected to become an important forward Pacific base, along with Hawaii and Diego Garcia. A fall 2013 agreement with Japan will provide for some Global Hawk basing in Japan itself, as a forward deployment from Andersen. It would be logical to expect MQ-4Cs as part of any eventual arrangement there. Australia’s Cocos Islands in the Indian Ocean have also been discussed as a way of relieving congestion at Diego Garcia, while keeping RQ-4 and possibly MQ-4 UAVs closer to sea lanes and countries of interest. The required infrastructure upgrade is an issue for Australia, however, and much may depend on Australia’s own purchasing decisions regarding the MQ-4C.
Sigonella AB in Sicily, Italy is already a key Global Hawk base, and it will also house NATO’s RQ-4B Block 40 AGS fleet. It’s likely to serve as the Triton’s hub to help cover Europe, the Middle East, and Africa, but other bases in that region would make the fleet much more effective. Advanced spy planes have already flown out of the UAE, which would be very convenient for covering the Middle East and western Indian Ocean. Portugal’s Azores was a key naval air waystation for decades until NAF Lajes was inactivated in the late 1990s, and would be well positioned for operations to cover Africa’s oil-rich and piracy rich western coast. It’s worth keeping an especial eye on developments in those 2 locations.
BAMS: The International Angle Mariner UAVThe US Navy has been using the RQ-4 Global Hawk as a demonstration and proving platform to refine requirements and concepts of operations for BAMS, under the GHMD(Global Hawk Maritime Demonstrator) program. Even so, UAVs aren’t widely used for maritime surveillance just yet.
Beyond America’s shores, India has successfully used Israel’s Heron and Searcher II UAVs for coastal patrol as well and overland surveillance; UAVs from their 2005 follow-on Heron order have also been pressed into service along the coasts. To the southeast, Australia has undertaken successful trials with the General Atomics’ Mariner UAV for Coast Guard duties along its resource-rich Northwest Shelf. In the Great White North, Canada is evaluating UAVs for a maritime surveillance role under its JUSTAS program; Phase 2 could even include arctic surveillance out of Goose Bay, Labrador. IAI/EADS’ Eagle UAV, and General Atomics’ Altair high-altitude UAV derived from the MQ-9 Reaper, have already been tested as part of requirements definition.
Every one of these countries could eventually end up involved in the BAMS program.
P-8i test flightIndia’s MPA competition chose the “P-8I” as their next maritime patrol aircraft. With BAMS integration already scheduled for their chosen platform, a nation that sees its responsibilities stretching across the Indian Ocean from the Straits of Malacca near Singapore, to the Persian Gulf, and down to Madagascar, has obvious uses for the compatible Triton long-range, long-endurance UAV platform.
India seems to agree with this logic, but a treaty that it hasn’t signed is in the way. MTCR was originally aimed at limiting cruise missile exports, but a jet-powered UAV shares enough characteristics to create problems. Discussions are ongoing.
The Canadians have also been approached as possible partners in the P-8A Poseidon program, as a future replacement for their P-3/CP-140 Auroras. Thus far, they have made no commitments. Meanwhile, Northrop Grumman is offering them an RQ-4 variant called “Polar Hawk” for Arctic patrol, incorporating some MQ-4C features like de-icing. The vast expanses of Canada’s north make the speed of a jet-powered UAV very attractive, Northrop Grumman will have to beat General Atomics, which is offering its jet-powered Predator C as well as its slower MQ-9 UAV. If NGC can win, adding more Global Hawks for other missions would become easier.
AP-3C: who’s next?Australia went even further, and made itself a partner in BAMS via its AIR 7000 program. First Pass Approval was given in September 2006, and a Project Agreement was signed on Jan 13/07. Australian Embassy personnel have attended NAVAIR PMA-263 industry days, Australian technical experts are part of the BAMS integrated project teams, and NAVAIR’s BAMS RFP now includes an “Australian Unique Option” section. BAMS had passed its Milestone B “go/no-go” decision, and was analyzing unique Australian requirements before an expected Australian second-pass approval decision that could begin Australian BAMS production in 2012, and achieve Initial Operating Capability in 2015.
In 2009, however, Australia chose to drop out of the BAMS program, with sources citing both operational stress over the P-8A’s similarly-timed introduction, and fiscal pressures. They could still choose to drop back in, and their May 2013 Letter of Request for technical information is a step in that direction. The trade-off is that they’ll be looking at more of a finished product, with less scope for free-of-charge changes.
BAMS: Contracts & Key Events BAMS cutawayUnless otherwise noted, all contracts originate with the Naval Air Systems Command in Patuxent River, MD.
FY 2016 – 2018Know MQ-4C
June 6/18: Triton deployment Jane’s reports that the US Navy has officially commenced operations of its MQ-4C Triton UAV. The Broad Area Maritime System platform is deployed with the Unmanned Patrol Squadron (VUP)-19, the Navy’s first unmanned patrol squadron. The “RQ-4N” system chosen by the US Navy was based on the USAF’s RQ-4B Block 20 Global Hawks, but it incorporated a wide range of changes on the way to its unveiling as the MQ-4C Triton. The Triton has been developed to provide the US Navy with a persistent maritime intelligence, surveillance, and reconnaissance (ISR) capability in support of a full range of military operations. Designed for high-altitude, long-endurance ISR tasks, the Triton has a range of about 2,000 n miles and, with an endurance of 24 hours, will be able to cover more than 2.7 million square miles in a single mission. VP-19 now has two Triton UAVs, after training and trials are successfully completed the drones will be stationed in Guam. They are set to operate in concert with the P-8A.
May 18/18: Triton needs more money The Naval Air Systems Command is contracting Northrop Grumman Systems for services related to the MQ-4C platform. The firm target advance acquisition contract, valued at $45 million, provides for lead materials components, material, parts, and associated efforts required to maintain the MQ-4C Triton unmanned aircraft system planned production schedule. The MQ-4C Triton, despite being designated a multi-mission aircraft, mostly performs ISR/reconnaissance missions in support of the P-8 Poseidon. In mythology, Triton was Poseidon’s son, and the messenger of the sea. Tritons work with the P-8 maritime surveillance aircraft on missions that include maritime surveillance, collection of enemy order of battle information, battle damage assessment, port surveillance, communication relay and other support functions. Work will be performed at various locations across the continental US, including San Diego, California; Baltimore, Maryland and Salt Lake City, Utah. Work is expected to be completed by January 2019.
May 9/18: Royal engines for Triton Rolls Royce is being awarded a $25.9 million contract that sees for the provision of turbofan engines to be used on the Navy’s Triton platform. The MQ-4C Triton or BAMS UAV program is run by NAVAIR’s PMA-263 program management office, it has been devised to work in conjunction with the P-8 Poseidon. Tritons work with the P-8 Poseidon maritime surveillance aircraft on missions that include maritime surveillance, collection of enemy order of battle information, battle damage assessment, port surveillance, communication relay; plus, support for maritime interdiction, surface warfare, battlespace management, and targeting for maritime and strike missions. Work will be performed in Indianapolis, Indiana, and is expected to be completed by December 2021.
April 9/18: DSCA Clearances Both Germany and the United Kingdom have been cleared by the US State Department to proceed with foreign military sales that will boost their UAV capabilities. The sales were announced by the Defense Security Cooperation Agency last week. For Germany, a $2.5 billion order covers the potential sale of four MQ-4C Unmanned Aircraft Systems (UAS), along with all the various systems, engines and equipment that caters for the US Navy’s Trion configuration. Northrop Grumman will act as lead contractor in regards to integration, installation and functional platform compatibility testing of the payload, while Airbus will take the lead for Germany on the development and manufacturing, and will be responsible for the functional test, end-to-end test and installed performance. The British package, valued at $500 million, covers articles and services for continues follow-on support to the MQ-9 Reaper program. General Atomics and MAG Aerospace will be prime contractors.
January 2/18: LRP Order Northrop Grumman will supply the US Navy with three MQ-4C Triton unmanned aerial aircraft under an initial low-rate production order from the service. In conjunction with the UAVs, the $255.3 agreement also includes trade studies and tooling, in support of the Persistent Maritime Unmanned Aircraft Systems Program Office at Naval Air Station Patuxent in St. Mary’s County, Md., where the contracting Naval Air Systems Command is headquartered. Work will take place in San Diego, California, as well as at least a dozen other locations across the continental United States , with contract completion scheduled for December 2021. The Navy plans to use the Triton alongside the P-8 Poseidon maritime patrol aircraft as its primary long-range aerial intelligence, surveillance and reconnaissance platform.
November 15/17: Deliveries Northrop Grumman announced Friday that it has delivered the first operational MQ-4C Trition UAV to the US Navy at its facility at Point Mugu. It will be joined by a second operational Triton later this year and both aircraft will be prepared by the maintenance detachment of Unmanned Patrol Squadron based at Point Mugu before deployment to Guam in 2018. In addition to Guam, the Navy’s first MQ-4C squadron will be based at Naval Air Station Jacksonville, Florida, with the service planning to deploy Triton squadrons to NAS Mayport, Florida, NAS Sigonella, Italy and the Middle East in the future.
August 17/17: An early operational capability MQ-4C Triton UAV is expected to be delivered to the US Navy next month, slightly later than its planned August delivery date. The news comes as Northrop commended taxi tests this week ahead of moving the aircraft to NAS Point Mugu, California, where it will conduct its first flight. The baseline Triton, also known as the integrated function capability 3 configuration, will come equipped with Northop’s multifunction active sensor (MFAS), a maritime patrol version of active electronically scanned array (AESA) radar, and Northrop will deliver two baseline Triton aircraft, B5 and B6, to NAS Point Mugu. After Triton reaches early operational capability in fiscal year 2018, Northrop has its eye on initial operational capability in 2021. The company also plan to add a signals intelligence capability, which will bring it on par with the navy’s manned EP-3 reconnaissance fleet.
July 24/17: Australia and the US are expected to sign a memorandum of understanding (MoU) in March for the delivery of MQ-4C Triton UAVs. As many as seven Tritons could be purchased by Canberra with the expectation that they will go towards augmenting its P-8A Poseidon aircraft fleet in conducting maritime patrol and surveillance missions. Later in 2018, Germany is expected to sign a letter of offer and acceptance for four Tritons, which will replace its existing EuroHawk fleet.
July 5/17: The US Navy is to build a MQ-4 Triton air base in Abu Dhabi, UAE. Assist Consultants Inc have been contracted to conduct the work in a $18 million deal that includes the design and construction of an environmentally controlled hangar space sufficient for four Triton aircraft and a mission control system, as well as the provision of a communication tower and emergency generator. Construction of the facility is part of the Navy’s rolling out of Triton stations across the world to assist with surveillance operations in the Middle East and Pacific. Additional bases include Guam, and the island of Sicily.
May 24/17: The US Navy has awarded a $49.4 million contract to Northrop Grumman for parts, material and labor required for the maintenance of the MQ-4C UAV in accordance with planned production. Work will be performed in Baltimore, Md., Bridgeport, W. VA., Salt Lake City, Utah, and other locations in the United States. Fiscal 2017 Navy procurement funds in the amount of $49.4 million have been allocated for the program. Contract completion is scheduled for December 2017.
March 7/17: Germany did confirm plans to purchase the high-altitude MQ-4C Triton surveillance UAV from Northrop Grumman as a replacement to 2013’s abandoned Euro Hawk program. While the defense ministry failed to mention how many MQ-4Cs it was intending to buy, the Euro Hawk requirement had initially called for five systems to be delivered with $1.26 billion earmarked for the procurement. However the deal was scrapped when it became known that gaining aviation approval would cost in the hundreds of millions of euros. Ministry sources said the aviation approval for Triton would be less costly because it was baked in from the start of the program.
December 29/16: MQ-4C Triton UAVs will replace EP-3E signals reconnaissance aircraft operated by the US Navy. Speaking on the announcement, NAVAIR’s Triton program manager Sean Burke said that approval to kick-start an 18-month process to install a signals intelligence payload on the Triton was given back in August. It’s expected that MQ-4Cs with low- and high-band signals receivers are expected to reach initial operational capability in 2021.
September 27/16: Northrop Grumman’s MQ-4C Triton has been cleared for low-rate initial production, the first piece of the production and deployment phase of the UAV. 68 Tritons are expected to be fielded, with the first to be deployed in 2017. The Triton will operate as a forward-deployed, land-based, autonomously operated system that provides persistent ISR within a range of 2,000 nautical miles using a multi-sensor mission payload including maritime radar, Electro-Optical/Infrared (EO/IR), Electronic Support Measures (ESM), Automatic Identification System (AIS), and basic communications relay.
July 5/16: Bloomberg has reported on a previously unknown flaw found on the MQ-4C Triton UAV. According to the report, a Northrop Grumman subcontractor was producing composite wing spars with quality issues which resulted in the Defense Contract Management Agency issuing Northrop Grumman with a Corrective Action Request in May 2013 for “recurring defects” in the component. The company now claims that the issue has been rectified as the Navy considers whether the UAV is fit for a $4 billion low-rate production phase.
June 24/16: The US Navy has announced the operational testing of an MQ-4C, which successfully transmitted full motion video to a P-8A via the Common Data Link (CDL). During the flight, the UAV had to use its electro-optical/infrared camera to build situational awareness of its environment before the P-8A arrived at the scene. The MQ-4C Triton’s ability to perform persistent intelligence, surveillance and reconnaissance within a range of 2,000 nautical miles will allow the P-8A aircraft to focus on their core missions.
February 18/16: The US Navy has completed the first of two operational tests on Northrop Grumman’s MQ-4C. While data on the tests is still being analyzed, a favorable review could see a low rate procurement contract awarded in the second quarter of this year, a year ahead of the next operational test event. Initial plans for the UAV involve providing broad area surveillance over 5 orbits encircling the globe, then cueing the manned P-8A Poseidon to inspect closer or deploy weapons. Initial predictions of fleet loss of four per 100,000 hours led the Navy to order 70 to maintain an operational fleet of 20. This has, however, has come under scrutiny from the Department of Defense and could lead to the Navy reviewing and altering their attrition requirement.
November 20/15: he Northrop Grumman MQ-4C Triton UAV has reached a significant stage as it now enters the program’s Milestone C review. Operational tests will involve six test flights and if successful will lead to the Initial Operational Test & Evaluation (IOT & E) phase. Successful testing of the UAV will lead to a production contract (albeit at low levels initially) with the Navy committed to ordering three in 2016 but will increase orders to 68 in 2017. Overseas contracts potentially include seven of the Tritons being procured by Australia with Germany, India and the UK also looking at purchases.
FY 2015
August 21/15: Meanwhile, the heavyweight MQ-4C Triton UAV is scheduled to undergo a Navy operational assessment in September, with an initial production contract slated for next year hanging on successful completion of this assessment. The two months of testing could lead to a Milestone C decision and subsequently a production contract, ahead of an anticipated Initial Operation Capability date of 2018. The procurement of up to seven Tritons by Australia, announced in March 2014, is also dependent on the UAV achieving these milestones.
June 22/15: On Friday the Navy handed Northrop Grumman a $60.9 million contract to support the Broad Area Maritime Surveillance – Demonstrator (BAMS-D) UAV, also known as the MQ-4C Triton. The company was awarded a contract last week to improve the air-to-air subsystem design of the Triton. The Navy announced in March that the UAV’s first deployment will be to Guam.
June 16/15: In a third and final contract awarded to Northrop Grumman on Monday, the firm was handed a $39.1 million contract to improve the current air-to-air radar subsystem design of the Navy’s MQ-4C Triton UAV and to demonstrate that the radar technology is feasible and risk-mitigated. The Navy has previously stated that it intends to fit a “due regard” radar to the Triton, as part of capability upgrade scheduled for introduction by 2020.
March 9/15: First deployment scheduled. An MQ-4c Triton will be deployed to Guam in FY 2016, according to information passed to Congress from Admiral Jonathan Greenert, chief of naval operations. The drone, capable of staying in the air for more than a day, was first flight tested just six months ago.
Nov 3/14: Sense-and-Avoid. After canceling the original plan for a “due regard” sense-and-avoid system to prevent collisions with other aircraft (q.v. April 9/14, Aug 13/13), the Navy has re-issued a less advanced RFI.
Instead of requiring radars that could handle ground clutter for low-altitude landings, the MQ-4C will take the more sensible approach of using airport radar data. Instead of demanding full capability up front, the Navy wants a “modular” and “scalable” design that will be improved over time. Ultimately, they want Triton to comply with ICAO ANNEX 2, Section, 3.2; U.S. Code of Regulations (CFR) Part 91.111 and 91.113; and Department of Defense Instruction (DoDI) 4540.01 guidelines for safe flight. But they’re willing to begin with DoDI 4540.01. Sources: FBO.gov #N00019-15-P7-PMA-262-0029, “MQ-4C Triton Unmanned Aircraft System (UAS) Sense and Avoid Air-to-Air Radar Capability” | Flightglobal, “US Navy re-starts sense and avoid radar for MQ-4C”.
FY 2014Basing; SIGINT limitations; Sense-and-
Avoid problems; Global Hawk Block 40 will have some maritime capability; Triton cuts coming?
Sept 23/14: Cuts? Reuters reports that reliability improvements in the MQ-4C may be a double-edged sword. The target had been 68 UAVs, in order to maintain 5 “orbits” of 4 UAVs on call for continuous surveillance. Better reliability could tempt the Navy to cut the number bought. The USAF’s RQ-4B Block 40s will also have some maritime surveillance capability (April 28/14), which adds to the pressure.
FY 2015 is expected to see the first production purchases of long-lead items, but budget cuts to date have already slowed program delivery to initial use in 2017, and IOC to mid-2018 with a full orbit of 4. Sources: Reuters, “UPDATE 1-Navy says may trim Northrop drone order due to better reliability”.
Sept 18/14: Testing. After an 11-hour, 3,290 nmi cross-country flight at 50,000 feet along the Mexican border, across Florida, and then up the Eastern Seaboard, Patuxent River, MD gets its 1st MQ-4C. PMA-262’s Pax River tests will include flight envelope expansion, sensor and communications testing, and interoperability testing. Sources: “Navy’s Triton unmanned aircraft completes first cross-country flight” | NGC, “MQ-4C Triton UAS Arrives at Naval Air Station Patuxent River, Enters Next Phase of Testing.”
July 4/14: Front-line thoughts. Foxtrot Alpha’s “Confessions Of A US Navy P-3 Orion Maritime Patrol Pilot” interviews a US Navy P-3C pilot who now flies P-8As. He also has some thoughts regarding the MQ-4C, and its performance compared to the current EP-3E electronic eavesdropping plane. His 3 areas of concern are bandwidth limitations, jamming, and real-time strike support:
“It is worth considering what the MQ-4C Triton can and cannot do. Any Signals Intelligence (SIGINT) operations by Triton will likely be limited by satellite bandwidth. I’m speaking from my own knowledge and assumptions here, but consider the task at hand. If you want real-time data off a UAV you have to transmit it via a satellite uplink to a ground monitoring station…. Is it more cost-effective to simply wait till the MQ-4C lands and accept that the downloaded intel will then be hours old? Maybe or maybe not.
Now let’s consider a wartime scenario. Other nations have demonstrated anti-satellite capabilities, including kinetic hard-kill capabilities against low Earth orbit satellites. While this isn’t a concern for geo-synchronous communications satellites, the ability to jam or spoof UAV satellite uplinks was possibly demonstrated during the loss of the RQ-170 [stealth UAV] over Iran. How secure exactly are our satellite uplinks? Are they safe from cyber attack? Will this bandwidth be available to the Navy during wartime or will more pressing communications take precedence? This is all above my pay-grade but realize that UAV endurance doesn’t come without a price.
There’s another factor to consider and that’s the nature of the EP-3E’s mission. EP-3s are capable of supporting a Carrier Strike Group’s air wing by providing communications and signals intelligence support. This is a distinctly ‘real-time’ function as enemy air defense operators may only speak for a few moments or activate SAM radars for several seconds. The latency (time delay) inherent in satellite communications and control systems could possibly mean the difference between life and death for strike pilots in F/A-18 Hornets heading into the target area. If you take away EP-3E, you may lose that real-time SIGINT and COMINT capability.”
April 28/14: Friendly competition? The USAF is touting success in an 11.5 hour RQ-4B Global Hawk Block 40 flight over the Point Mugu sea range in California.
This Maritime Modes program risk reduction work involves testing software that lets the Block 40’s MP-RTIP AESA radar use a Maritime Moving Target Indicator and a Maritime Inverse Synthetic Aperture Radar (MISAR) to track surface vessels. The MQ-4C has other naval capabilities beyond these, but then, MP-RTIP is well-tuned for land surveillance. As budgets decline, Global Hawk variants that can do similar jobs may find themselves competing for budget dollars. Sources: USAF, “Air Force tests new surveillance capability”.
April 9/14: Sense-and-Avoid. The US Navy still wants to place this technology on the MQ-4C, not least because it will be required for low-altitude flying in many areas of interest. The problem is that miniaturizing the Exelis AESA radar turned out to be much harder than they thought, to the point where they had to pause and look at other options (q.v. Aug 13/13).
Above 18,000′, standard ADS-B (Automatic Dependent Surveillance-Broadcast) and TCAS (Traffic Collision Avoidance System) “due regard” systems can keep the UAV from getting too close to civilian aircraft, and to many military airplanes as well. Below that altitude, ground and ship-based radars can be used, and something might be doable using aerial radars like AWACS plus datalinks. On the other hand, the whole point of the MQ-4C is to survey areas where those assets aren’t already on patrol.
This is a serious issue for UAVs generally, so it may be worth biting the bullet and investing the funds required to solve the problem. It may even be a hard and significant enough problem to justify DARPA’s involvement. Sources: USNI, “Navy Expanding Search for ‘Sense and Avoid’ Technologies for Triton”.
March 31/14: GAO Report. The US GAO tables its “Assessments of Selected Weapon Programs“. Which is actually a review for 2013, plus time to compile and publish. The program dashboard and timeline have been updated accordingly, though the Navy’s program office has authorized NGC to develop a new target baseline and schedule with increased costs and schedule delays. That isn’t represented in the charts yet. The program has 3 big technical risks left.
One is software, thanks to about 1.6 million lines of new code in an 8 million line system. There are another 2 software phases left before operational evaluation begins in January 2016.
Another is navigation. In September 2013, the Global Hawk program experienced an anomaly with a navigation system, suspending the derivative Triton’s test flights until a workaround was identified. The problem remains unfixed.
Finally, the air-to-air “sense and avoid” radar subsystem (q.v. Aug 13/13) for operating in civil airspace has hit a wall, and delayed the program by about 1 year.
March 28/14: Infrastructure. The Guam MACC Builders joint venture in Honolulu, HI wins a $45.5 million firm-fixed-price task order under a multiple-award construction contract. they’ll design and build a high bay maintenance hangar to support MQ-4C forward operations and maintenance at Andersen AFB, Guam. That involves scheduled inspections, airframe repairs, pre- and post-flight operations, as well as technical order compliance and aircraft modifications. A pair of unexercised options could raise the total to $46.7 million.
All funds are committed immediately, using a combination of FY 2010 and FY 2014 budgets. Work will be performed in Yigo, Guam, and is expected to be complete by April 2016. Six proposals were received for this task order by NAVFAC Pacific at Joint Base Pearl Harbor-Hickam, HI (N62742-10-D-1309, #0003).
March 24/14: Testing. The Mq-4C has completed the envelope expansion portion of its test flights (q.v. Jan 6/14). Sources: NGC, “Northrop Grumman, U.S. Navy Complete Initial Flight Testing of the Triton Unmanned Aircraft System”.
March 4/14: FY15 Budget. The USN unveils their preliminary budget request briefings. Precise figures are only offered later, but the Navy does offer planned purchase numbers for key programs between FY 2014 – 2019.
MQ-4C Triton production was supposed to start with 3 UAVs in FY15, but that isn’t happening because the program is behind. In addition to the late start, the Navy’s mid-term budgets will also slow the production ramp-up. Production begins in FY16 instead with 4 (unchanged), and continues with 4 in FY17, 4 in FY18 (-2), and 4 in FY19 (no previous comparable). Subsequent documents show that the program’s overall budget doesn’t change all that much, but around $400 million is added to R&D, and costs per UAV rise a bit. Those costs may drop a bit in future, if Australia buys in as expected.
The immediate pause makes sense, but the vastness of the Pacific and supposed importance of the “Pacific Pivot” don’t seem to be getting a lot of weight in the Navy’s 5-year plan – which also cuts P-8 sea control aircraft, and E-2D Advanced Hawkeye AWACS. Sources: USN, PB15 Press Briefing [PDF].
Jan 6/14: Testing. Northrop Grumman announces that the MQ-4C is half-way through the envelope expansion portion of flight testing. It’s still early days, with the longest mission being just 9.4 hours at up to 50,000 feet. Sources: NGC, “Multimedia Release — Northrop Grumman, Navy Complete Nine Flights of Triton Unmanned Aircraft System”.
Nov 4/13: Sub-contractors. Northrop Grumman Corp. and Triumph Aerostructures’ Vought Aircraft Division have finished initial MQ-4C structural strength testing at Vought’s Dallas, TX facility. Which means torturing the wings and bending them 22% beyond US Navy structural requirements, in hopes they don’t break or permanently deform. This isn’t just a life-span issue. It’s a very immediate requirement whenever a Triton UAV has to drop down for a closer look at something, possibly through inclement weather.
Vought was involved in these tests because they produce Global Hawk family wings. A fatigue test of the entire airframe will begin in 2017. Sources: NGC, Nov 4/13 release.
Oct 7/13: Basing. The Whidbey News-Times reports that the MQ-4C’s Tactical Support Centers for command and control will be placed at the 2 main P-8A support centers: NAS Jacksonville, FL and NAS Whidbey Island, WA. It seems like a fairly obvious operational conclusion, but it was also the consensus of environmental assessments.
“Four of the MQ-4C Tritons will be based out of Ventura County Naval Base in California [by 2016], but the existing P3 tactical support center at Whidbey Island Naval Air Station will be expanded to support both the P8-A and the Triton…”
Sources: Whidbey News-Times, “New drone supports P-8A Poseidon”.
FY 2012 – 2013Test plan approved and BAMS becomes “MQ-4C Triton”; NGC buying 1 for itself; Australia renews interest, but it’s lukewarm; India is interested; DOT&E testing report; RQ-4A BAMS-D crash; Sense and Avoid tech suspended.
MQ-4C: 1st flightSept 9/13: Australia. Australia’s Liberal Party is back in power after a convincing electoral win over Labor. While the new government’s commitment to 2% of GDP for defense spending is a broad positive for industry, their level of commitment to the MQ-4C weakened:
“The acquisition of unmanned aerial vehicles will be dependent on the advice of the chief of the Defence Force and service chiefs, as well as a clear cost-benefit assessment that demonstrates the value of these aircraft.”
Triton is likely to pass that test, but this is a step back from earlier statements to the effect that Triton was a high-priority buy. Sources: Australian Liberal Party, “The Coalition’s policy for Stronger Defence” | Defense News, “New Australian Leadership Pledges to Boost Defense Spending”.
Aug 14/13: Infrastructure. Small business qualifier Whitesell-Green, Inc. in Pensacola, FL wins a $15.9 million firm-fixed-price contract to build a BAMS Mission Control Complex at NAS Jacksonville, FL. It will be a freestanding 2-story structure with two Electromagnetic Interference Shielded Mission Control Systems, a Tactical Operations Center with sensitive compartmented information facility spaces, and numerous roof-top mounted antennas. This project will also renovate some interior spaces, including a reconfigured command suite, systems reconfiguration, and in some cases finish upgrades. Finally, additional antennas will be built at a remote site south of the new facility.
All funds are committed immediately. Work will be performed in Jacksonville, FL, and is expected to be complete by December 2014. This contract was competitively procured via Navy Electronic Commerce Online, with 8 proposals received by NAVFAC Southeast in Jacksonville, FL (N69450-13-C-1258).
Aug 13/13: Sense-and-Avoid. BAMS Program manager Navy Capt. Jim Hoke says that ITT Exelis’ radar-based Airborne Sense And Avoid system (q.v. Aug 10/12) is “behind schedule,” so the Navy has “made a decision to pause on the capability right now” and has stopped work. Hoke says that he understands how important this capability is for operations in crowded airspace and allied countries (vid. May 29/13, May 14/13), especially given the MQ-4C’s operational need to descend to lower altitudes at times for a closer look, but “all options are on the table.” If the system really is seen as critical, that could mean a re-compete of the sub-program, or the Navy could decide to join the USAF’s ABSAA effort (q.v. July 30/12).
Re-competes can be problematic, but this may be a case where the circumstances are attractive. The natural scalability of AESA radars means that any successful implementation could be applied to other large UAVs, from NATO’s planned RQ-4 Block 40 AGS Global Hawk variant, to smaller MALE UAVs like the MQ-9 Reaper or MQ-1C Gray Eagle. That’s a significant and growing opportunity for the winning contractor, with follow-on “proven leader” opportunities around civil UAV use. This dynamic could attract firms willing to invest up front with low bids or substantial resources, and the base ABSAA field is a mature one thanks to civil aircraft. Breaking Defense.
Sense-And-Avoid radar on hold
June 25/13: Australia. With an election coming, the MQ-4C Triton seems secure, as both parties remain committed to it. Reuters:
“There’s not a lot of new money in our policy, (but) we are going into Broad Area Maritime Surveillance, the Triton,” said conservative defense spokesman David Johnston, who is likely to become defense minister following the September 14 elections…. “This is about maritime security and surveillance in the Indian Ocean,” a senior Labor insider with close knowledge of defense planning said. “This is a force multiplier. It’s better to think of Triton as a mobile satellite we can steer around the Indian Ocean,”
June 14/13: Sense-and-Avoid. BAE Systems’ AN/DPX-7 Reduced Size Transponder (RST) Indentification Friend-or-Foe system flies on the MQ-4C for the 1st time. IFF transponders broadcast coded location signals to friendly aircraft, and also receive signals from civil and military aircraft around them. They aren’t a complete solution to the problem of operating in crowded airspace, but with the right programming and UAV flight system connections, they can help. Unmanned Systems Technology.
May 29/13: Sense-and-Avoid. Answers from Northrop Grumman clarify the MQ-4C’s sense-and-avoid systems:
“Triton’s due regard radar is meant to provide safe separation of aircraft while the system is in flight at lower altitudes. The U.S. Navy’s mission requires that Triton be able to descend to lower altitudes to make closer identification of surface vessels. The radar is still in development and would be flight tested on Triton at a later date. This is a Navy requirement to ensure that the Triton UAs can safely operate over international waters.”
With respect to ICAO certification issues, Northrop Grumman would only say Global Hawk is the first unmanned aircraft system to achieve a military airworthiness certification. That can only be used to fly a pre-approved, monitored flight plan in American civil airspace, and then only if a specific supplemental FAA certificate of authorization (COA) is granted in advance. Whether this level of certification will work at NAS Sigonella, Italy is a question that the US Navy will need to answer. “Saigon” has already been a base of operations for RQ-4B Block 20 Global Hawks, which lack any form of collision avoidance system. The question is how restricted future MQ-4C flight options would be, absent further certifications.
May 22/12: Fly! The MQ-4C has its 1st flight. The flight was originally scheduled for March 2013, but all goes well, The Navy and Northrop Grumman flight test team conducts an 80 minute flight from Palmdale, CA, reaching up to 20,000 feet while remaining within restricted airspace.
Northrop Grumman says that additional flight tests will take place from Palmdale to mature the system, before it’s flown to the main flight test facility at NAS Patuxent River, MD, later this year. It will be interesting to see if it flies there under its own power, or is disassembled and carried in a heavy-lift aircraft. Even the carrier-based X-47B stealth UCAV had to travel to Pax River on a truck, because the FAA wouldn’t certify it for flight in civil airspace. The MQ-4C is designed with a sense-and-avoid system, so the FAA could conceivably grant it a waiver. US Navy Capt. Jim Hoke is the current Persistent Maritime UAS office (PMA-262) program manager, and it will be up to him to oversee transportation arrangements. US Navy | US NAVAIR | US Navy Live | NGC.
1st flight
May 22/13: XP – 7. Northrop Grumman Aerospace Systems in Bethpage, NY receives a $15.3 million cost-plus-award-fee contract modification to upgrade some MQ-4C Triton components from Windows XP to Windows 7. Microsoft is ending support for XP, hence the shift, which will happen in quite a few US military programs. We wonder about the security implications of using Windows at all in an incredibly expensive autonomous system, but that’s a separate discussion.
Work will be performed in Hollywood, MD (33.5%); Bethpage, NY (25.8%); Rancho Bernardo, CA (15.6%); San Diego, CA (12.7%); Salt Lake City, UT (9.8%); Stillwater, OK (1.10%); Melbourne, FL (1.0%) and Van Nuys, CA (.05%), and is expected to be complete in April 2014. Funds will be committed as needed by US Naval Air Systems Command in Patuxent River, MD (N00019-08-C-0023).
May 16/13: Australia. Australia’s government announces that they’re sending a formal Letter of Request to the USA for the MQ-4C Triton UAV. The letter will become a Foreign Military Sales Technical Services Case with the United States Navy to obtain detailed cost, capability and availability information. They emphasize that they haven’t picked the MQ-4C yet for AIR 7000 Phase 1B, but they didn’t announce letters of request for any other platforms that might compete with the Triton, like General Atomics’ MQ-9. Which may have separate opportunities of its own:
“As also outlined in the 2013 Defence White Paper, Defence will analyse the value of further investment in unmanned aircraft for focused area, overland intelligence, surveillance and reconnaissance, including for use in border security operations. This will include the potential expansion of the role of these assets in the ADF to include interdiction and close air support, subject to policy development and Government consideration.”
See: Australia DoD | US NAVAIR.
May 14/13: Euro Hawk falls. Germany has decided to end the Euro Hawk UAV project, after spending EUR 562 million on system development and test flights. Not only would it cost hundreds of millions more euros to attempt EASA/ICAO flight certification, but German authorities reportedly lacked confidence that they would receive a certification at the end of the process. Rather than pay another EUR 600 – 700 million for additional UAVs and equipment, and an equivalent amount to attempt EASA certification, Germany will attempt to find another path.
The remaining questions fall instead on Sigonella, Italy, where NATO and the USA plan to base MQ-4C Tritons, and RQ-4B AGS Global Hawk Block 40s. German lawmakers are raising those questions, and some are advocating pulling out of NATO’s AGS as well.
March 4/13: Australia. Aviation Week reports that Australia may want more P-8As, at the possible expense of its MQ-4C companion UAVs:
“The RAAF is quietly making a case for 12 Poseidons, arguing that eight would not be enough to cover the vast oceans surrounding the continent. And the unmanned requirement is now described as “up to” seven high-altitude, long-endurance aircraft, potentially reducing Northrop Grumman’s opportunity. At the same time the air force sees an argument for a supplementary drone, possibly the Predator, to take on some of the electronic-intelligence missions that would otherwise fall to the Poseidons and Tritons.”
This is a bit of a head-scratcher. The stated purpose of sustained ocean coverage would be better served by adding another orbit of 3-4 MQ-4Cs (to 10-11), using the P-8s as more of a fleet overwatch and contact response force. Likewise, it makes little sense to use a different UAV for ELINT/SIGINT collection, especially the slow and shorter-range MQ-9. Rather, one would use the MQ-9s in nearer-shore maritime and EEZ patrols, along the lines of the 2006 Northwest Shelf experiments, in order to free up MQ-4Cs for longer-range expeditions over strategic corridors, and the ELINT/SIGINT mission they will be equipped for as of Increment 3.
Feb 22/13: Australia. Australia may have officially dropped out of the BAMS development phase (vid. March 2/09 entry), but News Corp. reports that Defence Minister Stephen will sign a formal export letter of request for the MQ-4C at the 2013 Australian International Airshow. Australia has remained part of the P-8A program for a manned sea control jet, so the MQ-4C is a natural pairing.
The purchase budget is expected to be $A 2-3 billion, but it may be overshadowed by Australia’s expected announcement that they will buy another 24 F/A-18F Super Hornets. News Corp.
Feb 7/13: India. Northrop Grumman’s MQ-4C business development lead Greg Miller tells Shephard’s UV Online that India’s RFI for a High Altitude, Long Endurance maritime surveillance platform holds promise:
“They want to follow the US model; P-8 and Triton…. The Indian Navy agrees with the US’ requirements, which exactly fits our sweet spot.”
Their problem is the same problem facing South Korea: the Missile Technology Control Regime (MTCR), which bans the export of cruise missiles or unmanned vehicles with certain range and payload limits. India hasn’t signed MTCR, but the issue needs to be resolved at a government-to-government level. UV Online.
March 28/13: GAO Report. The US GAO tables its “Assessments of Selected Weapon Programs“. Which is actually a review for 2012, plus time to compile and publish. With respect to BAMS, they say the design is stable, with 99% of drawings releasable to manufacturing. Software code is a challenge, as are the UAV’s new-design wings. Disruptions to the USAF’s Global Hawk programs aren’t expected to affect schedule, but fewer UAVs produced does drive up the cost per UAV. Excerpts:
“The second development aircraft, the first aircraft with a full sensor suite and the air-to-air radar subsystem, is nearing completion and is expected to begin testing in 2013…. However, the program poses a significant software development challenge, utilizing nearly 8 million lines of code, more than 20 percent of which will be new. Much of the remaining software is derived from Global Hawk; however, officials noted that integration and testing of this code is taking longer than expected. Officials also noted that delays in the manufacturing of the aircraft wing as well as corrections to software during integration of subsystems are the primary reasons for a delay in the program’s operational assessment and production decision….”
Jan 17/13: DOT&E testing. The Pentagon releases the FY 2012 Annual Report from its Office of the Director, Operational Test & Evaluation (DOT&E). The MQ-4C Triton is included, and the program is falling behind. The plan was to conduct an Operational Assessment in June 2013, leading to a Milestone C decision in October 2013.
Unfortunately, a combination of UAV mission computer software stability problems, and radar performance issues identified in tests with Northrop Grumman’s radar-equipped Gulfstream-II jet, delayed flight testing from May 2012 to “at least” January 2013. The program has also “deferred development and testing of [unspecified] air vehicle and sensor capabilities until after Milestone C in order to reduce current test schedule pressures.”
The plan to reach Milestone C by October seems less and less likely, especially given additional “ground test delays encountered in [fall 2012].” Northrop Grumman will also need to resolve issues with software stability for both the mission computer and ZPY-3 MFAS radar, radar detection and tracking consistency, and radar image quality.
Jan 8/13: Company bird. Northrop Grumman is spending its own money to build and equip its own MQ-4C UAV, complete with the same sensor set the Navy will get. The UAV is under construction, and just had its wings and fuselage joined.
It isn’t the first time Northrop Grumman has done this; indeed, in many ways it’s just a further extension of the company Gulfstream-III business jet test bed, which has been flying since before the development contract was awarded. Initial missions for the company’s UAV will involve supplementing Navy tests, in order to help the team reach their goal of operational UAVs by late 2015. Eventually it will become a platform for demonstrations, integration of different sensors that the US Navy or other customers are interested in, and system performance improvement testing.
1 MQ-4C for Northrop Grumman
September 2012: Testing. A 2nd MQ-4C is added to ground test efforts, with a focus on control software and subsystems. NGC.
Aug 10/12: Sense-And-Avoid. ITT Exelis exhibits their BAMS airborne sense-and-avoid (ABSAA) radar for the first time, at the Unmanned Systems North America conference in Las Vegas. It’s the 1st U.S. Department of Defense ABSAA/ ICAO “due regard” radar program of record, with flight testing expected to start in Q1 2013.
Aug 10/12: Sense-And-Avoid. ITT Exelis exhibits their BAMS airborne sense-and-avoid (ABSAA) radar for the first time, at the Unmanned Systems North America conference in Las Vegas, NV. It’s the 1st US Department of Defense ABSAA/ ICAO “due regard” UAV radar program of record, with flight testing expected to start in Q1 2013.
Their “SkySense 2020H” can be adapted for other UAVs, but the self-contained, 50 pound MQ-4C configuration involves 3 thin-tile AESA array panels mounted at the front of the UAV. It operates in the Ku-band with an 8-10 nmi range, and a 110 degree wide x 30 degree high field of view. AESA radars are flexible if the right software is installed, and Exelis is also looking at using SkySense for weather radar and communications functions. AIN Online.
July 2012: Testing. 1st MQ-4C Triton begins ground tests. NGC.
July 30/12: Sense-And-Avoid. The USAF Research Laboratory (AFRL) has been working on a sense-and-avoid system called Multiple Intruder Autonomous Avoidance (MIAA) since 2008, and is about to conduct the final test phases using a Calspan-operated Learjet as an RQ-4 surrogate. Co-operative commercial aircraft are dealt with using standard methods: a traffic collision avoidance system and ADS-B. Aviation Week says that for non-cooperative aircraft:
“The flights will evaluate collision-avoidance algorithms and a new electronically scanned sense-and-avoid radar, as well as a new technique to perform passive target ranging from the two-dimensional imagery provided by electro-optical sensors.”
Once they’re done, MIAA will become move to EMD system development as part of the USAF’s Global Hawk program. The Navy and Army are both interested, however, and are partners in this effort. A Global Hawk flight is planned in 2015, with Initial Operating Capability planned in 2017. Aviation Week, via NPS.EDU: “Sense-And-Avoid System To Transition To Global Hawk”.
June 14/12: Triton unveiled. Northrop Grumman and US NAVAIR unveil the 1st MQ-4C at Northrop Grumman’s Palmdale, CA plant, and announce its operational moniker: “Triton.” In mythology, Triton was Poseidon’s son, the messenger of the sea. US NAVAIR | Northrop Grumman.
MQ-4C “Triton”
BAMS-D CrashJune 11/12: BAMS-D Crash. An RQ-4A BAMS-Demonstrator Global Hawk crashes into a marshy tributary of Maryland’s Nanticoke River, during a routine training flight from Naval Air Station Patuxent River. There were no injuries to civilians and no property damage, but the crash site has been blocked to recreational boat traffic while the agency investigates. The crash leaves 4 UAVs in the program: 3 for testing, tactics, and doctrine development in the USA, and 1 deployed abroad with the 5th fleet. CNN | Wired Danger Room | WBOC.
May 30/12: Canada. Northrop Grumman Corporation and Canada’s L-3 MAS announce plans to offer Canada a “Polar Hawk” UAV for surveillance of Canada’s arctic land and seas.
As one might guess, it will need to share a number of structural features like strengthened wings and improved de-icing with the MQ-4C Triton. Improved satellite communications, with specialized receivers for polar-orbit satellites, will also be necessary. Sensors aren’t discussed, but the accompanying picture shows a conventional Global Hawk shape, without the AN/ZPY-3 MFAS. NGC.
May 29/12: More SDD. Northrop Grumman Aerospace Systems in Bethpage, NY receives a $32.8 million cost-plus-award-fee contract modification, for BAMS system development and demonstration. This modification funds a maintenance concept change that will develop a logistics management I.T. system, and improve the transition from contractor logistics support to organic military maintenance by the Navy. Funding will be committed as needs arise.
Work will be performed in Bethpage, NY, (74.54%), Rancho Bernardo, CA (20.82%), Melbourne, FL (4.59%), and Palmdale, CA (0.05%); and is expected to be complete in September 2015 (N00019-08-C-0023).
January 2012: Testing. The Pentagon approves the MQ-4C Triton Broad Area Maritime Surveillance Test and Evaluation Master Plan (TEMP), which will guide efforts to bring the UAV to a successful Milestone C decision, and into low-rate initial production. DOT&E.
Test plan approved
FY 2010 – 2011Designation shifting to MQ-4C; Sub-systems in development.
Global HawkApril 25/11: ZPY-3. Northrop Grumman announces the start of system tests for the BAMS UAV’s Multi-Function Active Sensor (MFAS) maritime surveillance radar. MFAS will use a 2-dimensional radar with both electronic and mechanical scanning.
Northrop Grumman’s Aerospace Systems sector facility in San Diego, CA is expected to take delivery of the 1st MFAS in June 2011, following ongoing radar software mode development and hardware synchronization and integration activities. A 2nd radar is slated for delivery in September 2011, and risk reduction flight tests on board the company’s Gulfstream II test-bed expected before year end.
March 16/11: Northrop Grumman Corporation completes the 1st of 3 BAMS fuselages under the SDD phase. The MQ-4C fuselage will undergo final assembly and system checkout at the company’s Palmdale, CA facility, ahead of its first flight in 2012. NGC.
March 7/11: CDR. Northrop Grumman announces that the BAMS program completed its system-level Critical Design Review (CDR) with the U.S. Navy in February 2011 – but it is not fully closed yet. The government and Northrop Grumman teams will be working to close out issues raised during the CDR, before it can be officially over.
The system-level full CDR sets the initial product baseline for the MQ-4C system, and was preceded by 10 subsystem and segment CDRs. Northrop Grumman VP and BAMS program manager Steve Enewold says that the SDD phase’s first 2 UAV fuselages are being built at Moss Point, MS, and the first will ship in April 2011 to Palmdale, CA for final assembly. The next major milestone is Test Readiness Review, planned for fall 2011. First flight is expected in 2012, and Enewold says the program continues to meet its acquisition baseline cost, schedule and performance requirements.
Feb 18/11: Sense & Avoid. Northrop Grumman Aerospace Sector’s Battle Management & Engagement Systems Division in Bethpage, NY receives a $25.6 million cost-plus-fixed-fee delivery order to develop an “airborne sense and avoid capability for the Broad Area Maritime Surveillance (BAMS) unmanned aircraft system in support of the Navy and Air Force.” The goal is a TRL 7 system, i.e. a prototype tested in operationally-relevant conditions.
The wording is interesting, as it implies that USAF RQ-4A/B Global Hawks will also be fitted with this capability. As they should be. Sense and avoid technologies are used in commercial aircraft, in order to prevent mid-air collisions. While flying at 60,000 feet will go a long way toward zero collisions, the UAVs do not begin at that altitude, and BAMS in particular will not spend all of its mission time at that level. Throw in funded experiments like aerial refueling between 2 Global Hawk UAVs, and expectations that the stratosphere is likely to be more crowded in future, and the necessity of sense & avoid technologies becomes clearer. To this point, however, the US Navy and USAF have pursued different technology approaches: an ITT-supplied air-to-air radar and ADS-B cooperative surveillance for the Navy, and a multi-sensor “multi-intruder autonomous avoidance (MIAA)” USAF project that uses 3 electro-optical cameras, a low-power radar, and the civil TCAS traffic collision avoidance system.
Work to reconcile those approaches into a common prototype will be performed in Bethpage, NY (50%) and San Diego, CA (50%), and is expected to be complete in November 2012. $7,368,022 will expire at the end of the current fiscal year, on Sept 30/11 (N00019-10-G-0004). See also: Aviation Week.
Feb 9/11: Northrop Grumman announces a $3.3 million contract to participate in the Unmanned Aircraft System (UAS) Control Segment (UCS) Architecture Working Group (UCSWG), sponsored by the Office Secretary of Defense’s (OSD) Unmanned Warfare Office.
The UCSWG is an open technical standards committee consisting of industry and government representatives from each UAS program of record, several emerging UAS programs and small businesses. The objective of the UCSWG effort is to define a common UAS control station architecture based on standard data models and service interface definitions to enable interoperability, scalability and adaptability of UAS ground stations.
Sept 1/10: New designation. A ceremony at Northrop Grumman’s Moss Point, MS manufacturing facility marks the beginning of RQ-4N BAMS UAV construction.
It is also the first official mention of the platform’s MQ-4C designation. Northrop Grumman spokesman Jim Stratford explains that “M” stands for “Multi-mission,” referring to planned expansion to communications relay and SIGINT missions. The “C” is because there are significant differences from the USAF’s RQ-4B Block 20/30/40, such as anti-icing and sense/avoid capabilities. The “RQ-4N” was Northrop Grumman’s designation during the BAMS competition, but it was never official. Northrop Grumman.
March 3/10: Sub-contractors. Curtiss-Wright Corporation announces a $25 million contract from Northrop Grumman Corporation to provide BAMS’ Advanced Mission Management System (AMMS). Curtiss-Wright will design, develop and manufacture BAMS UAV AMMS units at the company’s Motion Control facility in Santa Clarita, CA Hardware deliveries will start at the end of 2010 and continue through 2011.
FY 2008 – 2009BAMS System Development & Demonstration contract; Australia steps back from BAMS program.
Australian RQ-4N? No.Aug 13/09: USAF getting ideas? The Shepard Group reports that The United States Air Force is exploring a potential communications suite re-architecture for its RQ-4 Global Hawk fleet, based on the Navy’s RQ-4 BAMS set. The BAMS de-icing system has also attracted interest.
April 27/09: Northrop Grumman Integrated Systems in Bethpage, NY received a $22.4 million modification to a previously awarded cost plus award fee BAMS System Development and Demonstration (SDD) contract (N00019-08-C-0023). This modification will add wing static and load testing for the BAMS RQ-4N UAS.
Work will be performed in San Diego, CA (90%) and Bethpage, NY (10%), and is expected to be complete in December 2012.
March 2/09: Australia out. Defense minister Joel Fitzgibbon announces that Australia will not be exercising its option to continue as a member of the BAMS program. The country is shelving the “AIR 7000 Phase 1B” project, in order to concentrate on the introduction of the 737-based P-8A Poseidon instead. Despite the minister’s focus on operational difficulties and schedule slips, Northrop Grumman’s statements cite fiscal pressures as one of the key reasons behind the decision.
Australia will probably want and need maritime patrol UAVs at some point, and its public-private CoastWatch program already has a provision for introducing some to the mix over the next decade. The question around BAMS is what price Australia might pay in penalty fees, if any, should the country decide to rejoin the BAMS program at a later date. Australian DoD | The Australian | Canberra Times.
Australia out
Feb 4/09: Delays. Aviation Week reports that the BAMS schedule has slipped, owing in part to delays created by Lockheed Martin’s protest. The first RQ-4N BAMS will begin testing in FY 2012 instead of FY 2011, with low-rate production beginning in FY 2013, and initial operational capability declared by FY 2016 instead of 2015. Full delivery is now expected by FY 2019.
Feb 4/09: Reports indicate that one of the Gobal Hawk Maritime Demonstration UAVs has deployed to CENTCOM’s theater of operations by the US Navy. Information Dissemination believes that its future will include pirate tracking off of Africa’s eastern coast. GHMD is a limited program that is both a predecessor to BAMS, and a way to experiment and learn how an advanced maritime patrol UAV can be used in real world operations (CONOPS).
Dec 23/08: Northrop Grumman announces that U.S. Navy’s Air Test and Evaluation Squadron (VX-20) gave the RQ-4 Global Hawk Maritime Demonstration (GHMD) team its Q2 2008 Test Team of the Quarter award. To date, the 2 GHMD demonstrator aircraft have flown more than 1,350 hours.
The team’s accomplishments included performing more than 1,000 hours of flight operations over an 18-month period, troubleshooting issues with the communications system, integrating the automatic identification system into the aircraft so it can be used in civilian air space, conducting tests with the ocean surveillance initiative, and developing tactics and guidelines for unmanned patrol systems. From January to June 2008, the team also supported various operational activities, including the Southeastern Anti-Submarine Warfare Initiative 08-2, the USS Iwo Jima Group Sail, and the Commander Carrier Strike Group 8. The team’s successes during this period culminated with the Trident Warrior exercise in June 2008, when the team flew more than 113 hours over a 5-week period, including an unplanned 23-hour humanitarian mission in which a GHMD was re-tasked to assist in the Northern California wildfires. July saw the UAVs participate in the Rim of the Pacific 2008 fleet exercise, which saw the team finish 4 missions totaling more than 92 hours.
Sept 29/08: Rolls Royce puts out a release confirming that Northrop Grumman has selected their AE 3700H engine to power the RQ-4N BAMS UAV. This is hardly a surprise, as Rolls Royce was part of the bid team and those same engines power non-naval Global Hawks. Rolls Royce release.
Aug 8/08: The Congressional Government Accountability Office (GAO) denies a protest from the Lockheed Martin MS2/ General Atomics team, which offered its MQ-9 Reaper derived Mariner UAV for BAMS. The grounds of that denial were interesting, and included improvement in Northrop Grumman’s contractor performance in comparable programs like the USAF’s MQ-9 systems. An improvement that was not matched by similar corrective successes at General Atomics.
The BAMS program had been frozen while the appeal went forward, but it is now free to begin in earnest. US Navy NAVAIR announced on Aug 11/08 that the program would resume. See: GAO decisions #400135.1/2.
GAO denies protest, contract continues
April 22/08: Northrop Grumman Corp. Integrated Systems in Bethpage, NY won a cost-plus-award-fee contract with an estimated value of $1.16 billion for the BAMS System Development and Demonstration (SDD) phase. This phase includes the design, fabrication, and delivery, of 2 unmanned RQ-4N Global Hawk variant aircraft with mission payloads and communications suites; one Forward Operating Base Mission Control System; one Systems Integration Laboratory; and one Main Operating Base Mission Control System.
Work will be performed in Bethpage, NY (30%); San Diego, CA (25%); various locations throughout the United States (13%); W. Salt Lake City, UT (9%); Rolling Meadows, Ill., (7%); Falls Church, VA (6%); Baltimore, MD (5%); and Norwalk, CT (5%), and is expected to be complete in September 2014. This contract was competitively procured through a request for proposals; 3 firms were solicited and 3 proposals were received, as the RQ-4N beat out the General Atomics Mariner and Boeing’s “optionally manned” G550 for the contract (N00019-08-C-0023). See also US DoD release | Northrop Grumman release.
BAMS SDD
Jan 31/08: An 18-month, $15 million cooperative agreement between the United States and Australia becomes part of the pre-system development and demonstration processes for the US Navy’s Broad Area Maritime Surveillance Unmanned Aircraft System program. DC Military.
FY 2007 and EarlierBAMS competition and contenders; Australia joins the program.
NGC’s Gulfstream IISept 4/07: General Atomics talks about their BAMS efforts, which they are undertaking in conjunction with Lockheed Martin. The firm announces successfully completion of wind tunnel testing at the San Diego Air & Space Technology Center on a 1/10 scale model of its Mariner, which “exceeded our expectations… Preliminary evaluations validated key competitive capabilities of the aircraft and suggest that Mariner’s design is even more efficient than originally assumed.”
Basically, the testing enabled a specific set of configuration changes to be evaluated at a lower cost and faster pace, while generating important data regarding performance and statistical sensitivities.
Aug 6/07: Northrop Grumman promotes its “sense and avoid” approach, which is intended to meet the BAMS requirement of safely operating alongside manned military and civilian aircraft.
Though they rely in part on high-end capabilities like the Global Hawk’s radar, UAV deconfliction is a major industry issue and the underlying algorithms used are likely to be significant beyond BAMS – in its X-47B UCAS-D unmanned naval fighters, for instance.
June 18/07: Boeing enters the fray. The BAMS 550 would create a manned/unmanned version of the Gulfstream G550 business jet (already in service with the Navy) with fully integrated sensor and communications suites and an advanced mission control system. The Boeing BAMS 550 industry team consists of Boeing, Gulfstream, Raytheon, Rolls-Royce and Honeywell, and touts “an offering that significantly improves upon the historically low reliability, limited payload and extensive support requirements of legacy unmanned aircraft systems.” The Register | Boeing handout [PDF]
May 24/07: Northrop Grumman Corporation discusses its BAMS offer and proposed approach. Their offer is based on an RQ-4N maritime-configured RQ-4B Global Hawk, that will meet “all of the threshold and more than 90% of the Navy’s objective requirements.” The RQ-4N will benefit from the GHMD contracts and efforts already undertaken with the US Navy.
Northrop Grumman’s approach is called Head Start, and is organized around step by step risk assessment that concentrates on system elements, sensor effectiveness, and demonstrating a ForceNet-compliant communications system. Head start will also use a specially modified Gulfstream II business jet as a flying test bed, equipped with the radar sensor that Northrop Grumman is offering as part of its BAMS system. Bill Beck, BAMS Head Start program manager, says: “The test-bed will be used to perform end-to-end communication functionality testing using the Advanced Mission Management System for network, bandwidth and sensor control. It will be tied to a company-built prototype of the Mission Control System (MCS), located at our Hollywood, Md., facility.” The prototype MCS contains off-the-shelf commercial software and hardware components, in keeping with the US Navy’s drive toward upgradeable open architecture approaches.
Carl Johnson, NGC’s vice president of the BAMS program, claims that. “This approach creates a significant program schedule margin which ensures an initial operation capability well ahead of threshold requirements.”
The Northrop Grumman RQ-4N BAMS team includes Northrop Grumman as prime contractor and team leader, unmanned aerial vehicle supplier and developer of the Multi-Function Active Sensor active electronically scanned array radar and the Night Hunter II electro-optical infrared sensor; L-3 Communications providing communications integration; Raytheon supporting the Mission Control System segment; and Rolls-Royce providing the jet engine.
May 8/07: Lockheed Martin discusses its BAMS proposal, which involves the modified Mariner version of General Atomics MQ-9/Predator B. The firm has partnered with EDO, FLIR Systems, Honeywell, LSI, and Sierra Nevada Corp., and its entry will offer an Electro Optical Infrared (EOIR) high definition camera, Automatic Identification System (AIS) to identify ships at sea, a communications relay capability, and Link 16 among its systems.
The Mariner shares its avionics, fuselage, flight controls, and engine (Honeywell TPE-331-1OT turboprop) with the MQ-9/Predator B, but adds enhanced wings (88 foot wingspan) and tails to support the increased takeoff weight, plus 2,000 pounds of additional fuel, 34 antennas for communications, anti-icing and deicing capability, and a retractable EO/IR surveillance turret as part of its 1,350 pound internal payload. The design has an extra 800 pounds of internal payload to offer, plus 4,000 pounds of external payload, which can be carried up to 50,000 feet. Maximum range would be 7,100 nautical miles, albeit at a rather slower speed than the jet-powered RQ-4. The flip side is that the Mariner would be able to cruise for long periods at low altitudes, and do so efficiently. Defense Daily.
May 3/07: The Broad Area Maritime Surveillance Unmanned Aircraft System source selection process formally begins, with receipt of proposals from aerospace manufacturers. A winner is expected to be announced this fall following BAMS Milestone B approval, with a System Design and Development (SDD) contract award following soon after.
Cdr. Bob Dishman, the BAMS Integrated Product team lead, is quoted in a NAVAIR release as saying that “This is a full and open competition and we are satisfied with the number, breadth and technical maturity of the proposals we have received.” See full NAVAIR release.
Jan 29/07: Flight International reports that the US NAVAIR is delaying the release of tenders for its broad area maritime surveillance (BAMS) unmanned air system requirement until mid-February, in order to enable modification of bid documents to meet unique Australian requirements for the system.
Jan 13/07: Aussies in. Australia formally signs a project agreement to participate in the BAMS system development and demonstration phase.
July 28/06: The Australian government has given first pass approval to AIR 7000 Phase 1, under which Australia will spend A$ 1.0-1.5 billion to develop a “multi-mission unmanned aerial system.” Formal negotiations can now begin with the USA on a cooperative development program linked to BAMS, and a final participation decision is expected by late 2007. Australian industry participation will be a key factor, especially with respect to the Integrated Ground Environment for UAV control and fusion of sensor information.
Australia
Additional Readings & Sources Background: BAMS/ Triton and Key AncillariesIndia has been looking for a modern anti-tank/ infantry strike missile to take the place of MBDA Milan missiles that have been produced under license by Bharat Dynamics. The finalists in this competition were the American fire-and-forget Javelin, and Israel’s Spike with its combination of wire guided or fire-and-forget modes. As of October 2014, Spike appears to have won, despite offers from the USA to involve India in developing the next version of Javelin.
The Spike infantry system consists of a missile in its cannister, a tripod, a Command Launch Unit that contains the optics and firing system, and a battery. It can go from “off” to firing in less than 30 seconds, as the operator lays the cross hairs on the aim point using either the 10x day sight, or the clip-on thermal imaging night sight.
Fire-and-forget targeting uses the imaging infrared (IIR) seeker, but there’s also an optional fully guided mode, using a fiber optic wire that spools out from the rear. They can be combined via “fire and forget plus,” which locks a target before launch but can be used to change targets or abort after launch. The missile flies in a lofted trajectory, hitting the target in a terminal dive and detonating a tandem high-explosive warhead that can defeat explosive reactive armor. The lofted trajectory also allows the missile to hit targets that are behind earthen walls, or otherwise not directly visible in line of sight. Reloading takes less than 15 seconds.
Spike-MR/ Gill is designed as an infantry-only weapon, and weighs 26 kg/ 57.2 pounds when fully assembled (13.3 kg missile in cannister, 5 kg CLU, 4 kg Thermal Sight, 1 kg missile, 2.8 kg tripod). Its effective range is 2.5 km. Spike-LR is a vehicle and infantry weapon that uses common systems, and extends effective range to 4 km. Vehicle variants include launch mountings and a control console, and Spike has been integrated into missile-capable Remote Weapons Systems.
Beyond these infantry weapons, Spike-ER is a larger missile that equips a number of helicopter types, and reaches out to 8 km. A special helicopter and vehicle-mounted variant called Spike-NLOS extends range to 25 km, and relies heavily on “fire and forget plus” via optical guidance. Neither appears to be on India’s acquisition radar just yet, but once Indian firms are license-building Spike family weapons, the government can always sign subsequent agreements to broaden its scope.
Contracts & Key Events Spike componentsJune 6/18: India Spike deal? India has again voiced its interest in acquiring the Israeli made Spike missile as means to boost its anti-tank capability against arch rival Pakistan. The Indian Army wants to buy the Spike missile as a “stop gap” measure before its defense research agency can develop an indigenous anti-tank missile within the next three years. After a long procurement process, India had terminated its plan to buy $500-million worth of Spike missiles in January 2018. The Spike missile family is designed around 2 key principles: low life cycle cost, and simple but reliable operation. Low life cycle cost comes from keeping prices down for all components by using “good enough” solutions that offer high quality without gold plating. The Spike infantry system consists of a missile in its cannister, a tripod, a Command Launch Unit that contains the optics and firing system, and a battery. It can go from “off” to firing in less than 30 seconds, as the operator lays the cross hairs on the aim point using either the 10x day sight, or the clip-on thermal imaging night sight. Considering the bumpy track-record of Indian defense acquisition, it can currently not be guaranteed that the current acquisition proposal will actually go through.
May 22/18: Australia The Israeli defense manufacturer Rafael Advanced Defense Systems is set to supply the Australian Army with its Spike LR2 anti-tank guided missile. The Spike infantry system consists of a missile in its cannister, a tripod, a Command Launch Unit that contains the optics and firing system, and a battery. It can go from “off” to firing in less than 30 seconds, as the operator lays the cross hairs on the aim point using either the 10x day sight, or the clip-on thermal imaging night sight. Spike LR 2 is an advanced multipurpose missile designed for the future battlefield, with full commonality to the Spike Missile legacy. The 5th generation Spike LR 2 design is based on lessons learned from modern warfare, combined with accumulated data from more than 5000 Spike Missiles fired in combat and training across its large user base. The Spike competed against the French produced Missile Moyenne Portée. The LR2 will be deployed on the Rheinmetall Boxer CRV, which was procured earlier this year in a $3.91 billion deal. The Spike LR2 can be easily integrated into the Royal Australian Army’s existing Elbit-sourced battle management system. The Spike LR is currently in service with the German, Latvian and Israeli armed forces.
January 19/18: Back on Track! In another twist in India’s anti-tank procurement saga, Israeli Prime Minister Benjamin Netanyahu said on Wednesday that he had been informed by New Delhi that it had decided to put a major anti-tank missile deal back on track. Netanyahu, who is currently on a five-day visit to India, called the revisiting of the Spike anti-tank missile deal as “very important,” adding that “there will be many more deals.” There was no immediate comment from Indian officials and no additional details of how the deal might be consummated were given, but Israel’s Channel 1 television said the original half-billion-dollar value would be cut in half. Developed by Israel’s state-owned defence contractor Rafael, the firm announced ahead of Nethanyahu’s trip that India had called off the deal, due to cost and India’s desire to develop its own systems.
January 4/18: Deal Cancelled Israeli missile specialist Rafael has got the jump on the Indian Defense Ministry, telling media Wednesday that New Dehli has cancelled a $500 million order for Spike anti-tank missiles. The firm said that it “regrets the decision and remains committed to cooperating with the Indian Ministry of Defence and to its strategy of continuing to work in India, an important market, as it has for more than two decades, to provide India with the most advanced and innovative systems.” While Indian officials had no immediate comment on the cancellation, it is believed that the ordering of such missiles would “adversely impact the program for indigenous development of the weapon system by DRDO [India’s Defense Research and Development Organization],” according to Indian media. News of the cancellation comes less than two weeks before a visit by Israeli Prime Minister Benjamin Netanyahu to India, and follows last summer’s visit by his Indian counterpart Narendra Modi to Israel last summer. Rafael’s CEO, who is to join Netanyahu on the trip (awkward), said the cancellation was made prior to the signing of the final contract and despite the firm’s compliance with all demands. However, a consolation thrown out by New Delhi on Tuesday—the same day the Spike deal was officially dumped—is the $70 million for 131 Barak anti-air missiles for its first aircraft carrier.
August 10/17: India’s Kalyani Group, in partnership with Israel’s Rafael, has opened the country’s first-ever private missile subsystems manufacturing facility. Located in Hyrdabad and trading under the name Kalyani Rafael Advanced Systems, the facility will undertake the production and assembly of Spike anti-tank guided missiles (ATGM) and its related technologies such as missile electronics, command, control and guidance, electro-optics, remote weapon systems, precision-guided munitions, and system engineering. In addition to establishing a robust supply chain in India to undertake spares and other parts requirements of missiles to be manufactured in the country, the joint venture will also look to export Spike ATGM family and SPICE precision-guided munitions to Southeast Asian counties. The company can also boast the status of being India’s largest-ever foreign direct investment joint venture firm.
March 27/17: India is moving ahead with a $1 billion procurement of Spike anti-tank missiles from Israel’s Rafael Advanced Defense Systems. The Spike will see New Delhi acquire 275 launchers and 5,500 Spike missiles in completed and kit form along with an undisclosed number of simulators, and also includes a technology transfer to India’s state-owned Bharat Dynamics Limited (BDL) to build another 1,500 systems and around 30,000 additional missiles. Meanwhile, Israel is considering selling armed Heron TP UAVs, including the technology transfers necessary to meet the “Make in India” requirement. A decision on the Heron deal will be made following Indian Prime Minister Modi’s visit to Israel this July.
August 18/15: The German Army is reportedly buying Spike-LR Anti-Tank Guided Missiles (ATGM) from Israel’s Rafael Defense Systems. The missile family has found export success with India, with the Bundeswehr planning to equip some Puma IFVs with the weapon. The German Defense Ministry has reportedly already purchased a number of the missiles, with the integration with Puma vehicles scheduled for completion by 2018.
Oct 24/14: Spike picked. India’s top-level Defence Acquisition Council clears INR 900 billion in acquisitions. New submarines are the biggest, but there’s also clearance for up to INR 32 billion to buy and license-build about 300 Spike family launcher systems and 8,000 missiles.
Other DAC clearances include INR 530 billion for 6 submarines; 2 SDV underwater commando delivery vehicles; INR 20 billion to have the state-owned Ordnance Factory Board build about 360 more BMP-2 tracked IFVs under license; and INR 18.5 billion for 12 more license-built Do-228NG short-range transport and maritime surveillance aircraft from HAL. Sources: NDTV, “6 Made-in-India Submarines for Navy for 53,000 Crores” | IANS, “Defence ministry clears Israeli anti-tank missile, six submarines”.
DAC Approval: Spike wins
Nov 11/13: DAC delays. Indian defense minister AK Antony and the Defence Acquisition Council give Javelin an opening in India, by delaying any decision on INR 150 billion project to equip India with 321 Spike family launchers and 8,356 of RAFAEL’s Spike-MR missiles.
Raytheon had received the Indian Army’s 2010 RFP, but only RAFAEL responded. Europe’s MBDA, Russia’s Rosoboronexport, Raytheon, and General Dynamics reportedly balked at India’s technology-transfer requirements, and did not bid. The Lockheed/ Raytheon Javelin needs the competition to be withdrawn and replaced by another RFP that it can enter, at which point India’s own state-run firms might choose to offer a version of their problem-plagued Nag missile. DAC’s non-decision leaves the entire situation very unclear.
Even if RAFAEL does win, Javelin is expected to remain a viable competitor for subsequent infantry buys. Sources: Times of India, “Antony defers decision on critical but controversial missile deals with Israel” | Defense News, “India Again Considers Buying Israeli-made ATGM” | Defense News, “India Pursues Indigenous ATGM Amid Javelin Talks” | Times of India, “Scam-wary Army calls off Israeli missile deal” (March 2013).
Nov 29/12: Competition. The Times of India reports that Israel’s Spike-MR missile may be about to elbow Javelin aside, because the Israelis are willing to transfer enough technology to allow production in India.
The Ministry eventually wants to equip all 356 of its infantry battalions with an estimated 2,000 launchers and 24,000 missiles, produced by state-owned Bharat Dynamics. The Army reportedly wants to complete the induction of these anti-tank guided missiles by the end of the 12th Plan (2017).
Sept 23/12: Javelin issues. India remains interested in the Lockheed/Raytheon Javelin. Their soldiers fired some in 2009 joint exercises with American troops, and Defence Minister AK Antony said in August 2010 that a Letter of Request would be sent. So, why has no DSCA request been approved? India’s PTI explains that conditions regarding the secrecy of certain components are holding up an agreement. This isn’t the first time transfer of technology and proprietary designs have had an impact on US-Indian sales, and it won’t be the last. Raytheon will say only that:
“The Javelin JV stands ready to respond to all requests of the Indian government relating to the evaluation and procurement of the combat-proven missile while ensuring it adheres to a US and Indian governments’ agreement.”
If Javelin continues to hit roadblocks, Israel’s RAFAEL awaits with its popular Spike family.
March 25/11: RFP exclusion. Spike MR was the only bidder in India’s international tender, in part of because of language requiring an “active-passive fire-and-forget guidance system,” which only Spike meets. Most other missiles are either active/ passive guidance that requires crosshairs on target (GBM-71 TOW, AT-14 Kornet, MBDA Milan-ER), or fire and forget (FGM-148 Javelin). Defense Update writes:
“The Indian Army plans to install the missiles on infantry combat vehicles currently carrying locally produced AT-5 or Milan missiles.
The Indian Ministry of Defense plans to order 321 launchers, and 8,356 missiles, plus 15 training simulators in a multi-phase arms package worth over one billion US$. Two options are currently on the table – the U.S. Javelin and the Israeli Spike MR.”
Reports are currently conflicting. Defense Update suggests that both programs are proceeding in parallel channels, and at some point either the RFP (Spike MR) or a government-to-government deal (Javelin) will win out. The challenge for RAFAEL is that India has rules discouraging awards to competitions that wind up with just 1 compliant vendor, so a waiver will be needed. For Javelin, the issue is technology transfer. Sources: Defense Update, “Spike or Javelin? India Still Undecided on a Billion Dollar Missile Buy”.
Additional ReadingsLa Haute Autorité de l'Audiovisuelle et de la Communication (HAAC) a encore frappé. Cette fois-ci c'est le quotidien ''La Nouvelle Tribune'' qui en a fait les frais. Pour gravissime qu'elle soit, cette nouvelle dindonnerie relève aujourd'hui au Bénin d'une banalité malheureuse et pathétique.
La marque par excellence de cette trivialité dans la décision de la HAAC, c'est la désormais légende bananière qui l'a suivi. Cette légende qui veut que ce soit le président de cette institution qui s'est enfermé dans son bureau et a unilatéralement émis cet oukase. Triste constat pour une mise à mort dont la presse elle-même est largement responsable et ce, dans un environnement sociopolitique qui n'a de cesse de se déliter depuis plus d'une décennie.
La presse béninoise a commis deux erreurs fondamentales. C'était au début de la présidence de Boni Yayi. La première a été de développer une curieuse notion en réponse aux velléités liberticides du régime du Changement. Dans leur volonté de museler la presse, Boni Yayi et ses chantres ont affirmé, à peine installés au pouvoir, qu'ils n'entendaient pas s'accommoder de cette liberté de ton de la presse caractéristique du régime Kérékou. Plutôt que de faire front à ce qui s'annonçait clairement comme la fin de l'âge d'or et d'opposer au nouveau chef de l'État son légendaire corporatisme, la presse béninoise a plié l'échine en développant la notion de ”brebis galeuse”. Et d'annoncer bravement qu'elle ”fera le ménage” en son sein.
Il faut dire que le régime Yayi a su s'y prendre pour obtenir avec une facilité déconcertante la reddition de la presse. Il a en effet usé de la stratégie de l'appât du gain au nom pudique de ”contrat”. Comme le définissaient à l'époque quelques responsables de la presse béninoise au travers d'explications confuses, il s'agissait d'une rémunération mensuelle des organes de presse écrite et audiovisuelle en échange, usons d'un euphémisme, d'une mise en exergue des politiques et réalisations du gouvernement. Ce qui était maladroitement présenté comme un contrat dont l'objet portait sur la communication exprimée au travers des publi-reportages, n'était en réalité qu'une redéfinition de la ligne éditoriale des médias partenaires. Ceux-ci étaient dorénavant invités à être des caisses de résonance du gouvernement.
Des contrats d'aliénation
Peu importe de savoir si c'est la consistance du magot qui valait pour la presse, dans mon pays, d'échanger sa liberté et son indépendance. L'essentiel à retenir ici c'est que cette manne tombait à pic pour une presse en mal de modèle économique pour son existence voire sa survie. Dès lors, point n'était besoin pour le glas de sonner ; la presse, chez nous, s'était chargée de faire disparaître les cloches. A peu de frais, Boni Yayi mettait en branle l'euthanasie de cette dernière qui n'a de cesse de se poursuivre avec de moins en moins l'argent comme consolateur. Il faut en effet dire que le président Patrice Talon, contrairement à l'homme d'affaires qu'il était, ne s'illustre pas par sa prodigalité. Les médias, semble-t-il, ne reçoivent de lui que ce qu'il faut pour ne pas mourir.
C'est désormais une presse affamée, muselée et clochardisée qui fait face impuissante au glaive de l'arbitraire et de l'oppression. Qu'il semble désormais loin cette époque où les journalistes battaient le macadam pour protester contre de simples menaces verbales proférées par un haut responsable de la police à l'encontre d'un journaliste ! Le soutien de la corporation à la ”brebis galeuse” qu'est ”La Nouvelle Tribune” s'est traduit par une audience des responsables des associations de la presse au bourreau. On ne les accusera donc pas d'avoir croisé les bras. Et ce n'est pas le contexte général dans lequel s'inscrit cette répression qui l'aidera à sortir de l'ornière.
C'est en effet peu dire que d'affirmer que les principes et valeurs consacrées à la Conférence nationale se sont considérablement érodés. La volonté nationale de bâtir un État de droit et une nation prospère ont depuis longtemps cédé la place à l'affairisme et à un opportunisme de mauvais aloi. Plus aucun tenant d'une quelconque charge publique ne veut assumer ses responsabilités. Les acteurs du parlement, de la justice et de toutes les autres institutions publiques s'emploient à être des supplétifs du pouvoir public. La démission est collective. Et ce n'est pas les conseillers de la Haac qui diront le contraire, eux qui se complaisent à être infantilisés afin de ne pas assumer leur silence complice.
Une presse affamée, muselée et clochardisée
Ce que devient chaque jour notre Bénin n'est pas sans rappeler cette société que décrit l'écrivait Mongo Béti, celle où quand « le peuple [est] tenu à l'écart des lumières du droit, le vice devient la norme, le tortueux la règle, l'arbitraire la vertu. »
Comment donc dans un environnement aussi décadent, ce « fou » de Vincent Foly peut-il espérer être l'exception ? Comment veut-il, lui le téméraire, s'entêter à vouloir tenir haut la flamme de la déontologie du journalisme au milieu de la tempête de la vénalité et de la couardise ? Pourquoi ne veut-il pas rentrer dans les rangs plutôt que de vouloir jouer au héraut de l'objectivité des faits ?
Voilà autant de questions qui soulignent la profondeur de la tragédie que nous vivons actuellement au Bénin et que symbolise avec éclat la décision de la Haac. Il serait intéressant de connaître le dénouement de cette affaire. Car l'objectif non affiché ici est d'obtenir la soumission du récalcitrant Vincent Foly. Le seul recours que pouvait être la justice à malheureusement servi un précédent dissuasif pour les victimes de la Haac. Il ne faut en effet pas oublier que la chambre administrative de la Cour suprême a mis cinq ans pour rendre une décision provisoire au sujet de la suspension du quotidien ”Le Béninois Libéré” et de la radiation du métier de journaliste des sieurs Aboubakar Takou et Eric Tchiakpè. La décision au fond se fait encore attendre.
Alors quelle solution ? Que chaque acteur se réapproprie le rôle et la fonction qui sont les siens dans la société et les exerce sans faux-semblants. L'intelligence collective doit prévaloir. C'est à ce prix qu'on pourra espérer remonter à la surface après avoir touché le fond.
N.B. Le surtitre et les intertitres sont de la rédaction
Richard Boni Ouorou (Contribution)
Politologue
Montréal-Canada
Juhern Kim, acting representative of the Global Green Growth Institute (GGGI) in Colombia, gives a presentation on the intergovernmental organisation’s strategies. Credit: GGGI Colombia
By Constanza Vieira
BOGOTA, Jun 6 2018 (IPS)
Colombia is a global power in biodiversity and water resources, but at the same time it depends on exports of fossil fuels, coal and oil, to the world. But don’t panic: in the green economy there are also incomes and jobs – says a world expert on the subject, Juhern Kim.
“If Colombia makes intelligent use of its abundant natural resources, its natural capital, it can create new business opportunities linked to bio-economics, sustainable agriculture and forestry, which have the potential to generate income and create green jobs,” Kim, an environmental economist and ecosystem management specialist, told IPS in an interview.
Kim is acting representative in Colombia of the Global Green Growth Institute (GGGI), an intergovernmental organisation created in 2012, which promotes sustainable development that is both economically viable and socially inclusive. It works directly in 26 countries, including Colombia.
In June last year, Colombia ratified the Paris Agreement on Climate Change, by which it pledged to reduce greenhouse gas emissions by 20 percent by 2030, to help fight global warming.
Among other issues, Kim analysed in his interview with IPS how this South American country is moving towards climate change mitigation and adaptation and a low-carbon economy, as committed to in the climate agreement signed in December 2015 in the French capital, at the 21st Session of the Conference of the Parties (COP 21) to the United Nations Framework Convention on Climate Change.
The expert, who previously represented the GGGI in Vietnam and worked on issues related to the green economy at the UN Environment, also analysed how Colombia can make its energy mix and its economy greener in general.
IPS: Colombia is the world’s fifth largest producer of coal. How does the GGGI suggest bringing about an end to mining, an activity that runs counter to the climate accords?
JUHERN KIM: Coal production plays an important role in the Colombian economy: it contributes around 1.5 percent of GDP and 18 percent of total exports. Since about 95 percent of the coal produced in Colombia is exported, national coal production is affected by international market trends.
The recent volatile price fluctuation for commodities, and the associated impact on the Colombian economy, clearly shows that the country’s economy needs to be diversified in order to grow more and better.
Furthermore, future global demand for coal will tend to fall, although it will happen progressively and not for all types of coal.
Many countries have started to shut down their coal plants, and have been working on reducing the consumption of other fossil fuels, reinforced by international commitments such as the Paris Agreement, where Colombia made its own commitment as well.
GGGI promotes a sustainable and inclusive economic growth path, which implies the reduction of coal and other fossil fuel use, due to the negative environmental impacts.
That’s why GGGI has been supporting the government of Colombia for the last year and a half through the National Planning Department (DNP) to formulate a long-term green growth policy, that proposes actions related to the economic activity of coal in three ways:
1. Incorporation of renewable energy in the energy mix. GGGI advocates for countries to achieve energy transitions towards cleaner technologies. In Colombia, the production of electricity from coal amounts to 8 percent of the total.
2. Exploring new economic growth drivers to diversify the economy currently depending on the mining-energy sector (oil and coal exports). For instance, Colombia has abundant resources associated with natural capital, such as biodiversity – if Colombia utilizes these resources wisely, they can create new business opportunities related to bio-economy, sustainable agriculture, forest economy, which have the potential to generate income and create jobs (green jobs).
3. Curbing the environmental impacts of coal mining, especially by informal miners. Coal mining has informality rates close to 40 percent, while many productive units do not have an environmental license and have exploitation techniques that are harmful to the environment. It is intended to strengthen the mining formalization and provide technical assistance to reduce pollution.
IPS: How can the coastal population be protected from the intensification of tropical storms and the advance of coastal erosion?
JK: Colombia is being highly threatened by tropical storms and coastal erosion in two coastal areas that represent nearly 1,700 km in the Caribbean and 1,300 km in the Pacific.
Colombia has coasts on two oceans, and the frequency and intensity of such extreme events has been increasing, which, added to the deficient planning of urban development, increases the vulnerability and risk of people, infrastructure, and ecosystems.
The National Adaptation Plan recognises the country’s vulnerability to this type of events.
The country is now moving in the right direction led by the Ministry of Environment and Sustainable Development (MADS) by including climate change variables within the planning and zoning of the territories, which will be articulated with adequate financing and technology transfer to implement mitigation measures for this type of risks.
Of particular importance is the ecosystems-based adaptation measure.
In this case, protecting and increasing the mangroves on the coastal lines will reduce coastal erosion, and at the same time allow the sustainable use of this type of ecosystem for the benefit of local people’s livelihood.
In other cases, it will be necessary to implement traditional infrastructure measures that avoid short-term calamities. Increasing local capacities, public awareness, adequate planning and the implementation of risk mitigation measures are key to achieving this objective.
IPS: A key question is the energy transition. How can clean energy be promoted in Colombia? Is community self-management better, or are large regional concessions, criticised as monopolies, preferable?
JK: Colombia has a high proportion of clean energy from hydroelectric generation (70 percent). However, this energy depends on the hydrological cycle which makes it vulnerable to the effects of climate change.
In that sense, it will be beneficial for Colombia to diversify its energy mix with other sources of clean energy, with some policy changes and regulations in the wholesale energy market.
Colombia currently lags behind in terms of the production of non-conventional renewable energy resources, compared to neighboring Latin American countries like Chile. However, Colombia has a strong potential for generation of solar, wind and biomass energy, and those can also serve as alternative off-grid solutions.
We believe that renewable energy projects should be carried out by entities that have the right technical and financial strengths required to develop, operate and maintain this type of projects.
IPS: What does the GGGI think of fracking?
JK: Fracking, like any other exploitation technique, has associated risks in its implementation and management, as it is known for generating many environmental impacts, such as potential contamination of ground and surface aquifers, methane emissions, air pollution, etc. In addition, it also has a potential for increasing oil spills, which can harm soil and surrounding vegetation.
In general, as an institute dedicated to green growth, we promote the development of alternative renewable energy sources to reduce dependence on fossil fuels. As mentioned above, it would be expected that the government make some efforts to diversify their economy to generate new sources of economic development while taking care of the environment and social impact.
IPS: According to environmental analysts, when the FARC (Revolutionary Armed Forces of Colombia) withdrew from the territories it controlled, it became evident that the guerrillas had played a role as forest rangers in those areas, because thousands of hectares have been razed since then. What is your take on the situation and what do you think can be done?
JK: Although the presence of guerrillas in many forested zones of the country prevented the entry of agricultural expansion and exploration for natural resources in some sense, it is probably not that simple to say that they played a role as forest rangers, because they also supported the production of illicit crops that generated deforestation.
In brief, understanding the reasons for the increase in deforestation in the country is not simple math at all. And finding solutions is not simple as well.
It seems that the post-conflict process has been generating a change in the territorial dynamics, in some cases through an absence of control arguably provided by guerrillas in the past, in other cases through a high-level of speculation associated with unproductive land use, with false hope embedded for some people wanting to be awarded land titles if they put any type of activities in the land, and sell their land at a better price in the future.
The playing field must be levelled. The abovementioned situation prevents rural producers and entrepreneurs from accessing land with adequate support for productive activities and conservation incentives, such as credits (i.e. financial instruments), access to markets, financial incentives for conservation (e.g. payment for ecosystem services), and so on.
In fact, the whole landscape should be properly planned in an integrated way – i.e. sustainable landscapes approach, which promotes economic gains but minimising environmental impact and increasing social returns.
For instance, productive zones for local economic development should be set up, but it is not wise to set them in the biological corridor. Also, financial instruments designed to promote sustainable agriculture methods, such as agroforesty, can be a driver for making a sustainable transition.
Also, Colombia has defined an Integrated Strategy for the Control of Deforestation and Forest Management, which sets clear guidelines on how to address this issue. However, having this strategy is not enough if there is no tight alliance among Colombian society as a whole.
In addition, the public authorities have an important role to play to implement the vision for conservation of forests (i.e. command and control) – e.g. functions of the prosecutor offices, judges and many other actors, committed to reduce illegality.
The post Q&A: Greening Colombia’s Energy Mix appeared first on Inter Press Service.
Excerpt:
Constanza Vieira interviews JUHERN KIM, GGGI acting representative in Colombia
The post Q&A: Greening Colombia’s Energy Mix appeared first on Inter Press Service.
San Francisco – Trotz zunehmender Kritik an Tesla-Chef Elon Musk haben die Aktionäre des Elektroautobauers dem Boss den Rücken gestärkt. Sie stimmten am Dienstag bei der jährlichen Versammlung dagegen, die Macht des schillernden Tech-Milliardärs im Unternehmen einzuschränken.
Die Investoren lehnten den Vorschlag an der Hauptversammlung im kalifornischen Mountain View ab, Musk die gleichzeitige Führung des Verwaltungsrats und des Vorstands zu verbieten. Auch blieb eine Initiative erfolglos, mit der die Wiederwahl von drei seiner Vertrauten - darunter Musks Bruder Kimbal - als Verwaltungsräte verhindert werden sollte. Am Markt kam das gut an, die Aktie drehte nachbörslich leicht ins Plus.
Musk, der von seinen Anhängern angehimmelt und von Kritikern als Hochstapler bezeichnet wird, hatte in den vergangenen Monaten mit etlichen negativen Schlagzeilen zu kämpfen. Unfälle mit dem Fahrassistenzprogramm «Autopilot» sorgten wiederholt für Aufsehen, Probleme bereitet aber vor allem der stockende Start der Serienfertigung des Hoffnungsträgers Model 3.
Mit den Analysten gründlich verscherztMusk wirkte zuletzt zunehmend gereizt. Mit den Analysten hat es sich der Firmenchef gründlich verscherzt, als er sich vor einigen Wochen in einer Telefonkonferenz über «langweilige Deppenfragen» beklagte. Bei Twitter wetterte er kürzlich gegen die «grossen Medien» und angeblich unfaire Berichte. Am Finanzmarkt, wo es lange nur bergauf ging, sieht es nicht mehr so gut aus - die Tesla-Aktie ist im Jahresvergleich um 17 Prozent gesunken.
Musk zeigte sich zuversichtlich, die Fertigungsziele beim Hoffungsträger Model 3 zur Jahresmitte zu erreichen. Von dessen Erfolg hängen die langfristigen Gewinnaussichten des Unternehmens ab. «Das waren die schrecklichsten paar Monate, die ich je erlebt habe, aber ich glaube, wir kommen hin», sagte Musk den Aktionären.
Musk gesteht Fehler einGegenüber den Investoren räumte er Schwierigkeiten ein: «Wir haben viele Fehler bei der Model-3-Produktion gemacht.» Er halte es jedoch für wahrscheinlich, dass Tesla bis Juni sein bereits mehrfach verschobenes Ziel erreicht, pro Woche 5000 Stück seines ersten günstigeren Autos zu fertigen. Das hatte sich Tesla eigentlich schon für Ende 2017 vorgenommen. Aktuell liegt die wöchentliche Produktionsrate laut Musk bei rund 3500 Autos.
Der Konzern könnte nach Ansicht von Analysten Kapitalbedarf haben. Musk selbst hat eine Kapitalerhöhung für dieses Jahr ausgeschlossen. (sda)