Vous êtes ici

Defense Industry Daily

S'abonner à flux Defense Industry Daily
Military Purchasing News for Defense Procurement Managers and Contractors
Mis à jour : il y a 1 semaine 3 jours

Russia’s Ka-52 Alligator Scout-Attack Helicopters

mer, 07/09/2016 - 01:49
Alligator, feet wet
(click to view full)

When Russia committed to a multi-year buy of Mi-28 attack helicopters in 2006, it appeared that the Mil design bureau’s Mi-28 (NATO code: Havoc) had eclipsed Kamov’s more radical Ka-50 (NATO code: Hokum) as Russia’s future attack helicopter. A critical loss in Turkey’s attack helicopter competition, and conflicting promises concerning the Kamov machine’s future in Russia, left the platform’s very future in doubt. Russia’s 2005 defense budget, for instance, was supposed to include 12 Ka-50 helicopters – until that funding was cut.

Fortunately for the VVS, growing Russian natural resource revenues, and the accompanying growth in Russian defense budgets, are creating new options. So, too, is a major investment in modernizing its manufacturers, which has put the Ka-52 into production.

The Ka-52 Alligator Ka-50 “Black Shark”
(click to view larger)

By 2009, just a handful of coaxial, single-seat Ka-50’s had been delivered to the Army Aviation Training and Conversion Unit at Torzhok. Some even saw action in Chechnya, where their high cruising speed (300 km/h), protection, and ability to carry either armaments or fuel tanks gained them respect as scout/ attack/ command helicopters.

Many countries would consider that an odd combination, but it works quite well with Russian doctrines that emphasize durable combat punch for scouts, and central on-site direction of all combat aviation.

The Ka-52 “Alligator” is a 2-seat version of the Ka-50, using a side by side layout common to transport helicopters instead of the front-and-rear layout common in attack helicopters. This changes the helicopter’s aerodynamics somewhat, reducing maximum speed from 310 km/h to 300 km/h (192 – 186 mph), and increasing fuel consumption slightly. On the other hand, this change is expected to make it easier for the helicopter crew to perform battlefield observation and coordination roles. The extra crewman in the Ka-52 forced some reductions in fuel, armoring, and gun ammunition; it carries 240 rounds for its fuselage-mounted 2A42 30mm cannon, instead of 470 in the Ka-50.

Even so, the Alligator’s main rival isn’t the Ka-50, it’s the more conventional Mi-28N attack helicopter that Russia is also buying. Based on published materials, photos, and several Russian sources, we’ve compiled a side-by-side comparison that also includes Boeing’s current AH-64D Apache Longbow as a reference point, and normalizes measurements to the same units:

Ka-52K
(click to view full)

Note that the Ka-52’s operational sensor fit is somewhat unclear, and a range of options have been tried that are not always present in photos. A nose turret can hold a laser range-finder and infrared sights, a small ball under the fuselage can hold optical sights, a FLIR system can supposedly be integrated with Zenit’s Shkval electro-optical sighting system in a ball mounted on top of the fuselage aft of the canopy, and mast-mounted sights have been reported. What is certain is that an effective modern scout helicopter requires a combination of zoom and infrared/FLIR cameras, and lasers capable of rangefinding or target designation. The most advanced helicopters add millimeter-wave radars, creating additional options in uncooperative weather, improving their awareness of what’s going on in the airspace around them, and providing targeting options for some missiles. A 2013 deal with French optronics leader Sagem (q.v. Aug 28/13 entry, below) may begin to add more clarity on this front.

The Ka-52K is a naval variant that will operate from Russia’s Vladivostok Class amphibious/air assault LHD ships. It adds folding rotors and folding stub wings, but not the folding tail found in some naval helicopters. A maritime radar in the nose has been mentioned, possibly a “mirror” radar that combines 2 bands for surface scanning and long-range search. So has the ability to carry Kh-35 medium-range anti-ship missiles, or even supersonic Kh-31s. Improved corrosion resistance is also a standard feature for naval helicopter variants, and the question is how far the Russians will go.

A Turkish-specific, NATO-compatible variant of the Ka-52 called the Erdogan was developed in cooperation with Israel’s IAI to compete in Turkey’s attack helicopter competition, but lost to Italy’s AW129T Mongoose.

Contracts and Key Events 2015 – 2016

Export Contract Paris Air Show

September 7/16: Russia’s Izvestia reported that during a recent meeting between Egyptian and Russian defense ministers, both sides agreed to proceed with the training of Egyptian pilots on flying the Ka-52K naval attack helicopter. It’s believed that Egypt will now go back and formulate what training requirements are needed for the pilots. The attack helicopters will go toward operations tackling jihadists in the Sinai desert.

August 10/16: Navalized versions of the Ka-52K are to be installed with a compact active electronically scanned array (AESA) radar. The radar operates in dual-band millimetric and centimetric wavelengths which allows the Ka-52K to detect large naval targets up to a range of 180 km. Initially developed for French-built Mistral-class vessels, the sale was cancelled by France after Russia’s annexation of Crimea. The helicopters already built are likely to be added to the air wing of the Project 11435 Admiral Kuznetsov aircraft carrier.

July 20/16: Russia’s latest KA-52K Katran helicopters are to be tested in the field during upcoming military action in Syria. The helicopters will be on board the aircraft carrier Admiral Kuznetsov and will join the Syrian campaign from October 2016 to January 2017. Reasoning behind the deployment, according to Viktor Murakhovsky of Arsenal Otechestva magazine, is that it “is a test of the operational and technical capacity and ability of our air carrier strike group, since previously Russia has never used air carriers in real combat conditions.”

January 4/16: A deal has been reached which will see Egypt acquire forty-six of a navalized variant of the Ka-52 Alligator helicopter. The Ka-52K was developed to operate on the French manufactured Mistral class helicopter carrier that had been initially ordered for the Russian Navy. The $1.28 billion order went south amid sanctions placed on Russia over Ukraine in 2014. Egypt became the alternative purchaser of the warships after signing contracts in October so the acquisition of the helicopters originally developed for it is not surprising.

December 29/15: Egypt is to receive the President-S missile Approach warning system according to an official from the Russian Radioelectronic Technologies Group (KRET). Contracts for the purchase are currently being drafted with delivery of the system due to commence in the near future. The President-S system will provide protection to both military and civilian aircraft and helicopters from airborne missile threats, as well as those launched from ground and sea based defense systems. It can destroy and suppress the optical homing warheads of air and anti-aircraft missiles, including the homing warheads of man-portable air defense missile systems. The purchase of the system coincides with the procurement 50 Ka-52 reconnaissance and attack helicopters, with deliveries to be carried out between 2016-2018.

September 25/15: Egypt has signed an agreement for fifty Russian attack helicopters, seemingly confirming reports from August which indicated that the country would receive around fifty helicopters by 2019. The Egyptians are thought to be buying the navalized Ka-52K version of the Alligator scout/attack helicopter, most likely those intended to equip the Russian Mistral LHDs now also destined for Egypt following a contract earlier this week.

September 1/15: The Ka-52 helicopter export contract mentioned back in June at the Paris Air Show appears to involve Egypt’s acquisition of 50 of the attack helicopters.

2013 – 2014

Production and delivery; French optronics coming. Ka-52 “Alligator”
(click to view full)

Aug 5/14: +32. IHS Jane’s reports that Russia has ordered its 32 Ka-52K helicopters for use with its Vladivostok Class LHDs. The order isn’t a surprise (q.v. Oct 9/13, June 24/14), it was just a question of when the contract would be placed:

“Speaking to IHS Jane’s, a Russian defence industry source stated that the order included 32 Ka-52K helicopters. These will be built by Progress Aresenyev Aviation Company ‘Nikolai Sazykin’, a subsidiary of Russian Helicopters.”

Sources: IHS Jane’s Defence Weekly, “Russia orders Ka-52K helicopters for Mistral-class LHDs”.

32 Ka-52Ks

Aug 4-5/14: Rostec subsidiary Russian Helicopters showcases its new military helicopter models at the Defence Ministry’s Innovation Day exhibition in the suburbs of Moscow. Displayed helicopters include the Ka-52K naval scout/attack helicopter, Mi-8AMTSh-VA armed transport helicopter optimized for polar regions, the upgraded Mi-26T2 super heavy-lift helicopter, and the Mi-38 successor to existing Mi-8/Mi-17 models. Sources: Russian Helicopters JSC, “Russian Helicopters presents new military helicopters at the Defence Ministry’s Innovation Day exhibition”.

June 24/14: During an inspection tour at Progress aircraft manufacturing company in Arsenyevsk, Russian Deputy Defense Minister Yury Borisov offers a production update:

“The plant is in a stable position and has a long-term contract on the delivery of 146 Ka-52 Alligator helicopters for the period up to 2020. Further plans include [the sale of] 32 ship-based helicopters…. Navy is expecting Ka-52 helicopters, which will be placed on board the Mistral-type ships currently under construction…. We paid great attention to import replacement issues, including as far as components received from Ukraine as concerned. These issues are not critical. They can be resolved quite painlessly.”

That last bit is especially important after Russia cut off its Ukranian supply chain by invading and annexing Crimea, then militarily supporting guerrilla movements that are trying to annex Eastern Ukraine as well. Sources: Voice of Russia, “Russian Defense Ministry plans to buy 32 Ka-52K helicopters for Mistral ships.

Dec 25/13: 2013 production. During a visit to Russian Helicopters’ Progress Arsenyev Aviation Company production plant, Lt. Gen. Victor Bondarev thanks them for producing 14 Ka-52s on schedule in 2013, as part of overall Russian deliveries of over 100 helicopters. Sources: Interfax/AVN, “Russian Air Force took delivery of over 100 new rotorcraft in 2013”.

Oct 9/13: Ka-52K. RIA Novosti quotes “a Deputy Defense Minister” as saying that Russia plans to order 32 Ka-52Ks, conditional on successful final helicopter testing in 2014.

That could become a tight schedule, since the Russian Navy is expected to take delivery of its 1st LHD in November 2015, and the Ka-52 will need some flying and testing time before it’s ready for service. Even if Russian Helicopters’ Progress Arsenyev division delivers 6 helicopters just a year after the order, the Vladivostok wouldn’t have anything like an operational Ka-52K wing for many months after delivery at least. It would appear that the new ship design and its key helicopters will be conducting their break-in period together, which has a way of making everything more difficult. Sources: RIA Novosti, “Russian Defense Ministry to Order 32 Shipborne Helicopters in 2014 – Official”.

Aug 28/13: Partnership. At MAKS 2013, Kamov and France’s Sagem Defense announce a partnership to add Sagem’s optronics and [the Franco-Russian] LINS 100 inertial navigation systems to the Ka-52, “which will address a requirement expressed by several countries… [the partners] plan to start integration of a new optronic system in early 2014.” The release specifically mentions leveraging Sagem’s experience as the supplier of the roof-mounted Strix surveillance and targeting turret on Airbus Helicopter’s EC655 Tiger HAP/ARH/HAD scout and attack helicopters.

So much for the direct information. What this release says indirectly, is that the Ka-52’s surveillance and targeting systems have been a hindrance to international sales, and need improvement. Otherwise, the outstanding requirement(s) would be addressed already. Sources: Sagem re: Strix | Sagem DS Aug 28/13 release.

Feb 22/13: RIA Novosti reports that the Southern Military District has received its 1st batch of Ka-52s, and is scheduled to start operations in March. RIA.ru [in Russian].

2011 – 2012

Full-rate production contract; Navalized Ka-52K confirmed; Crash. Ka-52 “Alligator”
(click to view full)

Aug 9/12: Ka-52K changes. Oboronprom confirms that Russia will build the navalized Ka-52K Alligator helicopter for its new Vladivostok Class amphibious ships, which also prompts speculation about the design changes involved. Past displays have shown folding rotor blades, folding wings, and the standard anti-corrosion treatments.

Navy Recognition says that the Ka-52K will also include a modified version of the MiG-35 fighter’s Zhuk-A AESA radar in the nose section, and will be able to carry Kh-31 Krypton or Kh-35 Kayak anti-ship missiles. Those missiles weigh in at over 600 kg/ 1,300 pounds each, however, which could make them challenging weapons for the helicopter to carry. It’s within the limits, but testing will tell. The level of Russian interest of these missiles was regarded as unconfirmed by the people we talked to.

Subsequent research indicates that the AESA radar was a contractor offer from Phazotron, not a military requirement. It would be useful, but it would also be expensive. The importance of Russia’s Vladivostok Class ships may justify that, but word is that Phazotron has a cheaper back-up upgrade offer: a more conventional dual-band phased array radar, with frequencies optimized for closer ground scans and long-range surface (naval) scans. Sources: Navy Recognition, “Special version of Ka-52K Helicopter with advanced radar and antiship missiles for Russian Mistral” | Voice of Russia, Russia to build helicopters for Mistral carriers” | DID interviews and discussions.

June 2012: Take-off magazine covers the Ka-52, and offers some production and deployment information:

“In May 2011, the delivery started to Chernigovka air base in the Russian Far East, where the Russian Air Force had activated its first full-ledged 12-ship Ka-52 air squadron by the end of the year. In 2012, Chernigovka air base took delivery at least five more Ka-52s. In addition, five new Ka-52s built by Progress by late 2011 were fielded with CTCC in Torzhok early in 2012.

Overall, over 20 production-standard Ka-52s were manufactured in the town of Arsenyev during 2012. 16 of them were fielded earlier this year with a second RusAF airbase, the one in Korenovsk, Krasnodar Territory. Their final assembly and check flights prior to the delivery to the air base had been handled by Rostvertol JSC, to which premises they had been brought in semi-assembled from Aresenyev-based manufacturing plant by RusAF airlifters.”

March 14/12: A Lenta report implies that the September 2011 contract reports may have referred to a multi-year contract aimed specifically at Ka-52 helicopters. From the Rus Navy translation:

“In 2011, Russian defense ministry tied a number of long-term aircraft procurement contracts; under one of them, the ministry purchased 140 attack helicopters Ka-52 Alligator, director of Oboronprom corporation Andrei Reus told Kommersant. Reus did not specify details of the contract only saying that “conditions were acceptable”.”

March 13/12: A Ka-52 crash, during a training exercise in the Tver region NW of Moscow, kills both pilots. It seems that the type’s unique ejection seats either didn’t save them, or weren’t triggered. While this is the 1st Ka-52 crash, there had been 2 crashes of the related Ka-50. Pravda | RTT News.

Crash

Sept 7/11: RIA Novosti offers a video tour of the Ka-52 factory, and says:

“In the next ten years, Russia’s Air Force will adopt 140 Ka-52 helicopters, a model better known as the Alligator. Dmitry Petrov, general director of the holding company Russian Helicopters, commented on a major contract that the aircraft manufacturer signed with the Ministry of Defense. Petrov spoke during a guided tour of Progress, the helicopter factory at Arsenyev, Primorye Territory, where the Alligators are assembled.”

While the report implies that the recent contract is entirely focused on Ka-52s, it should be taken with some caution. Russian Helicopters produces a wide variety of types. It is possible that the attribution could be a reporter error, or even a translation issue.

Sept 3/11: While discussing a $4+ billion Russian contract with state-controlled Oboronprom for 140 military helicopters by 2020 (no type breakdown), General Director Andrey Reus confirms that the 1st navalized Ka-52K Alligator attack/scout helicopter shipment for use on Russia’s new Mistral LHDs will finish by the end of 2012. RIA Novosti | Voice of Russia.

Ka-52 contract?

Feb 9/11: Itar-Tass reports that Russia will use 2 of the pending Mistral amphibious landing ships in the Pacific Fleet, including protecting the South Kurile Islands, which are disputed territory with Japan. As for the ships’ complement and design, Helicopters of Russia Holding Company Deputy Director-General Andrei Shibitov says that:

“Ship versions of the Ka-27K, Ka-29K and Ka-52K helicopters will be used. Their number on each ship will be determined by the Defence Ministry.”

Another Russian official states that using those coaxial rotor helicopters will require a slight elevation of the ship’s deck, to ensure enough clearance height in the hangars.

Jan 2/11: Buy in. Russian Defense Ministry official spokesman Col. Vladimir Drik says that they plan to start buying Ka-52 Alligator helicopters for the VVS (Air Force) in 2011. RIA Novosti.

2008 – 2010

Ka-52
(click to view full)

Dec 7/09: Industrial. Russian Helicopters JSC, which includes the Kamov, Mil, and Kazan design bureaus, announces a combined public and private investment of RUB 6 billion (about $200 million) to modernize manufacturing at the Arsenyev Aviation Company Progress plant, which makes the Ka-52. The “full scale technical overhaul” will take place from 2009-2015, and will improve production of the Ka-50 Black Shark and Ka-52 Alligator scout/attack helicopters, the new Ka-60/62 medium helicopter, and the new Mi-34C2 Peregrine light helicopter.

The first stage will overhaul foundry operations at Progress, beginning with a foundry production competence centre that is expected to open in early 2010. It will be followed by reconstruction and re-equipment of the composite and mechanical engineering sections with advanced control machinery that will reduce required space and personnel, an energy efficiency program, a “machine-working competence centre,” and the “introduction of modern digital and information technologies”. When discussing Phase 2 benefits, the firm points to the September 2008 introduction of the TruLaser 3530 laser cutting machine, which led to a saving of RUB 14.7 million (around $500,000) over 12 months with an 8-fold drop in labor intensity. The total economic impact of introducing new production machinery is expected to be as high as RUB 160 million ($5.3 million) initially, alongside RUB 40 million ($1.3 million) from installing cold solidifying mixture lines and low-pressure casting machines.

More investments may follow. These investments are being made pursuant to a wider Russian federal program titled “The development of the defense industrial complex of the Russian Federation in the years 2011-2020,” and Russian Helicopters COO Andrei Shibitov says that up to 70% of the Russian helicopter industry’s equipment is worn out.

Nov 27/09: During the FS Mistral’s visit to St. Petersburg, Russia, the amphibious assault ship holds a “cross deck” exercise with Russian Navy helicopters. They include landings by a Ka-29 utility helicopter with a French officer on board, as well as landings using a Ka-27 Helix anti submarine warfare helicopter and the first deck landing for the Ka-52 scout/attack helicopter, which also simulates a refueling on the flight deck. French Navy [in French] | DID: “Russia to Order French Mistral LHDs?.”

FS Mistral landings

Dec 26/08: RIA Novosti reports that the Russian government has approved the production of Ka-52 Alligator attack helicopters. They will be built at the Arsenyevsk plant, in the country’s Far East. Deliveries of the first 12 Ka-52s to the Russian Air Force will reportedly begin in 2009.

Approved

Nov 9/08: Various media reports now quote Russian Air Force chief Colonel-General Alexander Zelin, who says they will place a 2009 order for 12 Ka-52 “Alligator” helicopters, subject to successful completion of mandated testing. Col.-Gen. Zelin stresses that this is not a substitute for the Mi-28s, which are expected to begin arriving in 2009.

Meanwhile, Kamov indicates that they have been given the go-ahead for “full production,” and hope to complete 30 helicopters for Russia by 2012 while pursuing export orders. Avio News | Frontier India | RIA Novosti

Nov 10/08: Moscow News’ “Russian choppers on top” reports that the industry is being restructured, much as Russia has centralized the fixed-wing aircraft industry into the state-owned United Aircraft Corp.:

“But the industry has its specifics, Mikhail Kazachkov from the Helicopter Industry Association told RIA Novosti in an interview. Its bane is the lengthy production time: an idea to finished product takes, on average, 12 years. The authorities have decided to restructure the helicopter industry, to optimize its cash flows and make it more competitive. For that purpose they brought its separate branches under one umbrella, called Helicopters of Russia.”

Additional Readings The Ka-52

Related Items

Catégories: Defence`s Feeds

USAF RFI for Bell UH-1N Replacement in Works | Israel’s Space Comm Looks for Free Flight or $50M from SpaceX | Philippines Requests 14% Defense Budget Increase

mar, 06/09/2016 - 01:58
Americas

  • Two former executives of Brazil’s Forjas Taurus SA have been charged with selling weapons to a well known arms trafficker to Yemen. The indictment charges that the executives oversaw the shipping of 8,000 handguns in 2013 to Fares Mohammed Hassan Mana’a, an arms smuggler active around the Horn of Africa, which were first sent to Djibouti and then redirected to Yemen. Yemen has been in the grips of a civil war between Houthi rebels and a Saudi-led coalition supporting Yemeni president, Abd Rabbuh Mansur Hadi.

  • The USAF are to reset their Bell Helicopter UH-1N replacement program with a new request for information and a draft system requirements document to be issued on September 9. Under the long-awaited program, the new acquisition will replace the 62 Vietnam-era UH-1N Huey helicopters that support the service’s nuclear intercontinental ballistic missile bases in Wyoming, Montana and North Dakota. The service had previously wanted to sole-source 41 UH-60Ms to replace the 62 UH-1Ns, but they have now elected to open the competition to other manufacturers.

  • Israel’s Space Communication Ltd may seek either $50 million or a free flight from SpaceX, following the destruction of a Spacecom communications satellite last week by an explosion at SpaceX’s Florida launch site. The failed launch has had a profound impact on Spacecom with its equity expected to decline by $30 million to $123 million following a 9% dip in its share price on Thursday, followed by a further 34% drop when trading resumed. SpaceX said on Friday that it would shift flights to a second launch site in Florida, which is nearing completion and which was last used to launch NASA’s space shuttles.

Middle East & North Africa

  • Qatar has signed a deal with MBDA for the purchase of a coastal missile system that uses two types of missiles. The system will deploy the Marte ER (the Extended Range version of the Marte missile) and Exocet MM40 Block 3, and can work autonomously or data-linked to a coastal surveillance network. Further details of the sale remain unknown, but follow a deal signed in June to supply missiles for new naval vessels recently procured from Fincantieri.

  • PKL Services have been awarded a $495 million USAF contract for work on the Royal Saudi Air Force’s F-15 fleet. The indefinite-delivery/indefinite-quantity contract covers maintenance, upgrade, and training of the Saudi Strike Eagle S- and SA-type fighters. Saudi Arabia has been flying the F-15SA since 2013, and features include improved performance and increased survivability at a lower life-cycle cost as well as two additional wing stations for increased payload and capability.

Europe

  • With their own new shiny weapons soon to be delivered as part of its NATO upgrade, Lithuania is passing on their older ammunition to embattled neighbor Ukraine. Over 150 tons of Soviet ammunition, mainly AK-47 cartridges, are been sent from their old munitions stocks as part of a 2014 commitment to support Ukraine’s operations against a Russian-backed insurgency in eastern Ukraine. So far NATO, primarily the US, has been reluctant to directly support non-NATO member Ukraine with offensive military equipment, limiting its support to “non-lethal” aid.

Asia Pacific

  • An export version of the Kalibr cruise missile may be sold to India, according to Russian media. Due to provisions of international agreements that prohibit the export of missiles with a greater flight distance, the distance of the export models could be curtailed to to less than 300km. The Kalibr has seen battlefield testing during Russia’s support for the Syrian government through their ongoing civil war with several launches targeting groups such as the Islamic State and former Al-Qaeda outfit, Jabhat Fatah al Sham (previously known as the Al Nusra Front).

  • Philippines are to request a 14% defense budget increase in order to enhance maritime security and tackle Islamist militants. Large budget increase jumps are fast becoming a trend for south and east Asian governments, as many aim to counter both an increasingly assertive China and domestic security issues. With these funds, President Rodrigo Duterte has vowed to “destroy” the Islamic State-linked Abu Sayyaf, responsible for a spate of kidnappings in the country’s Muslim majority south, and also linked to last Friday’s bombing in Davao City.

Today’s Video

A CH-47 Chinook assisting an Apache stuck in a muddy Texas field :

Catégories: Defence`s Feeds

NG Gets $375M for G/ATOR Sys | Congress Set to Approve $7B in Arms to Qatar & Kuwait | Japan Plans to Boost Defense Budget Again for 2017

ven, 02/09/2016 - 01:58
Americas

  • A SpaceX Falcon 9 rocket exploded during a static test-firing yesterday morning at Cape Canaveral, Florida. The explosion resulted in the destruction of its payload, an Israeli-owned AMOS-6 communications satellite. SpaceX had planned to launch the Falcon 9 and satellite into orbit on Saturday.

  • Northrop Grumman has been awarded a $375 million Navy contract for procurement of the Ground/Air Task-Oriented Radar (G/ATOR) system. Due for completion in 2020, the contract will cover nine G/ATOR low-rate initial production systems. G/ATOR provides a highly mobile, multi-mission radar system designed to support global expeditionary requirements and offers multi-faceted detection and tracking capabilities to engage a range of hostile threats while providing robust air traffic control.

  • US government and industry officials have been cleared to finish negotiations for the sale of 24 Beechcraft T-6C Texan trainers to the Argentine air force. The $300 million sale comes at the same time as the completion of the 20-year-old Joint Primary Aircraft Training Systems (JPATS) program, offering a timely lifeline to the T-6C production line in Wichita, Kansas. The company also has received a recent order from the UK Ministry of Defence to supply T-6 trainers to replace Embraer Tucanos.

Middle East & North Africa

  • After years of delay, the US Congress look set to approve a $7 billion arms sale to Qatar and Kuwait as early as next week. The sales have been pending for more than two years, amid concerns raised by Israel that equipment sent to Gulf Arab states would be used against them. Qatar has been waiting on a $4 billion sale for 36 Boeing F-15 fighter jets, while Kuwait is looking for 28 F/A- 18E/F Super Hornets, plus options for 12 more, valued at around $3 billion.

Europe

  • Ukraine and China are to recommence the production of the Antonov An-225 “Cossack” strategic airlifter. As part of the deal, Beijing will get access to designs and technologies of the aircraft for the purposes of domestic production. Only one An-255 was ever finished to an airworthy standard and flown, and while work on a second example was begun it had become clear by mid-2001 that funding would no longer be provided, and the project was shelved.

Asia Pacific

  • South Korea may join the US Navy, India, and Australia in operating the P-8A maritime patrol aircraft, according to defense ministry officials. If given the go ahead, Seoul may purchase four of the aircraft to help expand their surveillance and anti-submarine warfare capabilities following submarine launched ballistic missile (SLBM) tests by North Korea. The aircraft can fly at altitudes up to 41,000 feet and are capable of striking enemy submarines immediately upon detecting them with weapons such as the MK 54 torpedo.

  • Once again, Japan has upped its request of funds for next year’s defense budget. Now valued at $51.47 billion, the funds will go toward rejigging the nation’s defense requirements amid a decrease in Russian threats and an increased threat from North Korea. The most expensive purchase is the $970 million upgrade of their Patriot missile defense system, while another significant amount will go for funding to improve Aegis destroyers, Japan’s first line of defense against ballistic missiles.

  • Sikorsky is to produce and deliver 24 UH-60M Black Hawk helicopters to Taiwan. The $135 million sale will see the aircraft uniquely configured for the Taiwanese government with delivery by October 2018. This follows a recent $158 million contract modification to produce 14 more Black Hawks for the US Army.

Today’s Video

Explosion of SpaceX Falcon 9 rocket:

Catégories: Defence`s Feeds

Flexible G/ATORs: The USMC’s Multi-Mission AESA Ground Radars

ven, 02/09/2016 - 01:55
G/ATOR diorama
(click to view full)

The US military’s long run of unquestioned air superiority has led to shortcuts in mobile land-based air defenses, and the US Marines are no exception. A December 2005 release from Sen. Schumer’s office [D-NY] said that:

“Current radar performance does not meet operational forces requirements… consequences could potentially allow opposing forces to gain air and ground superiority in future operational areas.”

One of the programs in the works to address this gap is the AN/TPS-80 G/ATOR mobile radar system. It’s actually the result of fusing 2 programs: the Multi-Role Radar System (MRRS), and Ground Weapons Locator Radar (GWLR) requirements. When the last G/ATOR software upgrade becomes operational, it will replace and consolidate numerous legacy radars, including the AN/TPS-63 air surveillance, AN/MPQ-62 force control, AN/TPS-73 air traffic control, AN/UPS-3 air defense, and AN/TPQ-36/37 artillery tracking & locating radar systems.

The G/ATOR System NGC on G/ATOR
click to play video

G/ATOR systems were supposed to be transportable in C-130 Hercules tactical transport aircraft, and by MV-22 Osprey tilt-rotors (underslung), CH-53 heavy helicopters (underslung or internal), or CH-47 heavy lift helicopters (underslung or internal). That’s still sort of true.

The radars themselves were originally slated be mounted on HMMWV jeeps, which would have fit all of these requirements. Issues with weight and protection eventually pushed the Marines to abandon the system’s 3-jeep model, and to make the radar itself a towable trailer.

My ride’s here…
(click to view full)

The system can still be carried in a single C-130, and consists of: (1) a Radar Equipment Group trailer, (2) a Power Equipment Group 60kW generator in an ISO container, and (3) a Communication Equipment Group mounted on a HMMWV. The PEG container will usually be mounted on an MTVR truck, which will also tow the REG trailer. The USMC will also have the option of leaving the truck behind, and airlifting the radar trailer, power container, and C2 HMMWV in 3 separate CH-53 helicopter or MV-22 tilt-rotor loads.

Flexible Fielding: G/ATOR Increments Incoming…
(click to view full)

The AN/TPS-80 G/ATOR is intended to be a software-based radar. This idea has become common for radios, and many fighter radars offer a number of different modes (air scan, ground looking SAR maps, etc.) via software. The idea for G/ATOR is similar: common hardware that can switch in the field from air traffic control, to aerial volume search and targeting, to artillery counterfire tracking. Northrop Grumman says that some specific switches would require a radar shutdown and restart as the new software is loaded.

This kind of flexibility also lets the USMC field the radar, then add new capabilities via 3 blocks of upgrades:

Initial Increment I/ Block 1 – in testing. supports 2 distinct mission areas: Short range air defense, and air surveillance in tactical air operations centers (TAOC), including baseline IFF (identification, friend or foe). It replaces the AN/UPS-3, AN/MPQ-62, and AN/TPS-63 radar systems. G/ATOR program manager Capt. Lee Bond (USN, ret.) explains one of the advantages it offers:

“There are threats out there today – like small hovering UAVs – that were not envisioned when our legacy radars were developed and fielded a generation ago. So the performance of our legacy radars against those emergent threats on the modern battlefield is spotty at best. The smaller and slower the target gets and the lower to the ground it flies, the trickier it is for the traditional radar to find it. G/ATOR absolutely wipes out those limitations and gives you complete situational awareness of everything in the sky.”

Increment I engineering will allow growth to accommodate all following increments without equipment re-design, and will provide an open architecture that makes it easier to upgrade the computers, computer programs, and firmware in all subsequent increments. Its development phase was supposed to end at the end of April, 2012, but Milestone C approval didn’t come until January 2014.

Increment II/ Block 2 – development underway. will address the Marine Expeditionary Force counter fire/targeting missions, adding ground counter-battery and target acquisition against enemy mortars, rockets, or artillery. It replaces the AN/TPQ-46 radar system.

The baseline requirements remain, and the Marines have added program R&D funding to investigate the potential for additional capabilities within this area.

Increment III – planning only. This set of improvements will actually come after IV. It adds tactical enhancements for the air mission, including decoy/electronic counter-counter measures capabilities, electronic protection equipment and software, sensor netting, an advanced radar environmental simulator (RES), and a logistics integrated data environment (IDE, a computer system for managing and monitoring fleet health, spares supply, maintenance instructions, etc.). “Non-cooperative target recognition” capabilities are very useful for identifying enemies, and they’re even more useful if a Marine Corps Hornet’s IFF system has a problem on the way back in.

There’s no firm timeline for Increment III yet, and its components could change. Future plans involve sensor netting and integration with the USMC’s shoulder-fired Stinger air defense missiles, or their successors.

Increment IV/ Block 4 – RFI out. will add an air traffic control (ATC) capability, which is extremely useful in disaster relief situations like Haiti. IFF Mode 5/S capability has also been moved here. The baseline requirements remain, and the Marines have added program funding to investigate the potential for additional capabilities in this area.

Development will come before Increment III. Existing radars and software for this task are already well-understood, so this was seen as a safer step with a quick payoff. 2015 is the target for development to begin, with late 2018 or 2019 the target for entering service. It will replace the AN/TPS-73 radar system.

The G/ATOR Program

At present, the Marine Corps’ Approved Acquisition Objective is a total of 45 G/ATOR systems, about a 30% drop from the 2005 baseline of 64 systems. The Marines had wanted 81 systems before G/ATOR became a formal program.

G/ATOR began in 2007, and has left the System Design and Development (SDD/EMD) Phase to begin low-rate production. Formal government developmental testing (DT) is underway. Initial DT1B1, DT1B2, and DT1B3 phases have been completed at Wallops Island, VA, and Yuma Proving Grounds, AZ.

Tactically, the TPS-80 G/ATOR will fit below the USMC’s existing AN/TPS-59 long-range radars, offering less range, but finer detail within its scan radius. An evolved version may even replace the USMC’s longer-range radars, under the joint service 3DELRR (“3-dealer”) program, though the initial 2014 award went to a Raytheon offering before GAO challenges were filed.

G/ATOR TPS-80: Technology Challenges Now: TPS-63
(click to view full)

Once all of these increments are implemented, AN/TPS-80 G/ATOR will use its active electronically scanned array (AESA) technology to provide aircraft detection, tracking, and engagement; cruise-missile detection and engagement; ground-weapon location; and military air-traffic control – all in one package.

Radars are all about time & energy management. That has traditionally involved electronic hardware, but these days it relies more on software: marshaling and directing the energies required, placing them high or low as needed, emitting signals at precise times to shape them. The electronics and software must collect and analyze the results, in order to create the right kind of “complete” picture. G/ATOR’s various tasks have very different, even contradictory time/energy requirements. Fulfilling those tasks would require a radar that offered new levels of flexibility.

Both the Marines and Northrop Grumman acknowledged the challenges up front. It has been treated as a technologically difficult program since its inception in 2007.

Making G/ATOR thinkable APG-81 test mount
(click to view full)

A trio of technology developments made G/ATOR thinkable.

The 1st was a growing trend toward active electronically scanned array (AESA) radars, which are composed of thousands of individual solid state transmit/receive modules that can operate individually or in assigned groups. In addition to the flexibility they offer, AESA radars have smaller sidelobes beyond the main beam focus, which helps to reduce false alarms for applications like counterfire targeting.

The 2nd trend is the growing dominance of software over hardware, especially in controlling and interpreting information from AESA-type radars. Northrop Grumman already had experience implementing different modes in its AESA fighter radars, including a project to turn them into high-bandwidth communications relays.

In G/ATOR’s case, the connection was very direct. Northrop Grumman personnel have confirmed that the F-35 fighter’s AN/APG-81 radar technologies were adapted for use in G/ATOR, and that it will use the APG-81 facility and production line.

The 3rd trend is Moore’s Law, which makes an exponentially-increasing level of computing power available to control radar systems and analyze their returns.

These advances make G/ATOR thinkable, but actually developing it requires very advanced engineering expertise. This is especially true when the radar in question will face the kinds of ground environments and general unpleasantness associated with the US Marines, as opposed to clean air force maintenance hangars and navy decks.

Northrop Grumman’s management made a decision that the benefits of a successful program justified a significant corporate commitment, and gave the program access to top talent within the firm. Now, all they had to do was execute.

Execution, Without Dying The new G/ATOR
(click to view full)

Every program encounters engineering and financial challenges, and G/ATOR has been no exception.

Creating a radar that can do all of these things, while taking Marine Corps level abuse, required new engineering. To offer just a few examples:

Weight. The ability to take Marine Corps level abuse also requires survivability. Which meant extra weight. The program’s shift away from 3 unarmored and integrated HMMWVs to a “MTVR truck + trailer + HMMWV” configuration cost the development team about a year for re-design, refining, and approval.

Temperature. G/ATOR is designed to operate in ambient temperatures of -40 to +55 degrees Centigrade, and must keep its electronics at a common temperature to avoid data errors. Instead of using heavy 2-stage cooling systems, however, the radar uses forced circulation from fans blowing ambient uncooled air through the array. As a side-benefit, that made the radar lighter.

Scope. These basic design challenges were exacerbated by scope increases, as potential flexibility became thinkable and then real. This is exciting, because new capabilities create additional growth opportunities, and new potential uses. On the other hand, it’s also taxing to a design team already challenged by the core project.

Upgradeability. Then there’s the double-edged sword that is Moore’s Law of geometrically expanding processor chip power.

If a chip is obsolete in 5 years, and may not be produced at all in 10, but the radar must last 30 years, what is one to do? One option is to switch to a processor with 100% more growth capacity early in the project. Given Moore’s Law, that only buys you about 5 more years, maybe 10 at the most. The US military’s growing insistence on open systems architectures and modularity (OSA/ MOSA) will help make future swap-ins easier, but OSA/MOSA implementations are not created equal. Engineering design quality is the difference, which takes time.

Gallium Nitride. Quality engineering also opens new doors, because base technology matters. Thinning air for the generator’s carburetor currently pushes the TPS-80’s PEG below its full 60 kW power output at altitude. Back in 2007, the US military was near the beginning of its efforts to use Gallium Nitride (GaN) as a more efficient semiconductor material. More efficiency equals better performance, so the promise was clear, but the development risks weren’t. In response, the program stuck with conventional Gallium Arsenide (GaAs) electronics, but conducted studies and planned for a switch down the road.

Those studies showed that GaN circuits could draw just 50 kW for full radar power, allowing full effectiveness at 10,000 feet or beyond. Higher altitude naturally improves a radar’s field of view, and is a defining feature in places like Afghanistan, so the tactical impact is significant.

By 2012, research had made considerable advances thanks to investments by DARPA, the US Army, the USAF, and defense firms. The USMC kept its promise to set aside funds for the GaN switch, and USAF development dollars from the 3DELRR program built on good engineering and early planning to help complete the shift. In late FY 2013, the G/ATOR program office began the technology switch from to GaN.

Not cheap.
(click to view full)

Finally, there’s the financial end.

On the bad news front, the deliberate devaluation of the US dollar pushed a huge rise in gold’s American dollar price from 2007, which has backed off somewhat for now. Gold’s rise has been the subject of many reports, but few link that to gold’s industrial use in the kinds of high-fidelity connectors needed by a radar’s advanced electronics.

On the good news front, G/ATOR has made enough progress that it’s attracting interest in early deployment. That can be dangerous to a program, because the system will still have gaps, which can be exploited by politicians as an excuse to remove funding. The G/ATOR team has had to think hard about this, and one of their conclusions was that they could leverage Urgent Operational Requirements to finish the production program 3 years early. Faster replacement means less money spent maintaining earlier radars, which aren’t in ideal shape. It would also cut 3 years of variable costs out of production.

The current trend is to stretch defense programs out into costlier timelines, in order to save a bit of money each year. Events get a vote, however, and it remains to be seen whether G/ATOR manages to buck the general trend.

G/ATOR TPS-80: Industrial Partners

Industrial partners for the G/ATOR TPS-80 program include:

  • Northrop Grumman (prime contractor)
  • Caterpillar Logistics in Morton, IL.
  • CEA Technologies, Inc. in Canberra, Australia (radar expertise, also involved in the CEAFAR/CEAMount project for Australia).
  • Curtiss Wright.
  • Moog Industries.
  • Saab-Sensis Corporation in Syracuse, NY.
  • Stanley/Techrizon in Lawton, OK. Formerly Telos.

G/ATOR: Beyond the Marines 3DELRR

G/ATOR began with the Marines, but its team doesn’t expect it to stay there.

When their Highly Expeditionary Long-Range Surveillance Radar program fell victim to budget constraints, the Marines joined the USAF’s 3DELRR air and ballistic missile defense program. In a 2012 interview, G/ATOR program manager Capt. Lee Bond said that G/ATOR’s scope would provide 85% of 3DELRR’s specifications, with the additional capabilities from increments II & IV thrown in for free. He believes that using G/ATOR as a base could cut 2 years from development time, and lower costs by 20% due to economies of scale. Northrop Grumman has openly stated their intent to pursue this path.

Bond also believes that G/ATOR would exceed the expected specifications for the US Army’s coming Multi-Mission Radar solicitation, depending on how the Army defines “simultaneous” multi-mission capability.

Northrop Grumman remains interested in future naval applications, which could lead to scaled G/ATOR technologies equipping smaller ships like the USA’s Littoral Combat Ships, or being incorporated into emerging multi-band radar naval arrays like AMDR. Northrop Grumman will say only that they’re looking at naval applications, and a November 2013 ONR study will look at replacing many of the US Navy’s older air surveillance radars with a G/ATOR derivative.

Then, there are foreign buys. The USA isn’t the only country worried about finding a very different set of targets on modern battlefields, or needing high-performance artillery-tracking radars for deployments abroad. Budget cuts in some countries make multi-mission radars attractive, and Northrop Grumman’s experience has been that ground-based radar exports have been worth 2.0x – 2.5x the value of American orders.

Official expressions of interest aren’t possible until a new system is cleared for those discussions, but Northrop Grumman says that they’ve receive a number of unofficial expressions of interest. Once G/ATOR passes Milestone C and can move into Low-Rate Initial Production, the USMC will be freer to respond to official inquiries from foreign governments. That happened in January 2014.

TPQ-53 on truck
(click to view full)

Northrop Grumman’s competitors haven’t been idle, of course. Lockheed Martin is busy introducing its new AN/TPQ-53 counter-battery radar, while Raytheon has its MPQ-64 Improved Sentinel series of air defense radars. Abroad, Saab’s Giraffe series of land and sea radars already fuses air surveillance and counter-battery targeting, and their Giraffe 4A is designed as a next-generation capability with the same capabilities as G/ATOR Block 2. All of these radars can also take advantage of new technologies, and some variants offer features within G/ATOR’s proposed set.

On the other hand, the TPS-53 grew out of an Army RFP that optimized its architecture for the counter-battery mission, making future additions and changes more difficult. The MPQ-64 Sentinel is a widely-used air defense radar, but its parameters re: range, elevation angle, power, etc. create their own limitations. Both competitors are likely to see continued improvement, but G/ATOR’s level of back-end integration remains unique, and its architecture is likely to give it rate-of-improvement advantages per dollar spent. To date, the TPS-80 G/ATOR remains the only Pentagon JROC-approved program that has funded integration of all of these capabilities into 1 system.

Contracts & Key Events

Unless otherwise noted, US Marine Corps Systems Command in Quantico, VA issues all contracts to Northrop Grumman’s Electronic Systems unit in Linthicum Heights, MD.

FY 2014 – 2016

LRIP contracts begin; Tracking works well, but TPS-80 has reliability issues; 3DELRR loss is appealed; Contract to examine TPS-80 as a ship radar; G/ATOR to get BMD capability? Oorah!
(click to view full)

September 2/16: Northrop Grumman has been awarded a $375 million Navy contract for procurement of the Ground/Air Task-Oriented Radar (G/ATOR) system. Due for completion in 2020, the contract will cover nine G/ATOR low-rate initial production systems. G/ATOR provides a highly mobile, multi-mission radar system designed to support global expeditionary requirements and offers multi-faceted detection and tracking capabilities to engage a range of hostile threats while providing robust air traffic control.

Nov 3/14: USMC Plan. The USMC’s Aviation Plan to 2030 deals with radars as well. G/ATOR may have lost the 3DELRR competition for now (q.v. Oct 21-22/14), but it might gain a ballistic missile defense capability anyway:

“TPS-80 Block III is not a formal acquisition program, but consists of software developments that will enhance the radar’s performance and capabilities. Threats will continue to evolve over the course of the radar’s lifecycle and maintaining currency to detect emerging threats will remain a priority…. These software upgrades may include but are not limited to, Non-Cooperative Targeting Recognition (NCTR), Electronic Protection (EP) and Theatre Ballistic Missile (TBM) Tracking.”

If the USMC does go ahead with Increment III, they’ll have some interesting choices to make. Sources: USMC, Marine Aviation Plan 2015 [PDF].

Oct 23/14: A $207.3 million contract modification for 4 G/ATOR low-rate initial production systems, including operating spares, contractor engineering services and support, developmental and operational test support, and transition to production. $175.6 million is committed immediately, using FY 2013 and 2014 USMC RDT&E and Procurement funds; $94.7 million will expire on Sept 30/15.

Work will be performed in Linthicum Heights, Maryland (55%); East Syracuse, NY (24%); Stafford Springs, CT (5%); San Diego, CA (5%); Big Lake, MN (3%); Londonderry, NH (2%); High Point, North Carolina (2%); Wallingford Center, CT (2%); Camarillo, CA (1%); and Woodbridge, IL (1%), and is expected to be complete by October 2017 (M67854-07-C-2072).

4 LRIP radars

Oct 21-22/14: GAO PRotests. The USAF confirms that Northrop Grumman has formally issued a protest against the USAF’s 3DELRR award to Raytheon. The next day, Lockheed Martin confirms that they are also filing a protest.

That halts the program until the challenge receives a ruling, which could take up to 100 days. In order to succeed, the challengers need to show that either Raytheon’s radar isn’t technically acceptable, that it wasn’t the lowest priced – or that something in the process went awry, ensuring that that competitors were treated differently or criteria weren’t applied fairly. Sources: See DID’s GAO Primer | Defense News, “Northrop Challenges 3DELRR Contract Award” | Reuters, “UPDATE 1-Lockheed Martin challenges contract to Raytheon”.

Oct 6/14: Raytheon wins. Raytheon is on quite the radar streak lately, adding the USAF’s 3DELRR area air and missile defense radar to its naval AMDR win.

3DELRR loss, and appeal

March 31/14: GAO Report. The US GAO tables its “Assessments of Selected Weapon Programs“. Which is actually a review for 2013, plus time to compile and publish. Our program dashboard has been updated accordingly. G/ATOR technologies are mature and its design is stable and demonstrated, but its production processes are not yet mature. Fortunately, the performance-boosting GaN technology for the T/R modules is maturing on schedule. Unfortunately, G/ATOR has a number of issues with system startup, random crashes, operator control console freezes, and an unstable command and control interface (q.v. Jan 28/14). In response:

“The G/ATOR program office has put together a plan to incorporate software fixes to correct system start up and prevent crashes. Some hardware alterations may be required. The program office plans to increase and improve system performance by upgrading the software integration lab to support accelerated testing and conducting field testing with users every six months to demonstrate reliability growth and operational relevance….

The program is authorized to procure 57 G/ATOR systems; however, only 45 were funded in the fiscal year 2014 President’s budget. According to the program office, the 12 unfunded G/ATOR systems will require funding by fiscal year 2016 in order to meet initial operational capability…. In addition, the concurrent development and production of G/ATOR may be adversely affected by personnel shortages caused, in part, by the impending retirement of highly experienced acquisition workforce staff.”

January 2014: Milestone C approval is given to the AN/TPS-80 G/ATOR Block 1 radar, which allows low-rate initial production contracts to begin. Sources: GAO-13-294SP, “Assessments of Selected Weapon Programs” (q.v. March 31/14).

Milestone C

Jan 28/14: DOT&E Testing Report. The Pentagon releases the FY 2013 Annual Report from its Office of the Director, Operational Test & Evaluation (DOT&E). G/ATOR is included, and it seems to be having serious software issues, creating MTBOMF of 42.8 hours in the Field User Evaluation instead of the 500 hour goal:

“G/ATOR reliability-related software deficiencies have continued and have kept the radar from meeting its Mean Time Between Operational Mission Failure (MTBOMF) requirements. After allowing additional time for the software to further mature prior to the program’s Milestone C decision (scheduled for 1QFY14), the program added a fourth developmental test period to assess improvement…. it remains unclear if G/ATOR will meet key reliability metrics by the start of IOT&E (scheduled for 3QFY17)….

500 hours MTBOMF cannot be realistically achieved within the context of the current G/ATOR test schedule through IOT&E…. The program has not yet finalized an acceptable reliability growth strategy, has not completed an adequate test design for the IOT&E…. Over 80 percent of the Block 1 and Block 2 procurement is planned with GaN radar modules, yet it remains unclear if adequate production representative versions of the system will be available in time for IOT&E.”

Dec 4/13: Testing. Northrop Grumman announces that G/ATOR tests at MCAS Yuma have been successful, including support for 2 Weapons and Tactics Instruction (WTI) events. The firm says that the TPS-80 “detected and tracked targets that other systems at the exercise were not able to”, extracting targets from heavy clutter backgrounds and exceeding its objective-level (best case) availability requirements.

We’ll have to wait until early in 2014 to read the DOT&E’s report, but it sounds like the program is headed to Milestone C and Low-Rate Initial Production. Sources: Northrop Grumman, Dec 4/13 release.

Nov 6/13: Saltwater G/ATOR? Northrop Grumman announces an 18-month, $6 million study to explore replacement options for the US Navy’s AN/SPS-48 (all carriers, LHA/LHD amphibious air support, and LPD-17 amphibious ships) and AN/SPS-49 (all carriers, FFG-7 frigates, CG-47 cruisers, LHD amphibious air support, LSD-41/49 amphibious ships) air surveillance radars.

The Enterprise Air Surveillance Radar (EASR) Study’s terms of reference would modify an existing radar to act in this capacity, and Northrop Grumman states that they’ll be using their AN/TPS-80 G/ATOR. Existing FFG-7 frigates are too old and limited to be good upgrade candidates, and the CG-47 cruisers and LSD ships are currently in the middle of major modernizations. With that said, the pace of major ship maintenance periods still leaves the USN with a number of options if they decide that this is a good idea. EASR is sponsored by the Office of Naval Research under its Integrated Topside program. Sources: NGC, Nov 6/13 release.

FY 2010 – 2013

System development extended; Testing begins; Increment II begins. G/ATOR REG
(click to view full)

Sept 11/13: GaN. A $10.8 million cost-plus-fixed-fee contract modification will raise the EMD Phase cost ceiling, in order to fund G/ATOR’s transition to Gallium Nitride electronics. GaN improves the radar’s performance, which allows the Marines to either push it harder or throttle back the generator. Fueling generators adds to both logistics burdens and operational risk, and even with full fuel, G/ATOR was falling short at higher altitudes that sap its generator’s power. GaN electronics offers full performance at just 50 kW, instead of the generator’s sea-level limit of 60 kW. Since higher altitude equals a wider field of view, the difference matters on the battlefield.

The G/ATOR program has always known about this difference, but it chose to wait until the underlying electronics were more proven, and the industrial infrastructure made it a low-risk switch. Time has delivered both changes, and development financing from the 3DELRR program (q.v. Aug 26/13) appears to have bridged the last technical gaps within the TPS-80 design.

Work will be performed in Linthicum Heights, MD, and is expected to be complete by Dec 31/14. This contract wasn’t competitively procured, as it’s within the scope of the current contract and its changes clause (M67854-07-C-2072, PO 0115).

GaN transition

Aug 26/13: 3DELRR. Northrop Grumman announces that they completed their 3DELRR radar demonstration back in July. They refer to it as “The U.S. Air Force system variant of the Department of Defense AN/TPS-80 radar…” but unlike the USMC’s current G/ATORs, this S-band radar uses Gallium Nitride transmit/receive modules. That technology is in the USMC’s plans, and the development work may pay off for the Marines, just as all the work on the USMC’s TPS-80 G/ATOR would offer dividends to the USAF.

As one might expect, given their design’s lineage, Northrop Grumman also touts “successful system ambient air cooling under extremely hot operating conditions,” as well as the radar’s well-developed system self-test and calibration capabilities. Sources: Northrop Grumman Aug 26/13 release.

June 28/13: More SDD. Northrop Grumman Electronic Systems in Linthicum Heights, MD receives a $24.5 million cost-plus-incentive-fee, firm-fixed-price contract modification that increases the G/ATOR EMD phase’s estimated ceiling cost.

These price hikes parcel out as $21.1 million for development using FY 2013 funds, with $13.6 million committed immediately. EMD work will be performed Linthicum Heights, MD (88%); Yuma, AZ (10%); and Syracuse, NY (2%), and is expected to be complete by April 25/14.

The added $3.4 million for extra production engineering support uses FY 2012 funds, with all funds committed immediately. Work will be performed in Linthicum Heights, MD (81%), and Syracuse, NY (19%), and is expected to be complete by Feb 16/14.

This brings announced EMD contracts to around $533.7 million, but the GAO’s August 2012 figures already had G/ATOR development spending pegged at $539.5 million of a planned $893.1 million. The gap is easily explained, as announcements only cover contracts above a certain threshold. Note that the original baseline for G/ATOR development was $364.3 million in $FY13 (M67854-07-C-2072).

May 24/13: SAR. The Pentagon finally releases its Dec 31/12 Selected Acquisitions Report [PDF]. The news isn’t good for the G/ATOR program, which is shrinking sharply, again, even as the number of Marines has risen. G/ATOR numbers have now shrunk by about 30% since the program’s inception:

“Ground/Air Task Oriented Radar (G/ATOR) – Program costs decreased $912.1 million (-27.4%) from $3,325.9 million to $2,413.8 million, due primarily to a decrease in quantity of 12 systems from 57 to 45 systems (-$464.0 million) and associated estimating allocation (+$0.9 million) and a revised cost estimate for anticipated production efficiencies associated with funded design investments (-$447.0 million). Other decreases were attributable to a reduction in support costs (-$52.2 million) and initial spares requirements (-$12.9 million) resulting from investment in efficiencies and economic order discounts. These decreases were partially offset by increases to the cost estimates for investments in the production efficiency initiative (+$33.3 million) and technology refresh assumptions and associated potential future change orders (+$18.8 million), and the application of revised escalation indices (+$27.5 million).”

SAR – another radar cut

April 15/13: Budget. The FY14 request submitted by the Navy barely changes from the previous year’s budget, at $78.2 million. FY16 also remains stable, but FY15 and FY17 are lower by $19 million and $26 million respectively. Air Defense/Air Radar AD/SR Capability System Demonstration (DT)(1B) and Operational Assessment (OA) are extended by 2 quarters, while LRIP and Milestone C both slip by 1 quarter. Milestones further out in the plan (IOT&E, IOC, FRP decision) are supposed to be unaffected by these changes earlier in the schedule. US Navy PE 0204460M [PDF].

March 28/13: GAO Report. The US GAO tables its “Assessments of Selected Weapon Programs“. Which is actually a review for 2012, plus time to compile and publish. G/ATOR appears for the 1st time, and the overall report is good.

GAO acknowledges that performance requirements for G/ATOR have grown from 5 key performance parameters in 2005, to 16 in 2012. Program officials describe this as a “clarification,” but there’s no question that KPP expansion creates more development work. This explains some, but not all, of the program 145% RDT&E jump since the 2005 baseline. Overall program cost is up 101.2%, to $3.034 billion as of June 2012, despite a drop from 64 to 57 radars.

On the bright side, things have been much more stable since the program was re-baselined in January 2010. All 6 critical TPS-80 technologies are approaching full maturity, with 100% of design drawings released, using GaAS (Gallium Arsenide) electronics. The GAO gives no specific timeline for incorporation of better GaN (Gallium Nitride) electronics, but does say the program could save as much as $500 million from the change, while reducing weight and power demand.

Dec 21/12: More SDD. An $8.6 million cost-plus-incentive-fee contract modification to increase G/ATOR’s estimated EMD (same as SDD) phase cost ceiling, in light of an expected cost overrun. $2.1 million is committed immediately.

Work will be performed in Linthicum Heights, MD (75%) and Syracuse, NY (11%); Wallop’s Island, VA (11%) and Yuma, AZ (3%); and is expected to be complete April 25/14 (M67854-07-C-2072).

July 26/12: Testing. Northrop Grumman Corporation’s initial AN/TPS-80 G/ATOR Increment 1 system has been delivered to Surface Combat Systems Center (SCSC) Wallops Island in Eastern Virginia for G/ATOR’s 1st and 2nd phases of developmental testing. Yuma, AZ will host the 3rd and final DT phase, and operational assessment. NGC.

June 6/12: Increment II. The USMC is asking Northrop Grumman’s Electronic Systems sector in Linthicum Heights, MD to begin developing G/ATOR’s Increment II Ground Weapons Locating Radar (GWLR) software, which will track incoming shells and rockets back to their point of origin. The amount of the contract has yet to be negotiated. Military Aerospace & Electronics.

Dec 7/11: More SDD. A $32.3 million contract modification for the continuation of GATOR Increment I, to support the changes made to the risk reduction change order.

Work will be performed in Linthicum Heights, MD (95%), and Syracuse, NY (5%), and is expected to be complete by Dec 31/13. This contract modification was not competitively procured, as the contract effort is within the scope of the current contract and is entered into pursuant to the changes clause (M67854-07-C-2072).

Nov 17/11: Northrop Grumman Corporation announces that its 1st Ground Based Radar Conference drew more than 90 attendees over 3 days, representing 10 nations. Besides the G/ATOR system, Northrop Grumman also sells AN/TPS-78 and AN/TPS-703 solid-state tactical mobile radar systems; and the Highly Adaptable Multi-Mission Radar (HAMMR) AESA radar for on-the-move, 360 degree coverage.

Feb 7/11: Testing. Northrop Grumman announces that they’ve integrated all subsystems of the AN/TPS-80 Ground / Air Task Oriented Radar (G/ATOR) system. This 1st complete system is currently undergoing system-level integration, performance, and live target testing at the company’s Electronic Systems sector engineering and manufacturing complex, located next to Baltimore’s Washington International Marshall Airport.

As noted above, G/ATOR’s subsystems include the Radar Equipment Group (REG, AESA antenna and all associated control and processing electronics) mounted on a lightweight tactical trailer, the Communications Equipment Group (CEG) and the Power Equipment Group (PEG).

1st complete G/ATOR I

Feb 4/11: More SDD. A $38.3 million cost-plus-incentive-fee contract modification, extending the GATOR Increment I development program. It will support the agreed-upon expansions to the original integrated performance baseline, and extend the contract’s period through April 30/12.

Work will be performed in a contractor facility at Linthicum Heights, MD (85%); and by Northrop Grumman’s subcontractor, Sensis Corp., located in Syracuse, NY (15%). Work is expected to be complete in April 2012 (M67854-07-C-2072).

April 5/10: Testing. Northrop Grumman Corporation announces the next system test phase.

This phase will use a fully populated G/ATOR array, complete with all transmit/receive modules, radiating elements, prime power and distribution, RF manifold, and associated control and processing electronics. This newest series of tests includes detailed verification that the G/ATOR’s active electronically scanned array (AESA) hardware will support all of the system’s multi-mission capabilities, and demonstration of all required AESA functions including beam generation, steering and control, performance at full rated power, operating bandwidth and automated array calibration techniques.

Testing of this array is taking place at the company’s antenna test facility in Norwalk, CT; in 2009, a prototype partial G/ATOR array was tested at the same facility, and expanded testing on that prototype radar array continues at NGC’s engineering and manufacturing complex in Baltimore. Once the 2nd, full array completes testing, it will be integrated with the other G/ATOR components for the next levels: full systems-level integration testing, and subsequent environmental testing.

January 2010: G/ATOR program is re-baselined due to cost and requirements growth. Source: GAO.

Re-baselined

Dec 29/09: More SDD. A $35.5 million contract modification increases the estimated cost ceiling and target cost of CLIN0001, finalizing change orders to the configuration the G/ATOR’s new up-armored MTVR carrier trucks. It also covers the modification and implementation of the upgraded UPX-40 as the identification-friend-or-foe system, and a change of the IFF system from government furnished property to contractor-acquired government property.

Approximately 80% of the work will be performed by Northrop Grumman in Linthicum Heights, MD, and approximately 20% will be performed by Northrop Grumman’s subcontractor, Sensis Corp. in Syracuse, NY. The contract modification was not competitively procured, as the contract cost increase is within scope of the current contract and is entered into pursuant to the changes clause (M67854-07-C-2072).

Dec 10/09: Program support. General Dynamics Information Technology in Fairfax, VA received a $5.8 million task order under a firm-fixed-price contract. They’ll provide on-going technical, managerial and logistics support for Program Executive Office – Land Systems, Program Manager Ground/Air Task Oriented Radar (G/ATOR).

Emerging development efforts include engineering, architecture and logistical analysis of G/ATOR. Support requirements include supporting the G/ATOR Milestone C processes, and engineering and technical reviews (since Milestone B is complete). Additional support requirements include development and maintenance of programmatic information to be displayed in a G/ATOR Program Operations Center, information security, admin support, information assurance, joint interoperability, family of system definition/development and business analysis to define investment strategies, contract administration, planning programming and budgeting planning, logistics support, equipment specialist, earned value management system, program management plan support and cost/risk assessments. Due to in-sourcing, cost proposal and analysis efforts will not be required.

Support requirements include for the contractor to conduct/complete the logistics assessment of the manpower, personnel and training requirements and facilities analysis needed to support G/ATOR, the development of Manpower Training Integrated project team, to use as input and/or the development of the Manpower Personnel and Training plan. Work will be performed in Quantico, VA, and the contract will end in December 2010. The Marine Corps System Command in Quantico, VA manages the contract (M67854-02-A-9014, #0042).

Nov 16/09: More SDD. A $44.5 million modification under previously awarded cost-plus-incentive-fee contract. It increases the estimated cost ceiling for the G/ATOR’s SDD phase, target cost, and target cost plus target fee of contract line item number 0001 by $17.5 million to reflect “undefinitized change orders for the UPX40,” which is an identification friend-or-foe (IFF) system. Work will be performed in Linthicum Heights, MD (75%), and Syracuse, NY (25%), and is expected to be complete on Sept 15/11. Contract funds will expire at the end of the current fiscal year.

That alternation also confirms a change in G/ATOR’s intended towing vehicle, from Humvee jeeps to up-armored MTVR medium trucks. Experiences in Iraq caused the Marines to re-think their intended use of Humvees, and their MTVR trucks with TAK-4 suspension for all-terrain mobility were the natural next step up. The change would improve the radar’s mobility and survivability, at the cost of added weight and limited helicopter portability. The radar module itself will remain helicopter-portable, but its accompanying vehicle will not be – unless the USMC decides to mount G/ATOR on a modified M-ATV MRAP, or future vehicles like the JLTV Category C.

Another contract modification increases the estimated cost ceiling, target cost and target cost plus target fee of contract line item number 0001 by an additional $27 million, to reflect the estimated cost increase associated with the 9-month schedule extension (M67854-07-C-2072).

New vehicle platform

Oct 6/09: More SDD. A $14 million modification under a previously awarded contract to increase the estimated cost ceiling for G/ATOR system development and demonstration to reflect its anticipated cost overrun. The contract modification was not competitively procured, as the cost overrun is within scope of the current contract, and is entered into pursuant to the changes clause. Discussions with US MARSYSCOM indicate that this increase is cumulative with the March 2009 ceiling increase.

Work will be performed in Linthicum Heights, MD (75%) and Syracuse, NY (25%), and is expected to be complete in September 2011. Contract funds will expire at the end of the current fiscal year (M67854-07-C-2072).

Oct 5/09: Testing. Northrop Grumman announces that a prototype G/ATOR partial array antenna has completed successful testing at a company antenna test range in Norwalk, CT. The partial array is now being integrated with additional radar subsystems for follow-on testing at Northrop Grumman’s Electronic Systems sector headquarters in Baltimore, MD. Meanwhile, a 2nd G/ATOR AESA is scheduled for testing at the Norwalk, CT test facility later in 2009.

The G/ATOR AESA array can be thought of as “networked mini-radars,” so meeting all test objectives with a partial array that includes transmit/receive functionality, hardware and software communications, array tuning, and calibration techniques gives Northrop Grumman a high degree of confidence that the first fully populated array (currently under integration/test) will likewise be a success. Northrop Grumman representatives told DID that some test objectives were exceeded, and all were met. They added that their goal was, and is, to field a test radar that is as close to Full Rate Production versions as possible, using the same people and processes.

FY 2006 – 2009

SDD re-award, after initial award canceled; Additional funds and cost overruns, incl. early finding for interaction design. G/ATOR concept
(click to view full)

March 3/09: More SDD. A maximum $40.5 million contract modification reflect the anticipated cost overrun associated with completion of the G/ATOR’s SDD phase. The contract modification was not competitively procured, as the cost overrun is designated as being within the scope of the current contract.

Northrop Grumman estimated an additional $36 million to complete the SDD phase, of which the Government is immediately funding $16.8 million to support contract requirements for completing the Critical Design Review (CDR) scheduled from March to mid-April 2009. In addition, the contract modification increases the contract value by $4.5 million for engineering services and support over the life of the contract through June 2012. Those engineering services will be requested on an as-needed basis, and the Government has begun by requesting $238,695.

Work will be performed by Northrop Grumman Corp., in Linthicum Heights, MD (69%), and by Northrop Grumman’s subcontract, Sensis in Syracuse, NY (31%). Of the total funds obligated with this contract modification so far, $120,215 will expire at the end of the current fiscal year (M67854-07-C-2072, P00024).

Dec 19/08: Sub-contractors. A $6.4 million modification to a previously awarded contract for Human Systems Integration (HSI) work, to be completed by June 2012. Work will be performed by Northrop Grumman Corporation in Linthicum Heights, MD (69%), and by their subcontractor Sensis, in Syracuse, NY (31%). The modification was not competitively procured, sine it’s classified as an engineering change within scope of the current contract (M67854-07-C-2072):

“The contractor shall develop and implement a plan to effectively apply HSI principles during G/ATOR design, production and integration. The contractor shall ensure Human Factors Engineering, Manpower, Personnel, Training, System Safety, Environment, Safety, and Occupational Health (ESOH), and Personnel Survivability requirements are incorporated into the layout, design, and arrangement of equipment having an operator or maintainer interface.”

As technology companies in Silicon Valley and beyond are beginning to realize, serious interaction design generally needs to begin earlier in the process. This is an improvement over the frequent practice of saving HSI for last, when it’s very difficult to change anything no matter what the findings show.

June 26/08: PDR. Northrop Grumman announces that G/ATOR has completed its 3 1/2 day Preliminary Design Review (PDR) at Northrop Grumman Corporation’s Electronic Systems sector headquarters, granting approval to proceed to critical design. The PDR involved an extensive U.S. government review and subsequent approval of the G/ATOR system and subsystem design for both hardware and software, including a program management review of cost and schedule.

The PDR was attended by more than 70 Marine Corps, Navy, Army, and other Department of Defense officials and civilian subject matter experts. NGC release.

PDR

June 17/08: More SDD. A $28.2 million modification to a previously awarded cost-plus-incentive-fee contract to extend the schedule by 8 1/2 months and increase the level of effort for G/ATOR system development and demonstration.

At this time, no additional funds are being committed, but the option is there if additional support and engineering effort is needed. Work will be performed in Linthicum Heights, MD (75%) and East Syracuse, NY (25%) and is expected to be complete December 2016 if all options are exercised (M67854-07-C-2072).

March 10/08: Sub-contractors. Curtiss-Wright Corporation announces a contract from Northrop Grumman to provide their new VPX boards and subsystems, high density digital signal processing products and optimized software tools.. The result will be a rugged air-flow-through radar processing subsystem using open architecture-based standards and software.

The initial $4.3 million contract is for development, which is expected to be complete in 2010. This subsystem will be designed and manufactured at Curtiss-Wright’s motion control facility in San Diego, CA, and will include products from its Leesburg, VA and Ottawa, Canada locations. The production phase of the G/ATOR program will be executed as an option under the current contract, and is planned to start in 2010.

Feb 27/08: No fries, chips. A $10.7 million modification to previously awarded cost-plus-incentive-fee contract for design and development of a new Serial Rapid I/O processor for the G/ATOR. Work will be performed in Linthicum Heights, MD (75%) and East Syracuse, NY (25%), and is expected to be complete March 2011 (M67854-07-C-2072).

Sept 6/07: SRR. Northrop Grumman Corporation and the U.S. Marine Corps (USMC) successfully reviewed and agreed upon 768 G/ATOR contractual design requirements during the recent System Requirements Review (SRR) held at Northrop Grumman’s Electronic Systems sector headquarters in Baltimore, MD. NGC release.

March 30/07: Northrop Grumman wins again, with a $256.6 million cost-plus-incentive-fee contract for System Development and Demonstration of the USMC’s Ground/Air Task Oriented Radar (G/ATOR), Increment I. The contract includes a Radar Environmental Simulator (RES); alternative generator; the G/ATOR Technical Data Package; Model Driven Architecture Models; interim contractor logistics support; and performance based logistics; Other direct costs and travel; and engineering services and support.

The Pentagon DefenseLINK’s announcement also cites production of 2 G/ATOR Low Rate Initial Production (LRIP) systems, and 13 full-rate production (FRP) G/ATOR systems. Northrop Grumman’s release cites 2 LRIP and 15 FRP systems. A 2012 change revised that to just 8 LRIP systems.

Work will be performed in Linthicum Heights, MD (75%) and East Syracuse, NY (25%) and is expected to be complete in March 2016, if all options are exercised. This contract is a result of a full and open competition solicitation available to industry via the Navy Electronic Commerce Office, with 5 offers received (M67854-07-C-2072).

Main System Development

Sept 16/05: Initial SDD. A $7.95 million cost-plus-incentive-fee contract for the Ground/Air Task Oriented Radar (G/ATOR) Increment I system development and demonstration. Work will be performed in Linthicum Heights, MD (75%) and East Syracuse, NY (25%) and is expected to be complete September 2009. The award is a result of a full and open competition solicitation that was available via the Internet, with 5 offers received (M67854-05-C-2000).

Northrop Grumman’s Sept 22/05 release estimated the total value of the contract at $125 million over 4 years and 4 system capability increments. It doesn’t matter, because the award is protested, and the Navy decides to re-compete it.

Canceled SDD

Additional Readings & Sources Background: AN/TPS-80 G/ATOR

DID thanks the personnel of Northrop Grumman for multiple interviews over the life of this article.

 

News & Views

 

Related Systems

  • DID – USA Developing New 3DELRR Long-Range Ground Radar. Northrop Grumman believes that a scaled-up version of G/ATOR would fit, but lost to Raytheon before submitting a GAO challenge.

  • Northrop Grumman – AN/APG-81 AESA Radar. Its technical design contributed to Northrop Grumman’s G/ATOR solution.

  • DID – TPQ-53 Counterfire Radars: Incoming…. Originally developed to track incoming artillery and rockets, and locate their source. It stemmed from a 2002 research effort whose scope was similar to G/ATOR’s, and the Army is now talking about extending the Lockheed Martin radar’s capabilities to include air defense. Other extensions may follow.

  • Saab – Giraffe 4X. Truck-mounted AESA radar for air defense and counterfire missions.

  • ThalesRaytheon – AN/MPQ-64F1 Improved Sentinel. Integrated into NASAMS/ SL-AMRAAM air defense systems, but they’ve developed an additional C-RAM counterfire mode.

  • US Marine Corps (July 3/07) – New radar system brings the fight back to terrorists. They’re talking about the 150 lb. Lightweight Counter-Mortar Radar deployed to Iraq and Afghanistan. Its convenient, tactically-useful size means that it may continue to exist alongside the vehicle-mounted G/ATOR Increment III, despite have some function overlap.

  • DID (July 20/06) – Germany Orders New AESA Battlefield Radars. Cover the German BUR system, which will be mounted on blast-resistant Dingo 2 vehicles.

Catégories: Defence`s Feeds

Taiwan’s Force Modernization: The American Side

ven, 02/09/2016 - 01:48

Despite China’s ominous military buildup across the strait, key weapons sales of P-3 maritime patrol aircraft, Patriot PAC-3 missiles, and diesel-electric submarines to Taiwan had been sabotaged by Taiwanese politics for years – in some cases, since 1997. The KMT party’s flip-flops and determined stalling tactics eventually created a crisis in US-Taiwan relations, which finally soured to the point that the USA refused a Taiwanese request for F-16C/D aircraft.

That seems to have brought things to a head. Most of the budget and political issues were eventually sorted out, and after a long delay, some major elements of Taiwan’s requested modernization program appear to be moving forward: P-3 maritime patrol aircraft, UH-60M helicopters, Patriot missile upgrades; and requests for AH-64D attack helicopters, E-2 Hawkeye AWACS planes, minehunting ships, and missiles for defense against aircraft, ships, and tanks. These are must-have capabilities when facing a Chinese government that has vowed to take the country by force, and which is building an extensive submarine fleet, a large array of ballistic missiles, an upgraded fighter fleet, and a number of amphibious-capable divisions. Chinese pressure continues to stall some of Taiwan’s most important upgrades, including diesel-electric submarines, and new American fighter jets. Meanwhile, other purchases from abroad continue.

Tracking the Programs: Patient Progress & Stalled Sales

Fortunately for Taiwan, there is movement beyond the stalled backwaters of F-16 and submarine sales. Can a combination of foreign weapon sales approvals and domestic efforts break Taiwan’s defense equipment logjam? Can the broader US-Taiwan defense relationship be saved, or is it eroding fatally?

Those are questions for the future. This Spotlight article will focus on the here-and-now instead, chronicling key developments and purchases as they arise.

Aerial Acquisitions

In the modern era, control of the air is the first requirement of effective defense. For an island country, control of the sea, or the ability to deny that control to enemies is equally strategic. Taiwan’s key modernization efforts in both areas remain troubled, which impairs the amount of real deterrence, and security, their military modernization can bring them.

ROCAF Mirage 2000-5
(click to view full)

The ultimate issue for Taiwan is one of numbers. In the air, quantity has a quality all its own. Taiwan expects to retire its F-5 and Mirage 2000v5 fighters by 2020. The ROCAF is moving to modernize its old F-16 fighters, but any fighter has a fixed airframe life, measured in flight hours. Modernization is a medium term solution, not a long term one, and does nothing to address the growing numeric imbalance across the strait. Even as US military studies suggest that the USAF and US Navy will find it more and more difficult to fly fighter reinforcements to Taiwan, and keep them in its airspace.

With 24 ROCAF F-16 fighters out of service for upgrades at any point, 16 in the USA for training at Luke AFB, and 30% of the remaining machines (32) unavailable for other maintenance, Taiwan’s fleet of 146 F-16s shrinks to about 74 F-16s in operational service. If equivalent rates hold true for the 71 locally built and upgraded F-CK-1C/Ds, that means about 50 operational Hsiung Ying fighters, for a total available fighter fleet of just 124 machines. Most of which will be 1980s level technology.

Consistent reports indicate that the USA has asked Taiwan to hold off on their request to add 66 new F-16s, in order to avoid a direct “no.” Reports suggest that a strong lobbying effort from China is dooming that effort, even as the PLAAF continues to add aircraft like the 4+ generation J-10, and equally advanced long-range SU-27 family fighters to its arsenal.

The Obama administration confirmed that perception in September 2011, when it opted to approve ROCAF F-16 fleet upgrades, rather than new F-16C/D Block 52 sales. They attempted to thread the needle by offering more advanced technology than the equipment in F-16 Block 52s, which have been sold to countries like China’s ally, Pakistan. The question is whether this is actually a worst-of-all-possible worlds outcome: showing weakness abroad on Taiwan, failing to extend the F-16 production line and American jobs at home, and offering cutting-edge technology that risks falling into the hands of Chinese intelligence.

The USA is also selling Taiwan the newest version of its attack helicopter, the AH-64E Apache Guardian. Its Longbow radar mast allows it to use radar guided, fire and forget missiles, and it also carries Stinger missiles for defense against enemy aircraft. Engine and communications upgrades, including the ability to control UAVs remotely, round out that package. The 30 Apaches would serve alongside Taiwan’s 60+ AH-1W Cobra attack helicopters, as a rapid reaction force able to counterattack beachheads and exploit the hilly island’s natural chokepoints.

Sea Control

At sea, the situation is simultaneously less overtly perilous, and less hopeful. China’s navy is certainly growing, but is not yet overwhelming. The problem is that without air superiority as cover, no Taiwanese surface navy can expect to survive, in order to maintain control of the seas around Taiwan. Britain faced the same equation in World War 2, and prevailed by winning in the air.

ROC Seadragon sub
(click to view full)

If that isn’t possible, a good submarine force is the classic military solution. Submarines are capable of either destroying efforts to cross the strait, or strangling Chinese trade as it moves through Southeast Asia’s key choke points. Modern missiles give them vastly longer offensive reach, and modern submarines are very difficult to find and target once they put to sea. For a nation like Taiwan, they’re the ultimate conventional deterrent against invasion.

Taiwan’s comprehensive failure to field this trump card stems even more directly from Chinese pressure. The USA approved a sale request in 2001, but they haven’t produced conventionally-powered subs for many decades, and don’t want to be the supplier. Without that option on tap, Chinese diplomacy has utterly strangled Taiwan’s efforts to find a party who is (a) able to make diesel-electric subs; and (b) is willing to sell them to Taiwan. The Republic of China currently relies on 2 submarines that are too old for anything but training missions, and 2 Hai Lung (Sea Dragon) class submarines. The Hai Lungs were ordered from the Dutch firm Rotterdamsche Droogdok Maatschappij (RDM) in 1981, as a derivative of their Zwaardvis (Swordfish) class. A follow-on order for 4 more submarines was blocked by the Dutch government in 1992 thanks to Chinese pressure, and RDM went out of business a few years later.

Since then, Taiwan has explored a number of alternatives to obtain diesel-electric submarines, without success. They are even reportedly considering building their own boats from foreign designs. Australia’s experience suggests that this course may be fraught with peril, and Taiwan has a number of technology gaps to address: ship design technology, torpedoes, sonar, propulsion systems, combat systems, and submarine periscope lenses. On the other hand, if the alternative is no submarines at all, and submarines are one of your most critical national defense needs, the perils of caution may outweigh the risks of inexperience. Taiwan seems determined to face the peril, and a report is expected by June 2014.

Land Defense CM11 tank
(click to view full)

Land defense improvements currently center on portable missiles, mobility, and massed counterattack against amphibious or paradropped beach-heads. The missiles provide dispersed, hard-to-target defenses against enemy aircraft and armored vehicles. Helicopter mobility allows rapid response to enemy airdrops or pre-positioned guerrilla units. Massed counterattack means the heavy armor of tanks, which remain the most important and element for crushing enemy beach-heads.

Taiwan’s situation with respect to tanks isn’t very good. The Republic of China Army currently fields about 480 M60A3 tanks acquired in the 1990s, but the M60 first entered US service in 1960, and the A3 version entered US service in the late 1970s. They’re joined by 450 much older CM11s (modified M48H 105mm turrets with improved fire control, mated to M60 hulls), and 300 of the M-48 medium tanks whose base design dates back to the 1950s: 50 M48A3s, and 250 CM12s (modified CM11 turrets mated to M48A3 hulls).

Contracts & Key Events Patriot Radar
(click to view full)

This article focuses on foreign imports, and the vast majority come from the USA. The US DSCA references to “the Taipei Economic and Cultural Representative Office in the United States” are diplo-speak for “Taiwan” or “Republic of China”. DID uses the conventional term instead. Note that DSCA requests are not contracts; those are separate announcements, and sometimes years pass between the two events. Having said this, a DSCA request does open the door to contracts as permitted weapons exports through the Foreign Military Sales process, unless Congress moves to block the proposed sale within 30 days.

Note that upgrades to the ROCAF’s locally-designed and built F-CK-1 fighters are covered in a separate article, as an Indigenous Taiwanese program that sits outside this article’s scope.

2014 – 2016

FFG 7

September 2/16: Sikorsky is to produce and deliver 24 UH-60M Black Hawk helicopters to Taiwan. The $135 million sale will see the aircraft uniquely configured for the Taiwanese government with delivery by October 2018. This follows a recent $158 million contract modification to produce 14 more Black Hawks for the US Army.

April 20/16: Taiwan is currently embarking on a project to develop its own indigenous fighter engine. Work is being undertaken by the country’s National Chung-Shan Institute of Science and Technology (NCSIST) and is seen as part of the incoming Democratic Progressive Party’s (DPP) push to prioritize Taiwan’s defense industry. The engines are being developed for locally produced jets such as the Indigenous Defense Fighter (IDF) and AT-3 trainers. While about 90% of the IDF and AT-3 are produced in Taiwan, some key technologies such as its engine is built in cooperation with foreign companies before the plane is assembled domestically.

March 3/16: Taiwan’s new government is keen on developing their own indigenous jet trainer aircraft to replace its AT-3s. The military fears however, that the Aerospace Industrial Development Corporation (AIDC) lacks the skills necessary for the development, alongside Taiwan’s inability to manufacture its own engines. The military may instead prefer the acquisition of the Alenia Aermacchi M346, with the AIDC participating in a 20% workshare of the project.

July 21/15: Lockheed Martin and Alenia Aermacchi have both responded to a Request for Information for Taiwan’s advanced jet trainer, according to Taiwanese media [Chinese]. The US company is expected to offer the T-50 Golden Eagle aircraft, in conjunction with South Korea’s Korea Aerospace Industries (KAI), whilst the Italian firm will likely push the M-346 AJT. Taiwan’s defense ministry is expected to make a decision regarding the purchase of new trainers to replace the current fleet of F-5E/F and AT-3 aircraft next year, with the winning aircraft design likely to be assembled in Taiwan by Aerospace Industrial Development Corp.

Dec 09/14: Frigates. Taiwan has a NT$5.5 billion ($176M) budget approved and ready to acquire 2 Perry-class frigates whose sale is well on its way to finally be approved by the US, after years of stalling (q.v. Sept 10/14). The US Senate approved S. 1683 on December 4, and since a similar bill (HR. 3470) had already been passed by the House in April, a reconciled law should be on the President’s desk soon.

China is not happy, but they’re making a lot of fuss for 2-4 weaponless ships that the US Navy gave up upgrading and Australia found tough to modernize.

Sources: Reuters: “Taiwan says to buy two U.S. frigates despite China anger” | Xinhua: “China firmly opposes US arms sale to Taiwan“.

P-3C arrives

Nov 3/14: Lockheed Martin in Fort Worth, TX receives a $271.8 million firm-fixed-price modification to install 142 F-16S aircraft upgrade kits. The total cost is, of course, much larger, since the kits must also be bought – which is at least a $1.85 billion proposition (q.v. Oct 1/12). Work will be performed in Taiwan, and is expected to be complete by May 31/22.

This award is the result of a sole-source acquisition. The USAF’s Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8615-12-C-6016, PO 0006).

F-16 upgrade installation

Oct 29/14: UH-60M. A Taiwanese Army official tells a legislative committee that UH-60Ms will begin to arrive soon, with the first 6 to arrive in mid-December 2014, and the rest of the 60 arriving in 6 more batches into 2018. Of the 60 UH-60Ms, 45 will be used by the Army, and the other 15 will be used for disaster relief by the Ministry of the Interior’s National Airborne Service Corps.

In other news, the 2 pilots who crashed their AH-64 onto a city roof are “still undergoing a series of flight tests before they can resume training missions.” Could be a while, guys. On the P-3 front, a flight simulation system has recently become operational in Taiwan to help train people for the sea control plane. Sources: Focus Taiwan, “Taiwan to take delivery of first batch of Black Hawks in December”.

UH-60 contract schedule

Oct 28/14: Minehunters. Italy’s Intermarine S.p.A. and Lockheed Martin win a contract to support local construction of 6 mine countermeasures vessels (q.v. Sept 5/12), which will be built at a brand-new Ching Fu Shipbuilding facility in Kaohsiung, Taiwan. The ships are expected to be about 52m long and 700t.

Intermarine will build the 1st hull at its shipyard near La Spezia, Italy, but Ching Fu will finish it and build the remaining 5 ships. Lockheed Martin’s role is focused on the combat system. Sources: Intermarine SpA, “Mine Countermeasure Vessels” | Defense News, “New Spanish Frigate Detailed, Deal for Taiwan Minesweepers Announced”.

6 minehunters

Oct 23/14: Jet Trainers. Defense Minister Yen Ming says that Taiwan wants to buy advanced trainers. Right now, the progression out of basic flight training goes from T-34 turboprops, to the AT-3 jet trainer, to the supersonic F-5E/F as a Lead-In Fighter Trainer. The T-34s will remain for now, but the AT-3s and F-5E/Fs would be retired.

The announcement comes right after a dual-crash of AT-3 jet trainers during a routine aerobatic training mission in Kaohsiung, southern Taiwan. Lt. Col. Chuang Pei-yuan was killed.

The question is which trainer will be available to Taiwan, given the likelihood of Chinese counter-pressure. The big 4 are Britain’s Hawks, Italy’s M-346 Master, Korea Aerospace/ Lockheed’s supersonic T-50 Golden Eagle family, and Russia’s Yak-130. Beyond, Czech firm Aero is releasing new L-159T and L-169 trainers, which can perform the same air policing and light attack roles as the Hawks, Yaks, and Golden Eagles; and Boeing & Saab are supposedly working on their own jet trainer offering. Since even Boeing & Lockheed have international partners, which of these countries will have the fortitude and willingness to offer them to Taiwan?

On the other hand, if Taiwan moves some of its indigenous F-CK-1 fighters into the F-5F’s LIFT role, their advanced AT-3 trainer replacement options would expand to include Brazil’s Super Tucano, Swiss Pilatus trainers, and Beechcraft’s T-6 family from the USA. Sources: Focus Taiwan, “Taiwan set to purchase advanced trainers in 2017: defense minister”.

Oct 19/14: Submarines. The Taiwanese submarine Hai Hu (Sea Tiger) launches a pair of UGM-84 Harpoon missiles, demonstrating a successful upgrade that vastly increases the submarine’s reach to over 100 nautical miles. Taiwan now employs all 3 types of Harpoon missile, launched from its frigates, F-16s, and submarines. Sources: Agence France Presse, “Taiwan tests submarine-launched missiles: report”.

Subs: Harpoon capability

Oct 19/14: AH-64E. Taiwan receives the last 6 helicopters, completing delivery of the 30 it ordered under the TWD 59.31 billion ($1.95 billion) contract. It now has 29 available for service (q.v. April 25/14). Sources: Focus Taiwan, “Taiwan takes final delivery of Apache helicopters”.

A-64Es all delivered

Oct 14/14: PATRIOT. Lockheed Martin Missiles and Fire Control in Grand Prairie, TX receives a $595.5 million foreign military sales contract modification, covering FY 2014 production for Kuwait, Taiwan, Qatar, and the UAE. They’re selling 152 PAC-3 cost reduction initiative missiles, 15 PAC-3 launcher modification kits, and the associated ground equipment, tooling, and initial spares. $543 million is committed immediately.

The PAC-3 CRI missile was used as the base for the PAC-3 MSE missile, but the MSE missile also added a number of new technologies, and changed the missile’s structure. In contrast, PAC-3 CRI missiles offer PAC-3 performance at a slightly lower cost.

Work will be performed in Grand Prairie, Lufkin, and El Paso, TX; Camden, AR; Chelmsford, MA; Ocala, FL; Huntsville, AL; and Anaheim, CA; and will continue until May 31/16. Army Contracting Command in Redstone Arsenal, AL (W31P4Q-14-C-0034, PO 0008).

PAC-3 missiles: Kuwait, Qatar, Taiwan, UAE

Sept 10/14: Frigates. Taiwan won’t get its 2 Oliver Hazard Perry Class frigates (q.v. Aug 5/10, April 22/12, Nov 13/13) on schedule, because the US Senate can’t be bothered to authorize the sale. That will keep 2 aging Know Class frigates in continued service until 2016. The Chinese-language United Daily News reported Tuesday that the frigates were expected to be delivered in 2016, under a project budgeted at NTD 5.56 billion ($185.42 million) in total.

Note that the frigates being decommissioned by the USA had all major weapons removed long ago, making them essentially large Coast Guard cutters with sonar and torpedoes. Source: Taiwan’s Want China Times, “Delivery of US Perry-class frigates to Taiwan could be delayed”.

Sept 10/14: Submarines. US CNO Admiral Jonathan Greenert confirmed that he had a conversation with Taiwanese officials during a recent visit, covering the sale or provision of submarines to Taiwan. Neither he nor the Taiwanese would talk about the content of that conversation.

The best case scenario would involve the USA transferring a few key technologies like periscope lenses, torpedoes, and combat systems, albeit at technology levels that don’t surpass what they believe China to have. That way, stolen technologies wouldn’t matter. The worst case scenario is that the issue was discussed, and Greenert explained why no help is likely.

The event was held by the Carnegie Endowment for International Peace, and focused on the US’s Asia Pacific rebalancing strategy. Sources: Taiwan’s Want China Times, “US chief of naval operation discusses sub deal with Taiwan”.

Sept 2/14: P-3Cs. Weapons for Taiwan’s P-3Cs become an issue:

“The Chinese-language China Times yesterday cited a recent report by the Control Yuan’s National Audit Office as saying that…. 12 P-3C Orion maritime surveillance aircraft from the US cost US$1.96 billion and are under the operational command of the Air Force 439 Composite Wing unit…. [but] the US disagreed with a plan to have the aircraft carry ordinances, such as mines and depth charges, made by Taiwanese manufacturers.”

Taiwan’s P-3s can carry Harpoon anti-ship missiles, but they really need modern torpedoes in order to engage enemy submarines successfully. Depth charges can be used against submarines, but their limit of 50m handicaps them. Meanwhile, mines would turn them into a potent blocking force if they can survive long enough over the Taiwan Strait. Taiwan has American Mk-46 lightweight torpedoes available for use aboard its destroyers and frigates, but until the P-3s are ready and able to deploy their own torpedoes, CNA News quotes a ROCAF commander who says that submarine contracts from Taiwan’s P-3s would be passed on a nearby ship. If there is one.

Aug 30/14: Tien Kung. Lin Yu-fang of the parliament’s defense committee says that Taiwan plans to spend TWD 74.8 billion (about $2.5 billion) from 2015 – 2024, buying the locally-made Tien Kung 3 (Sky Bow 3) medium range air defense missile system to replace the aging Hawk batteries, and defend the island against aircraft and cruise missiles.

That will make the Tien Kung 3 Taiwan’s lower-tier air defense counterpart to its new PATRIOT missiles, but the country denies that the Tien Kung 3 will be used to equip its 10,500t, American-built Kee Lung (Kidd) Class destroyers. Those ships will continue to rely on Raytheon’s SM-2 missiles for protection. Sources: Defense News, “Taiwan to spend $2.5 billion on anti-missile systems” | Taiwan’s Want China Times, “Taiwan denies Tien Kung missiles to be deployed on destroyers”.

Aug 20/14: AH-64E. Deliveries are a bit delayed. Taiwan is set to take delivery of 6 more AH-64E Apache attack helicopters in late August, which would bring their fleet to 23. This batch was supposed to arrive in May, and the delay is reportedly due to shipping issues. The final batch is now expected in October. Sources: Focus Taiwan, “Taiwan set to take August delivery of more Apache helicopters”.

Aug 20/14: F-16S: Lockheed Martin announces a successful Critical Design Review for integration of Northrop Grumman’s SABR radar in an F-16 (q.v. July 31/13). The SABR AESA radar will equip Taiwan’s F-16S upgrade, as well as Lockheed Martin’s global F-16V offering. Lockheed Martin is now describing Taiwan as the F-16V’s launch customer. Sources: Lockheed Martin, “F-16V Completes Major Capability Milestone”.

Aug 11-12/14: Fighters, incl. F-35B? Taiwan’s MND reaffirms its continued interest in F-16C/D or better fighters, while openly stating their goal to acquire F-35s at some point:

“Ministry of National Defense spokesman Maj. Gen. Luo Shou-he said Taiwan’s Air Force is ideally looking for aircraft with short-take off and vertical-landing capabilities and acknowledged that “it is our goal to acquire F-35s.” He admitted that it would be nearly impossible to obtain the fighters in the short term, “but we will continue to make effort on this issue.”

That seems to point clearly to F-35Bs, which make excellent sense when facing an opponent with thousands of runway-damaging ballistic missiles. The MND also denied China Times reports that the Mirage 2000-5 fleet was had maintenance issues because the French weren’t cooperating, leading to cannibalization of existing fighters. The MND said the fighters were being well-maintained by the French – the question is how much credence to give that assertion. Sources: Focus Taiwan, “Taiwan to seek U.S. sales of more advanced fighter jets: official” and “F-16C/D jet fighters still a consideration: Defense Ministry”.

July 15/14: Crash investigation. The AH-64E crash (q.v. April 25/14) is ruled as pilot error:

“The investigation report shows that the primary causes of the accident were the combination factors of human errors and environment,” Maj. Gen. Huang Kuo-ming told reporters.

The environment refers to fast descending clouds, which disoriented the pilots while they were flying at a low altitude. Still, they should have checked the instruments to maintain adequate height. Taiwan has received 18 of their 30 helicopters, though they only have 17 now. Sources: Defense News, “Pilots Blamed for Taiwan Apache Crash”.

June 3/14: Submarines. ROC Ministry of National Defense (MND) Navy Command Headquarters has confirmed that Taiwan will try to replace part of the pressure hull on one of its existing Tench/ Guppy-II Class submarines. The boats were modernized to Guppy II standards in 1949, and transferred to Taiwan without torpedo systems in 1973, for use in anti-submarine training. Once in Taiwan, they were renamed SS-791 Hai Shih (ex-Cutlass) and SS-792 Hai Pao (ex-Tusk). Attempts to restore their torpedo firing capability reportedly failed, leaving them as surveillance and training vessels only.

The first problem is that they’re the world’s oldest serving submarines. While their core diving mechanism is simple and reliable, their continued safety under the compressing water pressure of a dive is a concern. MND has said that China Shipbuilding Corp (CSBC) and the Ship and Ocean Industries Research and Development Center (SOIC) have been appointed to oversee replacement of SS-791 Hai Shih’s lower pressure hull, in an TWD 450 million (about $15 million) program that will take place at a Navy Maintenance Command dry dock. Some old piping may also be replaced.

SS-791’s problem is the entire pressure hull, and its external hull would still be 70 years old after the replacement. A mistake would kill the boat, and even success may not leave Taiwan with an operational training submarine. But perhaps that isn’t the point. This is a good initial step, if the goal is moving CSBC and SOIC toward the capabilities they need to build a design provided by the USA, or to lead a local project to reverse-engineer and build a new submarine. If an unsafe submarine is sacrificed in the process, that may be seen as an acceptable “last hurrah.” Sources: China Post, “Old Taiwanese submarine to get new pressure hull: MND” | Taipei Times 2007, “Feature: World’s longest-serving sub feted” | San Francisco Maritime National Park Association, “Museum documents an operating US, WW II built submarine in Taiwan”.

Crash

April 25/14: Crash. During a training exercise, a Taiwanese AH-64E crash-lands on the roof of a low-rise residential building in Taoyuan county. Guys, that’s not what we were supposed to be training today.

The Helicopter is a complete wreck, but the pilots suffer only minor injuries, and no residents are hurt. Sources: The Daily Mail, “How did they get out alive? Lucky escape for pilots of Apache attack helicopter after it crashes into a housing block in Taiwan” | South China Morning Post, “Two Taiwan pilots injured as Apache chopper crashes into building”.

AH-64E crash

April 10-14/14: Frigates. The US House of Representatives passes HR.3470, a bill authorizing the sale of 4 decommissioned US frigates to Taiwan. It also officially reaffirms US support for the Taiwan Relations Act, which has lately found itself honored mostly in the breach. The bill was passed by voice vote, so there are no exact totals. The next step is consideration by the US Senate, which requires cooperation from Senate Foreign Relations committee chair Bob Menendez [D-NJ].

Success would bypass the State Department’s DSCA and make the USS Taylor [FFG-50], USS Gary [FFG-51], USS Carr [FFG-52], and USS Elrod [FFG-55] available to Taiwan, though Defense Minister Yen Ming has said that Taiwan would only buy 2. Taiwan would also have to add weapons back if they want anti-aircraft or anti-ship capabilities. The frigates have some residual value as anti-submarine platform without that, but Chinese control of the air and prominent use of missile attack craft would give them very short lifespans unless these capabilities are restored in some way. Taiwan was happy for the gesture, while China followed with predictable staged theatrics. Sources: GovTrack on HR 3470 | The Diplomat, “US House Approves Frigate Sale to Taiwan” | Focus Taiwan, “Taiwan planning to buy two warships from U.S.: defense minister” | Reuters, “China angered by latest U.S. arms sale plan for Taiwan” | Taiwan Ministry of Foreign Affairs [in Chinese].

April 5/14: F-16. A CNA report says that the ROCAF will begin the process of upgrading its F-16 fleet in the second half of 2016, after the initial jets that are in the USA for compatibility testing etc. are finished. They don’t have an end date for the conversions yet. Sources: Taiwan’s Want China Times, “Taiwan air force to start upgrading F-16s from 2016”.

April 4/14: Submarines. So, good news?

“Minister of National Defense Yen Ming told a legislative committee that the United States “is willing to help us build the submarines together.”

The question is, what does that actually mean? the US hasn’t disavowed helping Taiwan acquire submarines over the past 8 years, they just haven’t done anything. Sources: Kyodo News International, “Washington agrees to help Taiwan build attack submarines”.

Feb 5/14: P-3s. Despite problems with the flight control systems in some recent deliveries (q.v. Jan 2/14), the ROCAF says that their overall delivery timetable will not be delayed, and could even be ahead of schedule. Sources: FOCUS Taiwan, “U.S. delivery of P-3C aircraft to Taiwan on schedule: military”.

Jan 27/14: F-16s. There are rumors that the USAF will remove the The Combat Avionics Programmed Extension Suite (CAPES) program from the 2015 budget request, in favor of a general F-16 service-life extension program (SLEP). We’ll know more in early March 2014. Taiwan was already complaining about having to pay most of the integration costs for the new configuration, but a USAF pullout would raise prices again. With the economy going soft, that could become a problem.

One option would be to make a troublesome switch from riding the USAF’s coat-tails and adopt the South Korean model for a BAE-led upgrade, which will integrate a different set of avionics that includes Raytheon’s RACR AESA radar instead of Northrop Grumman’s SABR AESA. Unfortunately, South Korea is still in the study phase, so even the ROKAF couldn’t tell Taiwan what’s involved in a switch. Singapore has also formally requested upgrades to its F-16 fleet, but the RSAF doesn’t seem to have decided on their exact configuration either, and their use of Israeli technology in some areas could be hard to duplicate.

Unless NGC strongly believes that Singapore will pick their SABR radar over Raytheon’s RACR, they’re the contractor with the most to lose if Taiwan’s upgrade fails. Can they deploy enough lobbying resources to keep CAPES, and hence their confirmed foothold in F-16 radar replacement? Stay tuned. Sources: Defense News, “F-16 Upgrade Dropped From US Budget Proposal, Sources Say”.

Jan 22/14: AH-64E. The China Post reports:

“The Army Aviation Special Forces Command yesterday said the grounding of the Apaches is set to be lifted in mid-February following the six-day Chinese New Year holiday that runs from Jan. 31 to Feb. 4, once they replace the main transmission boxes. So far, the command has received several batches of new main transmission boxes and has installed them in half of the 12 AH-64E Apache attack helicopters.”

A subsequent report moves that date back a bit. The groundings will be lifted during the week of Feb 10/14. Sources: Taiwan’s China Post, “Army to lift grounding order on Apache helicopters after CNY” | “Grounding order for Apache helicopters to be lifted next week”.

Jan 21/14: Size cuts. Taiwan’s Defence Minister Yen Ming (KMT Party) proposes to cut Taiwan’s military by 20%+, from a current size of 215,000 to 170,000 – 190,000. There doesn’t seem to be a firm plan, only vague statements that cuts would take place across all 3 services, “in stages contingent upon the government’s budgets, the acquisition of new weapons and demographic changes.”

The news report touts it as “the latest sign of warming ties with former rival China”, which would cast this as a foolish move. Before jumping on that, however, we’d refer readers to the demographic reference. There has been a small widening at the very bottom of Taiwan’s population pyramid lately, but the proportion of children aged 0-14 has dropped from a 1990 census of 26.9% to 15.65% in 2010. If you’re trying to recruit a military, that matters. As StrategyPage recently noted:

“Some Taiwanese politicians, desperate to find volunteers for the military have proposed that the descendants of Chinese soldiers who fled to northern Burma and Thailand after the communists won the Chinese Civil War in 1949, be granted Taiwanese citizenship if they join the Taiwanese Army…. Taiwan, like many other nations during the last two decades, is finding that moving from conscription to an all-volunteer military is not easy. For two years now the military has been only able to recruit 30 percent of the soldiers it needs to be all-volunteer by 2014.”

This issue isn’t specific to American equipment, of course, but it will affect those buys. Recruitment shortfalls usually indicate that the high-end of the recruiting pool is suffering the most – exactly the people who will be needed to operate and maintain advanced new equipment. Sources: Channel NewsAsia, “Taiwan to slash armed forces by up to 20 percent” | StrategyPage, “Attrition: Taiwan Wants To Recruit From The Lost Army”.

Jan 2/14: P-3Cs. Taiwan’s 2nd P-3C sea control aircraft arrived on Dec 12/13, but 2 more were still hung up in Guam by a malfunction in the flight control system. P-3C #3 received a fix and arrived on Dec 17/13, but #4 is still waiting in Guam as of this date.

Why the delay? No P-3C supply facility at the military base in Guam, and U.S. personnel on Christmas vacation. At least Taiwan isn’t paying for the repairs; since that’s true, we can also expect corrective action within the refurbishment process. The rest of the 2013 – 2015 delivery schedule remains intact (q.v. Oct 31/13), but Taiwan’s 40 year old fleet of 11 twin-engine S-2T Trackers won’t formally retire until 2017. Focus Taiwan, “Malfunction delays U.S. delivery of P-3C aircraft to Taiwan”.

Jan 2/13: AH-64Es. A 2nd batch of 6 attack helicopters arrives, but none of the new helicopters are cleared for flight yet. Taiwan has checked its own AH-64Es and found no obvious problems, but they’re still waiting for the US Army report that will clarify why the US AH-64E’s main transmission failed in December. Training will take place in simulators until then.

AH-64Es #13-18 will arrive in March 2014, #19-24 will arrive in May 2014, and #25-30 will arrive in July 2014. Sources: Focus Taiwan, “Taiwan to receive six more Apache choppers Thursday”.

2013

Long-range radar ready; National programs to develop a new fighter and a submarine gain traction; The real American problem with submarines for Taiwan. AH-64E
click for video

Dec 17/13: AH-64Es. Taiwan’s Army is notified of a main transmission failure in a US Army AH-64E attack helicopter. They respond by grounding all 6 Apache helicopters, pending a full investigation by the U.S. into the cause of the malfunction. Sources: Defense News, “Taiwan Grounds New US-Made Apache Helos Over Malfunction Fears” | Focus Taiwan, “Taiwan to receive six more Apache choppers Thursday”

AH-64Es grounded

Dec 17/13: BMD Radar. Raytheon IDS in Sudbury, MA, has been awarded a $6.9 million cost-plus-fixed-fee, firm-fixed-price, cost-reimbursement contract modification to create a testing environment related to the Taiwan Surveillance Radar program. The TSR is a huge, fixed radar installation based on an improved version of the PAVE PAWS system, used to track ballistic missiles thousands of kilometers away. Taiwan reportedly shares its data with the USA.

The technical term for this contract is “follow-on support string upgrade engineering change proposal.” In English, they’ll create a controlled site-like testing environment in the USA to test modifications, and perform system troubleshooting. You certainly don’t want to use the main radar for that. Work will be performed in Sudbury, MA and is expected to be complete by Nov 8/17. The USAF Life Cycle Management Center/HBNA at Hanscom AFB, MA manages the contract (FA8730-13-C-0003, PO 0005). The same contract was also posted on Dec 13/13.

Dec 9/13: Submarines. Taiwan’s United Daily News reports that defense minister Yen Ming and Navy Command Headquarters chief Adm. Chen Yung-kang are strong supporters of a made-in-Taiwan submarine program. Partisan wrangling over the USA’s request for a NT$ 10 billion “contract design fee” (about $340 million) is generally seen as the key obstacle to progress on the 2001 sale approval, but the report also cites:

“…the U.S. Navy’s reluctance to build diesel-electric submarines at a U.S. shipyard because it fears that Congress would ask it to buy the conventional submarines to save money if an American shipyard had the capability to build such a ship.”

Taiwan’s shipbuilding industry association is scheduled to come up with a comprehensive assessment report by June 2014, and the military is reportedly doing its own due diligence in parallel. This won’t be easy. Taiwan would need to update its ship design technology, and would neither either considerable help or external sources for torpedoes, sonar, propulsion systems, combat systems, and submarine periscope lenses. Sources: FOCUS Taiwan, “Talk of the Day — Taiwan thinking of building its own submarines”.

Nov 13/13: On the list. Submarines remain high on Taiwan’s agenda, but they aren’t the only items. The ROCN will replace 2 of its FF-1052 Knox Class anti-submarine frigates in 2014, using 2 refurbished FFG-7 Oliver Hazard Perry Class frigates. The rest may be replaced with local catamaran corvettes that have more of a surface warfare bent. The ROCN also seem to like the new minehunters, as they reportedly want to build some local MCM ships based loosely on their 2 new Ospreys. That’s a smart decision, and feasible for smaller shipyards.

Taiwan’s Marines reportedly want to buy another 48 AAV-7 amphibious personnel carriers, bringing their total fleet to 102 and allowing them to retire their ancient LVTP-5A1s.

The Air Force would like precision strike weapons, but if they’re thinking in terms of JDAM-type weapons, that won’t help them get inside Chinese air defenses. They’ll probably need to use their own weapons for that, and JDAMs are approved for export but the Air Force has delayed the purchase until 2014 or later. The ROCAF plans to go outside the USA entirely for its new jet trainer, but replacements for the AIDC AT-3 Tzu Chung have been canceled before. The last AT-3 was delivered in 1990, but South Korea’s T-50 family is reportedly quite tempting. China has been antagonizing South Korea lately, and a TA-50 sale would also provide Taiwan with a local interceptor and light attack jet. Sources: Defense News, “Taiwan Still Hungry for More US Arms”.

Nov 4/13: AH-64. Taiwan’s first 6 AH-64E attack helicopters have been re-assembled in Taiwan’s Kaohsiung Harbor, after arriving by ship. Four were flown to the Aviation and Special Forces Command in Tainan’s Guiren Township for initial flight testing, and the other 2 will arrive as part of the official ceremony on Nov 7/13. The US reportedly asked Taiwan’s military authorities not to reveal the AH-64E’s cockpit layout or configuration in its public display. If only it were that easy (q.v. Oct 28/13).

The helicopters will become operational in April 2014, with Guiren Air Force Base in Tainan serving as a training and basing focal point. More than 60 Taiwanese pilots and maintenance personnel returned to Taiwan in August 2013, after completed 20 months of training in the USA that will let them act as instructors. Still, there were limits, which echoed circumstances surrounding the delivery of Taiwan’s AH-1W Cobras over a decade ago:

“While Taiwanese pilots and maintenance personnel managed to get a full understanding of the aircraft software and hardware, the pilots were unable to obtain training in certain special flight skills. The Taiwanese trainees were asked to leave the classroom or training site whenever the American instructors were giving lectures on certain critical courses or special flight maneuvers, the officials said.”

They’ll have to figure those out on their own. A 2nd batch of Apache helicopters is scheduled for delivery in late December 2013, and 3 more batches of 6 will complete deliveries by the end of 2014. Sources: Focus Taiwan, “Taiwan takes delivery of first Apache choppers” | Focus Taiwan, “Talk of the Day — AH-64E Apache choppers debut in Taiwan” | Flight International, “Taiwan receives first batch of AH-64E Apaches” | Focus Taiwan, “Apache choppers to bolster Taiwan’s combat capability: expert”.

AH-64Es arrive

Oct 31/13: P-3Cs. President Ma Ying-jeou yesterday touted the P-3’s capabilities, during an official ceremony at Pingtung Air Base. The delivery schedule is supposed to fly in planes #2-4 by the end of 2013, planes #5-9 in 2014, and #10-12 in 2015, when the full P-3 squadron will be commissioned. Taiwan’s aged S-2Ts are scheduled to be decommissioned by 2017. Sources: Taipei Times, “President hails P-3C patrol aircraft”.

Oct 26/13: Espionage. Taiwan’s MND announces that a Major and 12 other officers are under investigation for selling details concerning Taiwan’s upgraded E-2C 2000 (aka. E-2K) AEW&C air surveillance planes. The last 2 planes only arrived in Taiwan on March 8/13.

E-2Ks aren’t the most modern version, but they are the most widespread type in the US Navy, so compromising their radar system or battle management system is a problem for the US Navy, as well as for Taiwan. National Party Rep. Ting Shou-chung acknowledged to Voice of America that this kind of leak could make the USA more reluctant to share advanced technology with Taiwan, but basically, it’s too late to fix the damage. Poor security has been a problem in Taiwan for some time now (q.v. Additional Readings). Even so, recent years have seen authorization and delivery of the USA’s most modern attack helicopters (AH-64E) and air defense missiles (PATRIOT PAC-3), a large ballistic missile defense radar, and some of America’s most modern AESA fighter radar technology for Taiwan’s F-16s. More significant technologies aren’t likely to be available to Taiwan anyway, the USA can’t take back what’s already given, and it’s more than unlikely that the USA would derail existing contracts. Sources: MND announcement [in Chinese] | Epoch Times, “Taiwanese Major Sells Military Secrets to China”.

Espionage: Hawkeye 2000 compromised

Sept 23/13: P-3Cs. Taiwan will be receiving its first P-3Cs at Pingtung AB within the next day or two, depending on Typhoon Usagi’s progress and course. Four of the 12 planes are expected by the end of 2013.

Subsequent reports indicate that the plane arrived on Sept 25/13. Sources: Taipei Times, “P-3C maritime patrol aircraft to arrive in Taiwan”.

Aug 8/13: AH-64E. Boeing in Mesa, AZ receives a $92.3 million firm-fixed-price contract modification, as part of Taiwan’s AH-64E buy and associated support. The Pentagon says that this brings the cumulative total face value of this contract to $716.7 million. The original DSCA request, including 30 helicopters, weapons and 6 years of support, had a maximum of $2.532 billion (q.v. Oct 3/08).

FY 2009 procurement funds are being used, which was the year Taiwan placed the order. US Army Contracting Command in Redstone Arsenal, AL acts as Taiwan’s agent (W58RGZ-09-C-0147, PO 0025).

SABR AESA
click for video

July 31/13: F-16s. Raytheon’s RACR AESA may have won the South Korean F-16 upgrade contract, but refits for Taiwan and the US military will use Northrop Grumman’s SABR instead. It will also become the standard radar for Lockheed Martin’s “F-16V” new-build/ upgrade offering, replacing Northrop Grumman’s own APG-80 AESA used in the F-16E/F.

The Taiwanese deal still needs a firm radar contract, but this is a 10-figure combined opportunity. It’s a huge win for Northrop Grumman, whose AESA radars also equip USAF F-22A (APG-77) and global F-35 family (APG-81) fighters. Northrop Grumman.

SABR AESA radar picked

July 28/13: Submarines. US Under Secretary of Defense James Miller responds to Rep. Robert Andrews’ [D-NJ] letter by repeating what we already know. Taiwan’s government approved full funding for an American study re: diesel submarine design and feasibility in 2008, but the State Department and Pentagon still haven’t agreed to conduct one.

He adds, disingenuously, that “Taiwan has not submitted any requests for technical assistance or export licensing support pertaining to a submarine program.” First, the State Department’s DSCA would have to allow such a request to go forward to the Pentagon. Second, export licensing support and technical assistance would have their parameters defined by a feasibility study. Taipei Times.

May 14/13: Support. Bell Helicopter Textron Inc. in Hurst, TX receives a maximum $85.4 million cost-plus-fixed-fee, foreign military sales (FMS) contract for engineering and technical support services to Iraq and Taiwan. Orders will be placed as required.

Iraq operates Bell IA-407s, and also has a handful of UH-1N twin-Hueys. Taiwan’s heliborne strike force currently relies on OH-58D Kiowa Warrior scouts and AH-1W Super Cobra attack helicopters, and a dwindling stock of aging single-engine UH-1H Hueys remains the backbone of their utility helicopter fleet. It’s reasonable to assume that most of these funds will be spent in Taiwan.

The bid was solicited through the Internet, with 1 bid received by US Army Contracting Command in Redstone Arsenal, AL (W58RGZ-13-D-0131).

April 25/13: PATRIOT PAC-3. Deputy Defense Minister Andrew Yang says that Taiwan has already deployed a PATRIOT PAC-3 battery in the north, which is ahead of the expected 2014 date. He adds that Taiwan will deploy the next 3 PAC-3 batteries in the south. Focus Taiwan.

April 24/13: AH-64. A $19.6 million firm-fixed-price contract modification, as part of Taiwan’s order for AH-64E helicopters and related support. The Pentagon says that this order brings the total cumulative face value of this contract to $624.4 million, of the maximum $2.532 billion noted in the October 2008 DSCA request. DID is having a hard time squaring that with known announcements.

Oddly, the Pentagon’s notice cites FY 2009 procurement contract funds as the source; presumably, they’re referencing Taiwan’s original order funding. The US Army Contracting Command in Redstone Arsenal, AL acts as Taiwan’s FMS agent (W58RGZ-09-C-0147, PO 0022).

April 9/13: Keep an eye out. It didn’t take long for Taiwan’s long range mountaintop radar in Hsinchu County to come in handy. The Americans have reportedly asked the ROCAF to strengthen radar sweeps toward Northeast Asia for possible missile launches, and relay surveillance information. The Hsinchu radar is in the BMEWS class, with the ability to detect and track ballistic missiles from a range of up to 5,000 km. China Post.

UH-60M OFT
(click to view full)

April 8/13: UH-60M. L-3 Link Simulation & Training announces a contract for 2 Taiwan Army UH-60M Operational Flight Trainers (OFTs). The contract is the result of a letter of agreement between the U.S. and the Taiwan Army, and is the 1st export of their UH-60M OFT. The 1st trainer will be operational at Shinshou Training Facility in Q4 2014, and the 2nd will follow in Q1 2015. A companion contract provides for 1 year of support, with a 1-year extension option. The US Army’s Program Executive Office for Simulation, Training and Instrumentation (PEO-STRI) will manage the purchase as Taiwan’s agent.

The OFTs are mostly similar to those used in the US Army’s Flight School XXI program. A 6-degree of freedom electric motion system is coupled with a supplemental motion system that simulates helicopter vibration. High-fidelity software is designed to accurately simulate each platform’s engine, electrical, hydraulic, navigation and communications systems, and even aircraft survivability equipment. It’s even compatible with night vision goggles. The big difference will be a Taiwan geo-database, for faithful reproduction of flights over their home terrain.

April 5/13: As the US DSCA submits South Korea’s request for stealth-enhanced F-15SE Strike Eagles and F-35A stealth fighters, US-Taiwan Business Council president Rupert Hammond-Chambers points to that process as a clear example of the political weakness in Washington. “The threats the [South] Korean air force face are the same as those of Taiwan’s air force,” and the argument that China could easily ground Taiwan’s F-16s by staging a massive missile attack on air bases applies equally to North and South Korea. Taipei Times | Read “Korea’s F-X Multi-Role Fighter Buys: Phases 2 & 3” for full coverage of South Korea’s fighter modernization.

March 13/13: Beyond F-16s. Citing a newly released quadrennial defense review, Taiwan’s media say that the ROCAF wants to step beyond their upgraded F-CK-1s, and develop a new fighter with features like lower radar cross-section, long-range, and aerial refueling receiver, as well as the ability to launch missiles against land targets or ships.

Taiwan’s military currently estimates that the fighter and small submarine development programs will cost about NT$500 billion (about $16.9 billion). Which means they’ll be lucky to keep the real total below $20 billion. Senior officials are also careful to add that they haven’t given up on getting more F-16s, which could squeeze development budgets for something new.

On the other hand, Liberty Times quotes KMT Legislator Lin Yu-fang statements that “For our national survival, we need to build up our defense capability under our own steam,” as a result of the USA’s increasing reluctance to assist Taiwan. Focus Taiwan.

March 13/13: Submarines. Taipei’s MND responds to reports that Taiwan has given up on buying new submarines abroad, by confirming that they’re “reviewing the relevant plans and budgets” for a 4-year local development project that was brought to the TWD 7 billion (about $236 million) National Defence Industrial Development Foundation in late 2012.

The ROCN actually foresees a budget closer to TWD 10 billion (about $340 million) to fund design, equipment acquisition, building industrial capability, and testing for a 1,000t – 2,000t submarine. Even that figure seems awfully low for a country that hasn’t built submarines before, and probably won’t be able to use an existing design as a base. Asia One.

March 8/13: E-2 AWACS. The last 2 upgraded Hawkeye 2000s arrive at Kaohsiung International Airport Station in southern Taiwan for follow-up tests and inspections (q.v. Nov 8/11 entry). This completes Taiwan’s E-2T Hawkeye upgrades, and restores its militarily critical AWACS fleet to full strength. Focus Taiwan.

All E-2 upgrades delivered

Feb 19/13: P-3s. StandardAero-San Antonio Inc. in San Antonio, TX receives a $10.6 million firm-fixed-price, indefinite-delivery/ indefinite-quantity contract modification, exercising an option for the overhaul of 16 T56-A-14 propulsion systems for the Government of Taiwan under the Foreign Military Sales Program.

That model of the T56 is unique to the P-3 family, and that number of engines would equip 4 refurbished P-3s. Or serve as fleet spares, which is more likely.

Work will be performed in San Antonio, TX and is expected to be complete in February 2014. All funds are committed immediately, and the US Naval Air Warfare Center Aircraft Division in Lakehurst, NJ manages the contract on behalf of its FMS client (N00019-09-D-0014).

Feb 8/13: P-3s. Lockheed Martin Mission Systems and Training in Owego, NY receives a $9.3 million firm-fixed-price contract modification to incorporate engineering change proposals (ECPs) in Taiwan’s 12 P-3 aircraft. Upgrades will improve both Harpoon Block II compatibility, and improved radar and signals emission location.

Specifically, the ECP implements the Complimentary Navigation Message, which updates RINU-G and Control Display Unit software with a message set that helps the radar/GPS guided Harpoon Block 2 Missile with precision targeting. They’ll also replace the standard AN/ALR-95 Electronic Support Measures system with the more advanced AN/ALR-97. The final modification upgrades technical publications to reflect the “Mode-T” software instead of the “Mode “4” software.

Work will be performed in Owego, NY (31%); Jacksonville, FL (18%); Van Nuys, CA (16%); Aberdeen, MD (14%); Cedar Rapids, IA (13%); McKinney, TX (3%); Marietta, GA (3%); and Woodland Hills, CA (2%), and is expected to be complete in February 2014. All Foreign Military Sales contract funds are committed immediately, and will be managed by the US Naval Air Warfare Center Aircraft Division in Lakehurst, NJ on behalf of their ROC client (N00019-09-C-0031).

Feb 1/13: Long-Range Radar. Agence France Presse reports that Taiwan’s US-made long-range early warning radar is now deployed near the northern county of Hsinchu, on its mountaintop perch. The NT$40.9 billion (about $1.35 billion at 2013 conversions) project loks similar to existing Pave Paws stations, and reportedly has a 5,000 km range. The added warning time for ballistic missile attacks is just minutes, but it matters a bit more when minutes were all you had before. The ability to add a bigger picture view on top of the short range PATRIOT radars is very important for national command and control.

As a bonus, the radar’s ability to see into Chinese airspace, and even to monitor North Korean launches, makes it an equally valuable asset to the USA. If Taiwan decides to share that data, which is a reasonable assumption, it becomes a more valuable ally. AFP.

SRP long-range radar deployed

2012

F-16 upgrade program begins; A domestic submarine program?; Budget for 4 frigates in 2013?; Stinger missiles; Harpoons prepped. F-16V
click for video

Oct 24/12: Planes? No tanks. Defense Minister Kao Hua-chu tells a legislative hearing that the cost of Taiwan’s F-16 upgrades is the reason for delays to tank purchases and self-propelled artillery upgrades. He adds that before requesting the 70-ton M1s, they would have to conduct a compatibility evaluation on the country’s infrastructure, such as roads, highways and bridges.

It’s certainly possible for large purchases to squeeze out less important items, within a defense budget. Then again, it’s also pretty common for a party that doesn’t really want to implement stronger defenses to use this sort of thing as an excuse to avoid doing what needs to be done. The KMT’s recent record makes it hard to tell which interpretation is the truth. Focus Taiwan.

Oct 1/12: F-16s. Lockheed Martin announces a contract valued at up to $1.85 billion to begin upgrading 145 ROCAF F-16A/B Block 20 fighters to the “F-16S” (not T?) configuration, including an Active Electronically Scanned Array (AESA) radar, embedded global positioning, electronic warfare upgrades, and other avionics improvements. Note Lockheed’s use of the word “begin”; the complete upgrade is very likely to cost more than $1.85 billion.

The F-16S upgrades will follow the Sept 21/11 DSCA request, which Lockheed Martin has firmed up into a global offering. The firm’s proposed F-16V was announced at Singapore’s airshow in February 2012.

Contract: F-16 upgrade

Sept 5/12: Minehunters. The ROCN plans to spend TWD $35.9 billion ($1.2 billion) to buy 6 domestically built minehunting ships over a 12-year period, but that budget has yet to obtain final legislative approval:

“Although information on the People’s Liberation Army Navy (PLAN) mine warfare capabilities remains sketchy, naval analysts, including James Bussert of the Naval Surface Warfare Center in Dahlgren, Virginia, believe each of the three PLAN fleets comprises one squadron of mine layers. The US Navy estimates the PLAN uses as many as 30 types of mines (including submarine-launched) and has an inventory of between 50,000 and 100,000…. Taiwan has strategic oil reserves of approximately 1.45 million kiloliters of crude, which would last the nation for about 30 days. Besides disrupting shipments of crude and natural gas, which could bring Taiwan to a standstill, the mining of Taiwanese harbors and waterways would severely undermine the confidence of global cargo fleets and thereby cause serious damage to Taiwan’s economy.”

The question is whether they will build their own design to accompany the new Osprey Class (q.v. Aug 2-10/12), or a foreign design. Sources: Taipei Times, “Taiwan plans to build six minehunting Navy ships”.

Aug 28/12: PATRIOT. The Taipei Times reports that new PATRIOT PAC-3 defense sites will begin construction in September 2012 around Greater Taichung and Greater Kaohsiung cities. A private contractor will handle the NT$ 61.4 million (about $2 million) contract, but the move has a significance that’s out of proportion to its size.

The PAC-3 systems would join Taiwan’s 3 upgraded PAC-2/ Config-3 units, currently deployed around the capital city of Taipei in Wanli, Nangang, and Sindian. The 4 new PAC-3 batteries from the October 2008 notification are reportedly being considered for a number of sites, including Greater Taichung’s Dadu Mountain, Greater Kaohsiung’s Jenwu District, Greater Tainan’s Hutoupi, protection for Taiwan’s E-2 2000 Hawkeye early-warning planes at Pingtung’s airport, and possibly the small airport terminal at Chiayi. About 386 missiles have been ordered so far, and the full PAC-3 systems are scheduled to arrive in 2014-2015. Another 2 PAC-3 batteries would follow under the 2010 DSCA request, as part of a future purchase phase.

Aug 2-10/12: Minehunters. Taiwan’s 2 Osprey Class minehunting ships arrive after their 2-year refurbishment and training period in the USA, and are inducted into the ROCN in welcoming ceremony at the Zuoying naval base, in the southern port city of Kaohsiung.

Taiwan’s fleet of minehunters now numbers 10 ships, but these are by far the newest and most capable. Designed in the 1990s instead of the 1950s, Osprey Class ships are equipped with an array of mine-hunting devices including Raytheon AN/SQQ-32 sonar, remotely-operated AN/SLQ-48 Mine Neutralizing Vehicles (MNV), video sensors, remotely-controlled mine detonators, cable cutters, and a pair of .50 caliber machineguns. The minehunters have a cruising speed of 10 knots, and mission endurance of 15 days. China Post | Taiwan Today | Defense Update.

2 Minehunters arrive

Aug 3/12: P-3s. The good news is, a Taiwanese P-3C Orion aircraft recently completed its 1st functional trial flight in late July 2012, and Taiwan should begin receiving its new P-3C sea control aircraft in 2013. The bad news is, the military’s plan to build a hangar at an air base in Pingtung County in southern Taiwan has gone nowhere.

The ROCAF says that the new planes could be placed in C-130H hangars, but that isn’t a long-term solution. The problem appears to be lack of jurisdictional clarity between the ROCAF and Navy over who will control the planes, and hence who will issue the RFP. Focus Taiwan.

July 24/12: Tanks. The Taipei Times reports that Taiwan is looking to join countries like Morocco, and try to obtain refurbished M1 Abrams tanks. The tanks used in Iraq and Afghanistan need major maintenance overhauls, and one option for the Army would be to sell the tanks to allies, and let them pay for the RESET costs.

“Ministry of National Defense spokesman Major General David Lo… told local media yesterday that efforts to acquire used battle tanks from the US were currently under evaluation… Deputy Minister of National Defense Chao Shih-chang… [said] the Army was seeking to procure 200 tanks to bolster its forces, adding that the great bulk would be deployed in Hukou Township… [with] the 584th Armored Brigade… Taiwan’s efforts to procure the 70-tonne main battle tank go back to the early 2000s, when it requested M1-A2s from the US, a request that Washington turned down.”

July 13-22/12: Upgrade MoU signed. Reports indicate that the US and Taiwan have signed the $3.7 billion MoU to upgrade Taiwan’s F-16s, with upgrades occurring at a rate of 24 fighters out of service at a time, beginning in 2016 and continuing to 2028. The actual Letter of Acceptance (contract) is expected to be finalized within a couple of months, but it has a number of reported twists and conditions that are puzzling.

One of the oddest is that Taiwan will have no say in which radar (Northrop Grumman SABR or Raytheon RACR) is picked in 2013-2014, and then installed. Meanwhile, Lockheed Martin’s recent agreement with state-run AIDC appears to have shut BAE out of the picture, without the opportunity to compete or be evaluated.

Another odds proviso is that Taiwan won’t recover it’s engineering costs to integrate the new AESA radars, if the US Air National Guard adopts the same radar and methods to retrofit its own F-16s. Taiwanese sources told Defense News that the MoU allows “some” reimbursement if other F-16 customers adopt the same retrofit. The most likely near-term customers are Korea and Singapore. AIDC [in Chinese] | Defense News | Defense Update | Reuters India (abridged) | Reuters, via Aviation Week.

July 11/12: LMCO-AIDC MoU. At the 2012 Farnborough Air Show, Taiwan’s AIDC and Lockheed Martin sign a memorandum of understanding to expand their strategic relationship, and jointly explore opportunities for the Taiwan F-16 A/B Retrofit Program.

The MOU defines potential collaboration on F-16 retrofit modifications, F-16 component parts manufacture and other potential offset projects. Its practical effect is to shut BAE Systems out of any competition (vid. March 14/12 entry). Lockheed Martin | Reuters.

F-16 upgrade MoU

June 25/12: F-16s. Reports from Taiwan indicate that the Ministry of National Defense is giving the USA’s May 2012 draft Letter of Acceptance for F-16 modernization some hard thought, as it screens the items and prices in the USA’s rumored $3.8 billion response. A decision is expected by the end of July.

The United Evening News reports that the $600 million cost for the AESA radars in particular has created unease among “senior government officials,” who are reportedly asking for other options. There’s certainly precedent for installing previous-generation APG-68v9 radars in early-model F-16s instead, as is being done for Pakistan. It would be a major improvement on Taiwan’s current radars, and equal other F-16C/D Block 52 fleets around the world, but would remain a generation behind AESA performance. Both Raytheon and Northrop Grumman are touting their RACR/SABR next-generation radars as drop-in refits for older F-16s, but Taiwan is being told that additional system engineering work would be required. The Pentagon has reportedly promised to remit some of those custom design costs, if other countries choose to add AESA radar systems to their F-16A/Bs in the future. The China Post | Focus Taiwan | Agence France-Presse.

May 29/12: AH-64 helicopters. Boeing in Mesa, AZ received a $97.3 million firm-fixed-price contract modification “of an existing contract to procure Block III Apache AH-64D attack helicopters in support of Foreign Military Sales.” Which means Taiwan. Work will be performed in Mesa, AZ, with an estimated completion date of Dec 30/17. One bid was solicited, with 1 bid received by the U.S. Army Contracting Command in Redstone Arsenal, AL (W58RGZ-09-C-0147).

This brings total ROC Apache Block III contracts to $683.8 million so far, of the maximum $2.532 billion noted in the October 2008 DSCA request. This current total includes equipment like fire control radars and air-launched Stinger missiles, which were part of that request.

May 17/12: Minesweepers. Taiwan’s CNA reports that the former USS Oriole and USS Falcon Osprey Class coastal minehunting ships are scheduled for delivery to Taiwan in July after being refitted and reactivated. They are due to be commissioned into service in October 2012.

May 17/12: F-16s. The US House of Representatives approves Rep. Kay Granger’s [R-TX-12] amendment to the 2013 National Defense Authorization Act (H.R. 4310), which requires the Obama administration to approve the sale of 66 new F-16s to Taiwan. It’s 1 of 19 amendments that passes on a voice vote, before the House passes HR 4310.

Granger’s amendment is companion legislation to her House Bill (H.R. 2992) that “Directs the President to carry out the sale of no fewer than 66 F-16C/D multirole fighter aircraft to Taiwan”, and to Sens. Cornyn and Menendez’ Taiwan Airpower Modernization Act of 2011 (S.1539). Unless the Senate also passes a similar amendment to the 2013 budget, however, it won’t matter. Neither HR 2992 nor S 1539 has passed individually, and the final 2013 defense budget needs to pass both the House and the Senate with the same text. The wording is also somewhat questionable, as the President isn’t really the decider, and can always offer the excuse that the State Department never forwarded a request. Which is true – the State Department is blocking that request. Forcing approval of that request, either by State’s DSCA or via legislation removing this request from DSCA’s hands, might have been a better tactic. Rep. Granger | The Hill.

May 6/12: UH-60Ms. Sikorsky Aircraft Corp. in Stratford, CT received a $43.2 million firm-fixed-price contract for engineering services, to convert 4 more UH-60M Black Hawk helicopters “to the specific unique configuration for Taiwan.” In other words, to finish the 4 helicopters bought on June 30/11. This brings the total cost of those 4 helicopters to $91.8 million, or $23 million per machine so far.

Work will be performed in Stratford, CT, with an estimated completion date of Oct 31/14. One bid was solicited, with 1 bid received by Taiwan’s FMS agent, the US Army Contracting Command in Redstone Arsenal, AL (W58RGZ-08-C-0003).

4 UH-60Ms

May 2/12: Link-16. Data Link Solutions in Cedar Rapids, IA receives a $9.4 million firm-fixed-price delivery order to Taiwan of MIDS-LVT terminals, as a Foreign Military Sale transaction.

Work will be performed in Wayne, NJ (50%), and Cedar Rapids, IA (50%), and is expected to be complete by Dec 31/14. This contract was competitively procured via FBO.gov and the SPAWAR E-commerce website, with 2 offers received. The competition was real, as Taiwan has shifted its buys back and forth over time. US Space and Naval Warfare Systems Command in San Diego, CA manages the contract, on behalf of its FMS client (N00039-10-D-0031).

April 27/12: F-16s. Sen. John Cornyn [R-TX] has lifted his hold on the confirmation of former Obama aide Mark W. Lippert, as Assistant Secretary of Defense for Asian and Pacific Security Affairs. It comes after Obama’s Director of the Office of Legislative Affairs, Robert L. Nabors II, sends a letter that promises to consider sales of new F-16s to Taiwan. Careful reading shows that this is all it promises, and Obama’s former aide will play a large role in any decisions. Unless there’s another reason to believe in a policy about-face, therefore, it’s unreasonable to expect any change, despite this language:

“We understand your desire to see Taiwan’s air force modernized with the addition of new F-16C/Ds… especially given the pending retirement of F-5s… [The new ASD] would use the position as the U.S. Chair of the U.S.-Taiwan Defense Review Talks and the interagency Monterey Talks to oversee the development of a combined review of Taiwan’s long-term defense strategy and resourcing plan, to include on Taiwan’s air and missile defense needs… We recognize that China has 2,300 operational combat aircraft, while our democratic partner Taiwan has only 490… The Assistant Secretary, in consultation with the inter-agency and the Congress, will play a lead role as the Administration decides on a near-term course of action on how to address Taiwan’s fighter gap, including through the sale to Taiwan of an undetermined number of new U .S.-made fighter aircraft.”

April 22/12: More frigates? Media reports say that Taiwan may look to increase its fleet of FFG-7 Oliver Hazard Perry Class frigates from the current set of 8. The defence ministry has reportedly briefed President Ma Ying-jeou, and is said to be ready to include a budget for 4 more in 2013.

These frigates are generally sold for very little money, except the cost of refurbishment. Taiwan’s FFG-7 frigates are fully armed, and include the original pop-up launcher for SM-1 air defense and Harpoon ship attack missiles. The US Navy has removed missiles from its own frigates, however, so adding them back would be part of the refurbishment contract, if Taiwan wants that. Bangkok Post. See also Aug 5/10, Jan 10/10.

March 20/12: Cracked AMRAAMs. The Taipei Times reports that the ROCAF currently has 120 AIM-120C-5 and 218 AIM-120C-7s in inventory, with deliveries that began in 2004. Unfortunately, some of them were experiencing cracking in their pyroceramic radome nose cones. American investigators concluded that Taiwan’s high humidity, plus the pressure created by supersonic flight, were the problem. The ROCAF will respond by improving storage and rotation cycles.

The Taipei Times does note that Taiwan’s radar-guided MBDA MICA and locally-built Tien Chien II missiles aren’t having this problem, despite being exposed to the same conditions.

March 14/12: F-16s. Lockheed Martin and BAE are both pushing to perform Taiwan’s F-16 upgrades, as part of a wider competition in this area between the 2 firms. BAE’s recent wins in providing fire-control and advanced ethernet capabilities for 270 US ANG F-16s, and upgrades for some Turkish F-16s, sends notice that Lockheed can expect competition in Taiwan, South Korea (up to $1.6 billion for 134 KF-16s), and Singapore (70 F-16C/Ds).

Taiwan will be a challenge for BAE, because its armed forces and government have a long-standing relationship with Lockheed Martin that they may be loath to jeopardize. Defense Update.

March 13/12: Thai Submarines. Thailand has dropped plans to buy 4 second-hand German U206A submarines, and let their option rights expire on Feb 29/12. Reports say that Thai Defence Minister Sukumpol Suwanatat refused to approve the deal, after several reviews of the navy’s submarine purchase plans.

The tiny 550t submarines are especially well-suited for shallow, constricted waters and near-coast operations. They’re old, but they’d fit Taiwan’s needs extremely well, offering a bridge buy whose layout and plans would also help teach Taiwanese designers. Or, the stealthy, shallow-water U206s may find another global buyer who values their unique specialties, and has a near-term need. Colombia has already bought 2 of the 6 submarines available. Europe Online.

Feb 27/12: Submarines. Taiwan’s Ministry of National Defense officially denies a magazine report saying that Taiwan was going to buy Greece’s U214 Papanikolis Class submarines, since Greece couldn’t pay.

The Hong Kong-based Chinese-language magazine, Asian Week (probably “Yazhou Zhoukan”), added that HDW officials has visited Taiwan in October 2011, and been told that a deal was possible for under $800 million each, plus 10-20 years guaranteed support, and US approval. The report added that HDW had officially informed the US about the proposal. Taipei Times.

UGM-84 Harpoon
(click to view full)

Feb 22/12: Harpoons for subs. Modernizations will allow Taiwan’s navy to arm its 2 submarines with UGM-84 Harpoon missiles, beginning in 2013. The move will greatly increase their submarines’ reach, allowing attacks from up to 70 miles away. That makes it much harder for enemies to protect themselves against a submarine attack, by widening the required search field.

Taiwan already equips its F-16s and some navy ships with other variants of this missile, but a submarine’s stealth adds a new level of difficulty for Taiwan’s enemies. Local reports indicate that integration will involve the addition of a stand-alone fire-control system for the missiles, to avoid the added time and expense of full integration. It will also require either changes to the torpedo tube mechanisms, or conversion/addition of a dedicated torpedo tube. For tactical reasons, it’s much better to have all torpedo tubes missile-capable, as this allows fast salvos of multiple missiles. Since firing a missile announces the submarine’s presence and location rather loudly, attacks on well-defended naval groups (like, say, an invasion force) will be much more effective as a missile swarm, rather than using the classic kung-fu movie approach where the attackers conveniently fight the defender one at a time. If, indeed, the submarine lives long enough to keep launching more attacks. See also July 29/10 entry. Taipei Times | 9abc | India’s Zee News.

Sub modernization

Feb 21/12: Submarines. The Taipei Times reports confirmations from the ROC Navy that it will begin a domestic submarine program in 2013, with “assistance from one or a number of foreign countries”, in order to create a small 1,000t – 1,500t design. The goal is reportedly to deliver a prototype within 3-4 years, and the ROCN would reportedly seek budgets for the program within 2 months.

Semi-native sub program?

Feb 13/12: PATRIOT. The USA’s FY 2013 budget documents include information about Taiwan’s PATRIOT PAC-3 missile orders. Looking through past years as well, one sees 386 PAC-3 missiles ordered from FY 2010-2013: 96 in FY 2010, 96 in FY 2011, 154 in FY 2012, and 40 missiles for FY 2013.

Feb 7/12: Minesweepers. An article about the Iranian mine threat to the Strait of Hormuz notes that the former US Navy Osprey Class minehunting ships Oriole and Falcon have been authorized for sale to Taiwan (vid. Jan 29/10 entry), but are still being refurbished in Texas.

Jan 5/12: Stingers. Raytheon Missile Systems in Tucson, AA receives a $7.8 million firm-fixed-price contract, to buy FIM-92H Block 1 Stinger missiles for Taiwan. The designation FIM-92H refers to FIM-92D missiles, which have been upgraded to the current FIM-92 RMP Block I standard. They can be used with air-to-air launchers on helicopters, or they can equip troops on the ground.

Work will be performed in Tucson, AZ, with an estimated completion date of Dec 31/16. One bid was solicited, with one bid received by Taiwan’s contract agents at US Army Contracting Command in Redstone Arsenal, AL (W31P4Q-09-C-0520).

2011

$5.3b F-16 upgrade program; Taiwan is a security risk for secrets; Political dogfight over F-16s in USA; Taiwan to try building submarines itself?; Major PATRIOT missile buy; AH-64D Block III attack helicopter buys; Upgraded E-2 surveillance planes returning; 1st 4 UH-60M helis ordered; Plans for new torpedoes. ROCAF F-16A Block 20
fires AGM-65 Maverick
(click to view larger)

Dec 30/11: PATRIOT. Raytheon Integrated Defense Systems in Andover, MA receives a $34.3 million firm-fixed-price contract, providing initial funding for 3 Taiwanese Patriot fire units and training equipment. DID is investigating possible connections to the Dec 16/11 announcement.

Work will be performed in several locations within Alabama, Arizona, California, Connecticut, Florida, Georgia, Illinois, Indiana, Maryland, Massachusetts, Minnesota, Missouri, New Hampshire, New Jersey, New York, North Carolina, Ohio, Oklahoma, Pennsylvania, Rhode Island, Utah, Washington, Italy, Greece, and Canada, with an estimated completion date of Dec. 31, 2016. One bid was solicited, with one bid received. US Army Contracting Command in Redstone Arsenal, AL manages the contract, incl. services as Taiwan’s agent (W31P4Q-12-C-0069).

Dec 30/11: PATRIOT. Lockheed Martin in Grand Prairie, TX receives a $606 million firm-fixed-price and cost-plus-fixed-fee contract for FY 2012 PATRIOT requirements – which includes missiles, launchers, and ground support for Taiwan. Within the PATRIOT system, Lockheed Martin produces the PAC-3 missile, the missile canister 4-packs, a fire solution computer, and the Enhanced Launcher Electronics System (ELES).

Work will be performed in Grand Prairie, TX; Camden, AR; Lufkin, TX; Chelmsford, MA and Ocala, FL, with an estimated completion date of July 30/15. One bid was solicited, with one bid received by US Army Contracting Command, Redstone Arsenal, AL manages the contract, as Taiwan’s FMS agent (W31P4Q-12-C-0002).

Dec 30/11: AH-64D. Longbow Limited Liability Corp. in Orlando, FL receives an announced $64.3 million firm-fixed-price contract modification, but Longbow LLC pegs its actual value at $181 million, with options to extend performance past 2015, to 2017.

It’s said to include 15 Longbow Block III Fire Control Radar assemblies for Taiwan’s AH-64Ds, marking the Block III version’s 1st export order.

For the US Army, the order includes 14 Block III Radar Electronics Units, which are smaller then their predecessors, and offer lower weight, maintenance and power requirements. The Army is also buying 14 Unmanned Aerial System Tactical Common Data Link Assembly (UTA) systems and spares, which provide a 2-way, high-bandwidth data link that lets the helicopter crew control nearby UAV flight paths, sensors and lasers at long ranges, while receiving high-quality imagery from the UAVs on the helicopters’ own displays.

Work will be performed in Orlando, FL, with an estimated completion date of Sept 30/15. One bid was solicited, with 1 bid received by US Army Contracting Command in Redstone Arsenal, AL manages the contract, including its work as Taiwan’s FMS agent (W58RGZ-10-C-0005). Lockheed Martin | Northrop Grumman.

Dec 30/11: AH-64D. Raytheon Missile Systems in Tucson, AZ receives a $13.9 million firm-fixed-price contract modification to fund FIM-92H Block-1 Stinger missiles and their air-to-air launchers for Taiwan. China’s near-certain air superiority in the event of a conflict makes aerial combat weapons for Taiwan’s attack helicopters a smart move. Their maneuverability and near-earth flight profile would make them a very difficult foe for many fast jets.

Taiwan’s DSCA request was for up to 173 missiles, which will be used on its AH-64 helicopters (q.v. Oct 3/08 entry). A $45.4 million contract has already ordered 171 of the missiles, plus ancillary equipment that included 24 of 35 requested Stinger Captive Flight Trainers with live guidance systems, but no rocket motors (q.v. June 25/09).

Work will be performed in Tucson, AZ, with an estimated completion date of Dec 31/16. One bid was solicited, with one bid received. US Army Contracting Command in Redstone Arsenal, AL manages the contract, as Taiwan’s FMS agent (W31P4Q-09-C-0520).

Dec 27/11: E-2s. Northrop Grumman Systems Corp. in Bethpage, NY receives a $6.9 million delivery order modification exercising an option for sustainment, engineering and technical services, and travel in support of ROCAF E-2Cs.

Work will be performed in Bethpage, NY (70%), and Pingtung Air Force Base, Taiwan (30%), and is expected to be completed in January 2013. The US Naval Air Warfare Center Aircraft Division in Patuxent River, MD manages the contract on behalf of its FMS client.

Dec 19/11: E-2s. Taiwan gets 2 of its E-2Ts back as Hawkeye 2000s. The arrival of the 2 planes in Kaohsiung city brings their fleet size back to 4, with 2 more still in the USA for upgrades. Taiwan News.

Dec 16/11: PATRIOT. Raytheon announces a $685.7 million Foreign Military Sales (FMS) contract from Taiwan for additional PATRIOT fire units, featuring current electronics, an improved man-machine interface, and claims of lower life-cycle costs. The firm adds that this award is in addition to the 2009 contract for new systems, and the 2008 contracts to upgrade Taiwan’s existing systems. Work under this contract will be performed at Raytheon’s Integrated Air Defense Center in Andover, MA; El Paso, TX; and Huntsville, AL.

When queried, the firm clarified that this order will be built from the ground up as PATRIOT PAC-3, and that “fire unit” means the complete system, including radars, generators, antenna, ECS command module, and missile launchers. Taiwan is already beginning to build experience with the equipment, as Raytheon recently delivered the first upgraded Configuration-3 radar system, 10 months ahead of the original requested program plan. See also Taipei Times.

Major PATRIOT contract

Dec 15/11: Submarines. More reports that Taiwan is moving toward its own submarine program, per the Sept 19/11 entry below. The story adds one expert’s recommendation that the money and time might be spent on fast-attack missile boats like the Chinese Type 022. Which would be a good recommendation, if standard combat scenarios weren’t assuming PLAAF control of the air over the Formosa Straits.

The Taipei Times also reports that Taiwan turned down a proposed 2003 deal to buy up to 8 Sauro Class boats from Italy as they were decommissioned. The Fincantieri submarines had entered service between 1980 and 1992, which means they would have had limited remaining service life, and Taiwan decided that it was better not to buy them. Unfortunately, no deal for new submarines turned up.

Dec 7/11: AH-64 helicopters. Boeing in Mesa, AZ received a $141.3 million firm-fixed-price contract for “services in support of 30 Apache AH-64D attack helicopters for Taiwan.” See also the June 10/11 and Oct 8/10 entries for that order.

Work will be performed in Mesa, AZ, with an estimated completion date of Dec 30/17. One bid was solicited, with one bid received by the U.S. Army Contracting Command in Redstone Arsenal, AL, who is acting as Taiwan’s agent (W58RGZ-09-C-0147).

Dec 7/11: BMD Radar. Raytheon Integrated Defense Systems in Sudbury, MA receives a $42.9 million cost-plus-fixed-fee and firm-fixed-price contract for the Surveillance Radar Program. Specifically, this system includes a UHF phased array radar integrated with Taiwan-furnished Identification Friend-or-Foe beacons; 2 Missile Warning Centers; and communications and interface architecture and protocols to specific nodes within Taiwan’s military communications infrastructure, consistent with US restrictions

The SRP is a Foreign Military Sales Program managed by the USAF Electronic Systems Center at Hanscom AFB, MA, to provide Taiwan with the elements of a missile and air defense capability. Work will be performed in Sudbury, MA, and is expected to be complete by Nov 9/12 (FA8722-05-C-0001, PO 0062).

Dec 7/11: PATRIOT. Raytheon in Andover, MA received a $12.7 million firm-fixed-price, cost-plus-fixed-fee, and cost-reimbursable contract. The award will modify an existing contract for technical services in support of Taiwan’s PATRIOT air defense missile system.

Work will be performed in El Paso, TX, and Taipei, Taiwan, with an estimated completion date of Dec 31/15. by the U.S. Army Contracting Command in Redstone Arsenal, AL, who is acting as Taiwan’s agent (W31P4Q-11-C-0317).

Nov 8/11: E-2s. Taiwan ships its 3rd and 4th E-2T Hawkeyes to the USA for upgrades to Hawkeye 2000 configuration (vid. Oct 3/08 entry). The move leaves Taiwan without any operational E-2Ts, as the first 2 planes aren’t expected to return from their upgrades until the end of 2011.

In their absence, the ROCAF does have 2 newer E-2C+ Hawkeye 2000s to rely on, but the move remains a calculated risk. Taiwan News.

Oct 5/11: PATRIOT. Raytheon IDS in Andover, MA receives a $20.4 million firm-fixed-price and cost-plus-fixed-fee contract, to provide PATRIOT technical assistance services to Taiwan. Work will be performed in El Paso, TX; Taipei, Taiwan, and Andover, MA; with an estimated completion date of Dec 31/15. One bid was solicited, with 1 bid received (W31P4Q-11-C-0317).

Nov 18/11: F-16 dogfight. Sen. John Cornyn [R-TX] sends a letter to President Obama, that also clarifies Taiwan’s current position re: the F-16s:

“Shortly after your Administration announced the F-16 A/B upgrade package, I wrote to President Ma to ask him for clarification on Taiwan’s military requirement for new F-16C/Ds. On Oct. 14, I received an unequivocal response, stating that Taiwan needs both the upgraded F-16A/Bs and the new F-16C/Ds to fulfill its “self-defense needs in qualitative and quantitative terms.” The sale of new F-16C/Ds to Taiwan also has the backing of 47 Democrats and Republicans in the Senate and 181 Democrats and Republicans in the House of Representatives who this past year have sent letters of support to your Administration. In your recent speech to the Australian Parliament, you stated that “The United States is a Pacific power, and we are here to stay.” I applaud this rhetoric, but it will ring hollow unless it is followed by meaningful action…”

Nov 14/11: A day after the New York Times publishes an editorial urging President Obama to sell out Taiwan, Rep. Ed Royce [R-CA-40] tells a Formosa Foundation group in Los Angeles that Congress is not contemplating abandonment. That may seem like harsh language, but the New York Times op-ed reads:

“President Obama… should enter into closed-door negotiations with Chinese leaders to write off the $1.14 trillion of American debt currently held by China in exchange for a deal to end American military assistance and arms sales to Taiwan and terminate the current United States-Taiwan defense arrangement by 2015.”

“Sell out” is a perfectly appropriate description. New York Times | Taipei Times.

Pakistani F-16D-52
(click to view full)

Sept 21/11: F-16 Block… 59s? The US DSCA issues up to $5.95 billion in ROCAF F-16 related upgrade and support requests, over 3 separate notifications. The procedure for Foreign Military Sale mode requests is that if Congress doesn’t block the sale within 30 days, negotiations and contracts can commence. The US military is technically the buyer and contract manager, but they do so on behalf of their FMS client. The exact DSCA requests include:

Pilot Training: Many foreign militaries train their combat pilots in the USA, taking advantage of America’s larger swathes of open airspace for training, and of training alongside combat-proven American pilots. Taiwan already trains its F-16 pilots at Luke AFB near Glendale, AZ, and a buy request worth up to $500 million would continue funding this program over the long term.

The training provides a “capstone” course that takes experienced pilots and significantly improves their tactical proficiency. Funding would cover flight training, supply and maintenance support, spare and repair parts, support equipment, program management, publications, documentation, personnel training and training equipment, fuel and fueling services, and other related program requirements.

L-3 Communications Corporation in Greenville, TX would be the lead contractor for this service, but there would be about 90 U.S. contractors providing various forms of aircraft maintenance and logistics support at Luke AFB. US DSCA [PDF].

Spare Parts: This Foreign Military Sales Order II program (FMSO II) request would provide funds for blanket spare parts orders, under the Cooperative Logistics Supply Agreement (CLSSA), to support Taiwan’s F-16A/B Falcon, F-5E/F Tiger II, and F-CK IDF Ching Kuo fighters, and C-130H Hercules transport aircraft. The estimated cost is up to $52 million.

Procurement of these items will be from many contractors providing similar items to the U.S. forces, and implementation of this sale will not require the assignment of any additional U.S. Government or contractor representatives. US DSCA [PDF].

RACR retrofit
(click to view full)

F-16 Fleet Retrofit: This request [PDF] would retrofit up to 145 F-16A/B Block 20 fighters. The technologies involved in some aspects of this retrofit are something of a surprise, as they go beyond the new F-16C/D Block 52 aircraft Taiwan was said to be looking for – a type that was recently sold to China’s ally Pakistan. These retrofits are more advanced than that, rising to a technology level that would be ahead of any F-16 the USAF flies, and similar to (but not the same as) the UAE’s unique F-16E/F Block 60 Desert Falcons.

The estimated cost is up to $5.3 billion. The most advanced gear includes:

  • 176 Active Electronically Scanned Array (AESA) radars. The only F-16s currently flying with AESA radars are the UAE’s F-16E/Fs, which carry Northrop Grumman’s AN/APG-80. Northrop Grumman (SABR) and Raytheon (RACR) are both offering AESA radars that retrofit into the same nose space as the original F-16 radars, while offering 2x-3x performance improvements over even the Block 52’s AN/APG-68v9 radar. Despite their retrofit target market, a sale would hand over some of America’s most advanced fighter radar technologies, derived from platforms like the Navy Super Hornets’ APG-79 (RACR) and the F-35’s APG-81 (SABR).

  • 176 Electronic Warfare Management systems, incl. possible upgrades to 82 ALQ-184 Electronic Countermeasures (ECM) pods to incorporate Digital Radio Frequency Memory (DRFM) technology; and/or 176 of Terma’s AN/ALQ-213 EWMS; or ITT’s new AN/ALQ-211v9 AIDEWS(Airborne Integrated Defensive Electronic Warfare Suite) pods with DRFM; or Northrop Grumman’s AN/ALQ-131 pods with DRFM. DFRM is a major step-change in EW effectiveness. It can do more things at once, do them faster, and is easier to modify with new programming. F-16 sales to Pakistan pointedly specified solutions without DFRM.

  • HAVE GLASS II application. This is a special coating that reduces the plane’s radar reflectivity. Recent F-16 sales to Pakistan did not include this technology.

Other performance improvements would involve:

  • Engineering and design study on replacing existing F100-PW-220 engines with F100-PW-229 IPE engines, designed for longer life and improved performance.

  • 128 Night Vision Goggles

  • 176 Embedded Global Positioning System Inertial Navigation Systems

  • Upgrade of 158 BAE APX-113 Advanced Identification Friend or Foe Combined Interrogator Transponders. These are the “bird slicers” just ahead of the cockpit.

To improve the plane’s offensive performance, especially in ground strike mode, Taiwan wants the following ancillary equipment and weapons:

  • 128 of VSI’s Joint Helmet Mounted Cueing Systems. These Helmet Mounted Displays track the pilot’s head movements, and make a huge difference when using “high off boresight” missiles like the AIM-9X, which has a wide sighting cone.

  • 40 Raytheon AIM-9X Sidewinder short range air-to-air missiles. By comparison, recent F-16 Block 52 sales to Pakistan pointedly specified previous-generation AIM-9M missiles.
  • 56 AIM-9X Captive Air Training Missiles, with no motor or warhead
  • 5 AIM-9X Telemetry kits, with a working motor, but telemetry instead of a warhead
  • 153 LAU-129 Launchers with missile interface, which can fire AIM-9X Sidewinder or medium range AIM-120 AMRAAM missiles

  • 16 GBU-31v1 Joint Direct Attack Munition (JDAM) GPS-guidance kits for existing 2,000 pound bombs.
  • 80 GBU-38 JDAM kits for existing 500 pound bombs.

  • 64 CBU-105 Sensor Fused Weapons with Wind-Corrected Munition Dispensers (WCMD). These are GPS-guided cluster bombs, whose tuna-can shaped submunitions spin out to hunt and destroy enemy vehicles and tanks over a wide area.

  • 112 Dual Mode/ Global Positioning System Laser-Guided Bombs, either Raytheon’s Enhanced Paveway, or Boeing’s Laser JDAM.
  • 16 x 2,000 pound: GBU-10 Enhanced Paveway II or GBU-56 Laser JDAM
  • 16 x 2,000 pound: GBU-24 Enhanced Paveway IIIs, with longer glide range and “bunker buster” penetrator warheads
  • 80 x 500 pound: GBU-12 Enhanced Paveway II or GBU-54 Laser JDAM

  • 86 tactical data link terminals; especially useful for ground support strikes

  • Upgrade 28 of Lockheed Martin’s electro-optical infrared targeting Sharpshooter pods.

  • Buy another 26 of Lockheed Martin’s AN/AAQ-33 Sniper or Northrop Grumman’s AN/AAQ-28 LITENING targeting & surveillance pods. The most current SE variants of these pods offer major advances in performance; the question is whether Taiwan would get those.

Also included in the buy request: More 20mm ammunition, alternate mission equipment, update of Modular Mission Computers, new cockpit multifunction displays, communication equipment, Joint Mission Planning Systems, maintenance, construction, repair and return, aircraft tanker support, aircraft ferry services, aircraft and ground support equipment, spare and repair parts, publications and technical documentation, personnel training and training equipment, and other forms of U.S. Government and contractor support.

F-16 manufacturer Lockheed Martin Aeronautics Company in Fort Worth, TX would be the prime contractor, but additional contracts could include:

  • BAE Advance Systems Greenland, NY
  • Boeing Integrated Defense Systems in St Louis, MO
  • Goodrich ISR Systems in Danbury, CT
  • ITT Defense Electronics and Services in McLean, VA
  • ITT Integrated Structures in North Amityville, NY
  • ITT Night Vision in Roanoke, VA
  • L3 Communications in Arlington, TX
  • Lockheed Martin Missile and Fire Control in Dallas, TX
  • Lockheed Martin Simulation, Training, and Support in Fort Worth, TX
  • Marvin Engineering Company in Inglewood, CA
  • Northrop-Grumman Electro-Optical Systems in Garland, TX
  • Northrop-Grumman Electronic Systems in Baltimore, MD
  • Pratt & Whitney in East Hartford, CT
  • Raytheon Company in Goleta, CA
  • Raytheon Space and Airborne Systems in El Segundo, CA
  • Raytheon Missile System in Tucson, AZ
  • Symetrics Industries in Melbourne, FL
  • Terma in Denmark

Taiwanese sources state that these buys would be paid for over a period of 10-12 years, once contracts are negotiated. Implementation of this sale will require at least 5 contractor representatives for engineering and technical support, over the first 2 years of the program. Another 2 trips per year will be required for U.S. Government personnel and contractor representatives for the duration of the program, for program and technical support. See also: Focus Taiwan | Bloomberg | Reuters.

Sept 21/11: Reactions Sen. John Cornyn [R-TX] is among those who remain unimpressed by the upgrade offer. He has added a Senate rider that incorporates the language of his “Taiwan Airpower Modernization Act” (vid. Sept 12/11), as an amendment to H.R. 2832, the House Trade Adjustment Assistance bill that’s now making its way through Senate concurrence. The core of his disagreement is that upgrades don’t meet Taiwan’s request, and confirm Chinese influence on weapon sales that violates of the 1979 Taiwan Relations Act. This also seems to be the widespread perception in Taiwan, though the KMT is defending the deal as expected.

Upgrades also won’t keep the F-16 production line rolling in Cornyn’s state past mid-2013, whereas a 66-plane order would add several years of continuation for about 2,000 jobs.

Cornyn’s amendment fails in the Senate. On the other hand, Rep. Kay Granger, [R-TX-12, which is Fort Worth] has introduced an S.1539 companion bill in the Republican-controlled House. If it passes there, it could find itself back in the Senate as a stand-alone bill. See also Focus Taiwan re: Taiwanese politics | Sen. Cornyn statement | Rep. Granger statement | Rep. Duncan Hunter [R-CA] op-ed | US-Taiwan Business Council [PDF] | Associated Press | Breitbart Big Peace op-ed re: security issues | Houston Chronicle | Miami Herald | Fort Worth Telegram Sky Talk re: House bill | WSJ Washington Wire || Special addition: FP magazine offers Taiwanese YouTube editorial animation videos.

DSCA: F-16 upgrade request

GR9 in Afghanistan w.
Sniper, Paveways
(click to view full)

Sept 19/11: Fighter Plan B – Go VTOL/STOVL! The Washington Times reports that a U.S. Defense Department study has concluded Taiwan’s best response to the threat of massive Chinese missile strikes against its airfields, is by buying short-takeoff and vertical-landing jets such as the V/STOL(Vertical/ Short Take Off and Landing) AV-8B Harrier II, or the new F-35B Lightning II STOVL(Short Take-Off, Vertical Landing capability) model. Read “Plan B: A V/STOVL Fighter for Taiwan?” for the full analysis and report.

Sept 19/11: Submarines. Focus Taiwan reports that Taiwan is considering building its own diesel-electric attack submarines:

“The military has commissioned a local shipbuilder to contact a non-U.S. country capable of building submarines for cooperation in building conventional submarines… sources said the Naval Shipbuilding Development Center has been very busy studying the blueprint of the country’s two… submarines… Moreover, naval authorities are preparing to send personnel abroad to study production technology or negotiate technology transfers for building pressure-resistant hulls, the most difficult part in submarine production, the sources said. Initially, the military may start from building small submarines weighing in the hundreds of deadweight tonnages.”

Maybe they can get a real deal from Germany for its 500t U-206As?

Sept 14/11: F-16 dogfight. Foreign Policy magazine reports that Sen. John Cornyn will not stall Senate confirmation of Ashton Carter as the Deputy Secretary of Defense. That kerfuffle had nothing to do with the Taiwanese sale; instead it involves assurances of Carter’s full support for the F-35 program, which faces strong budget pressures, and is assembled in Fort worth, TX.

Sept 12/11: F-16 dogfight. Amid rumors that the Obama administration will refuse Taiwan’s F-16 request, Sens. John Cornyn [R-TX] and Robert Menendez [D-NJ], introduce S.1539, The Taiwan Airpower Modernization Act of 2011. It would remove the decision from the administration’s hands, and force the USA to approve the sale of 66 new F-16s to Taiwan. This would not force a sale itself, of course, since Taiwan must choose to buy. But it would remove all approval road blocks.

The bill’s co-sponsors include Sens. Richard Blumenthal [D-CT] and Joe Lieberman [I-CT], Sens. Tom Coburn and James Inhofe [both R-OK], and Jon Kyl [R-AZ]. It has been referred to the Senate Committee on Foreign Relations, who must then approve it for submission to the Senate. GovTrack for S.1539 | Bloomberg | Fort Worth Star-Telegram | Texas Insider.

Aug 30/11: Security Sieve. The Wall St. Journal publishes Taiwan is Losing the Spying Game, by Taipei Times deputy news chief and Jane’s Defence Weekly correspondent J. Michael Cole. Key excerpt:

“…another factor may be at work: the penetration of almost every sector of Taiwanese society by Chinese intelligence. For the U.S. government and defense manufacturers, any arms sale to Taiwan carries the risk that sensitive military technology will end up in Beijing… Anyone who has followed developments in Taiwan over the years knows how deeply Chinese forces have infiltrated Taiwan’s military, especially its senior officers… Taiwan’s reputation has not been helped by a string of embarrassing cases involving members of the armed forces or civilians who spied for China… Even more damaging are the instances when culprits got away with a light sentence… Whether warranted or not, Taiwan is increasingly perceived as leaking secrets like a sieve.”

Taiwanese leaks

August 17/11: F-16 dogfight. According to the Taipei Times, President Ma Ying-jeou said the island was still seeking to acquire F-16C/Ds while the Ministry of National Defense denied having been notified by Washington officials of a refusal to proceed with the sale. The US State Department is saying no decision has been made yet. Vice President Joe Biden was in China until yesterday but this issue was not on the agenda, according to the Washington Times.

August 14/11: F-16 dogfight. No sale? That’s what Republic of China MND officials say that a US DoD delegation told them at the Taipei Aerospace and Defense Technology Exhibition. This would confirm reports from June 2011, though the decision remains to be officially confirmed by US sources – something expected to happen by October 1st. In an interview with Defense News, deputy defense minister Andrew Yang said just last week:

“If we don’t get the F-16C/Ds to replace our vintage fighters, then we lose our leverage and immediately face the challenge of fulfilling our responsibility of preserving peace and stability in the region. [..] Otherwise, the U.S. has to send its own military to replace our daily patrols in the region.”

Instead, retrofits on older F-16A/Bs are being offered, reportedly including ASEA radars, targeting pods and other upgrades. After all, even the USAF is considering upgrading its F-16 fleet to guarantee a smooth bridge until it has enough F-35s. Whether all, or only some, of the 146 jets would be upgraded appears to still be up in the air. AviationWeek | DefenseNews | Taipei Times.

July 14/11: F-16 dogfight. The US State Department is trying to convince Sen. John Cornyn [R-TX] to lift his hold on the nomination of Bill Burns as deputy secretary of state. Cornyn is demanding that the administration (and the State Department, who handles formal sales requests) clarify its policy on Taiwan arms sales first. Foreign Policy magazine.

June 30/11: UH-60s. A $48.6 million firm-fixed-price contract for 4 “green” (basic) Black Hawk helicopters and government-furnished equipment to contractor-furnished equipment in support of Foreign Military Sales to Taiwan. Work will be performed in Startford, CT, with an estimated completion date of May 30/13. One bid was solicited, with one bid received (W58RGZ-08-C-0003).

A series of queries that ended up with the US Army have confirmed that these are UH-60Ms, and are just the basic airframes plus installation. That still leaves key items like engines (which will be installed, but are bought separately), defensive systems, training, and spares to be handled by other contracts, and leaves the prospect of modifications by the receiving country for that country to address. This is also the pattern used by Sweden’s recent CSAR/MEDEVAC buy. Note that there is a larger Taiwanese UH-60M request outstanding (vid. Jan 29/10 entry).

June 27/11: F-16 dogfight. Defense News reports that Taiwan’s June 24 petition to submit a letter of request (LoR) for new F-16 fighter jets was blocked by the U.S. State Department, under orders from the U.S. National Security Council.

Current US laws require Taiwan’s defense needs to be the sole criterion for judging military sales requests. This request could be worth more than $8.5 billion, and would extend the F-16 production line for several more years beyond its current planned closure, in 2013.

June 14/11: The Taipei Times reports that:

“A senior military official who requested anonymity said the Ministry of National Defense had been forced to return NT$1 billion (US$34 million) allotted for military equipment purchases to the national treasury because Washington was stalling on a decision to sell the submarine plans and F-16C/D aircraft long requested by Taipei… starting next year, it would only allocate the “lowest operational necessity” costs for the potential purchase of the submarine plans and F-16C/Ds, the official said, adding that the funding would very likely be lowered to about US$10 million and become symbolic funding rather than actual funding. This does not mean that the Republic of China government has grown pessimistic about or is no longer interested in acquiring the F-16C/Ds and submarine plans from the US, the official said…”

June 10/11: AH-64s? Reports surface that Taiwan has signed a contract for 30 AH-64D Apache Longbow Block III attack helicopters under its Sky Eagle program, making it the type’s 1st export customer.

Per earlier contracts & requests, Taiwanese AH-64s will include Hellfire Longbow fire-and-forget light strike missiles and Stinger anti-aircraft missiles among its weapon options. In exercises, helicopters have proven to be very challenging opponents for fixed-wing aircraft, and the growing aerial imbalance over the China Strait makes some form of aerial engagement capability a necessity for any Taiwanese attack helicopter. The Dec 3/08 DSCA entry set a maximum estimated price of $2.532 billion for 30 helicopters, all associated equipment and initial support, and requested stocks of Stinger and Hellfire Longbow missiles.

US Army AH-64 project manager Col. Shane Openshaw is quoted as the source for the news, and says that Taiwan’s helicopters will be delivered from 2012-2013. The contract signing is consistent with April 2011 reports, and this will be treated as the full contract signing – but see also April 12/11, Oct 8/10, July 26/10, April 12/10, June 25/09, and Oct 3/08 entries, plus Flight International | Rotorhub | Asian Skies blog.

AH-64E attack helicopter order

May 26/11: F-16s 45 American Senators (out of 100) write to President Obama, supporting Taiwan’s request to buy 66 F-16C/D Block 50/52 fighters, in order to help keep pace with China’s buildup. Its authors include Senate Taiwan Caucus heads Robert Menendez (D-NJ) and James Inhofe (R-OK), as well as Senate China Working Group leaders Mark Kirk (R-IL) and Joe Lieberman (I-CT). Expressed concerns include both the imbalance created by China’s buildup of advanced fighters, and the economic benefits of the F-16 production line. The President is expected to ignore the letter, however, and the US State Department continues to stall the necessary approvals for the request to go forward. Full text [PDF] | Foreign Policy magazine | Flight International.

May 24/11: Harpoons for subs. US FBO.gov discusses the ongoing effort to arm Taiwan’s 2 submarines with Harpoon missiles:

“The Naval Air Systems Command, Precision Strike Weapons – PMA-201, intends to award a sole source contract to The Boeing Company, St. Louis, MO, for the acquisition of Encapsulated (ENCAP) Harpoon Certification Training Vehicle (EHCTV) Servicing Site and Weapons Station (WS) Support Equipment (SE) in support of the Taiwan Navy ENCAP Harpoon program. It is anticipated that a Firm Fixed Price (FFP) delivery order against Blanket Ordering Agreement N00019-11-G-0001 will be issued. This acquisition is being pursued on a sole source basis under the statutory 10 U.S.C. 2304(c)(1), as implemented by Federal Acquisition Regulation (FAR) 6.302-1, only one responsible source and no other supplies or services will satisfy agency requirements. It is anticipated that a Firm-Fixed Price type contract will be issued. THIS NOTICE IS NOT A REQUEST FOR COMPETITIVE PROPOSALS.”

May 23/11: Submarines. Taiwan’s government denies that it has backed off of its program to buy 8 diesel-electric submarines, amidst reports that the program has been scaled down to 4 boats. The USA agreed to the 8-boat sale in 2001.

Nevertheless, the main problem remains, no matter how many are ordered. Despite policy papers from think-tanks like the neo-conservative AEI, The USA doesn’t produce diesel-electric submarines, and the countries who do make them have been too intimidated by Chinese threats of trade retaliation to supply them. Asia Times believes the rumors may be a political ploy by the Ma KMT government, which sees its support slipping before the 2012 elections and knows that defense is a weak issue. Floating the rumor and then responding looks like action, though it changes nothing. Iran’s Press TV | Asia Times.

May 16/11: Torpedoes. Taiwan’s military reportedly plans to budget $860 million to purchase new Mk54 and Mk48 torpedoes over the a 10-year period.

$300 million will reportedly be used to buy 600 Mk54 lightweight torpedoes, replacing existing Mk46s. They’re designed to launch for ships, and from aircraft like Taiwan’s incoming P-3C Orion sea control planes.

Another $160 million will be spent on the purchase of 40 Mk48s, replacing the existing German-made SUT heavyweight torpedoes Taiwan acquired with its 2 Hai Lung II (Zvaardis) Class subs built by the Netherlands. Another $400 million would cover 100 Mk48s, if Taiwan finds a way to source and purchase the 8 diesel-electric submarines it wants. See also July 20/10 entry, Focus Taiwan.

May 10/11: Defense committee member Rep. Lin Yu-fang [Nationalist Party] is quoted as saying that Taiwan intends to push back the due date for buying Patriot missiles from 2014 to 2017, and postpone buying Black Hawk helicopters from 2016 to 2019-2020. He says that those monies will be spent instead on the transition and recruitment costs associated with scrapping conscription, and fielding an all-volunteer force by 2015.

Defense Ministry spokesman Luo Shou-he cited the reason as production delays by U.S. defense contractors, but the contractors don’t seem to think so. Agence France Presse, via My Sinchew | AP, via Washington Post.

April 12/11: Defense News reports that representatives from the U.S. government and Boeing will arrive in Taipei in May 2011, to wrap up the AH-64 Block III Foreign Military Sale deal. Author Wendell Minnick.

March 23/11: P-3 MPA. CAE announces a series of military contracts in more than 10 countries valued at approximately C$ 100 million, including a contract to build P-3C training devices for the Taiwan Navy. They’ll design and manufacture a P-3C Level D operational flight trainer (OFT) as well as a P-3C operational tactics trainer (OTT) for the P-3’s sensor operators. Both training devices will be delivered to Taiwan in 2014.

Feb 17/11: AMRAAM missiles. Focus Taiwan covers a ROCAF report on the May 2010 AMRAAM International Users’ Conference, in which the USAF’s 649th Armament Systems Squadron raised the issue of “Diminishing Manufacturing Sources and Material Shortages (DMSMS).” In English, that means people who manufacture some parts of the missile are either going out of business or ceasing production. The 649th ARSS said component shortages could begin as soon as 2012, and recommends that countries revise their AMRAAM support contracts to include maintenance and warranty clauses.

The longer term hope is to issue contracts for Raytheon to develop replacement components, as part of a joint logistics support plan extending to around 2030. Taiwan will join some other AMRAAM users in raising the issue of humidity, which makes it harder to store and maintain the missiles, and could accelerate their spares problem.

Jan 6/11: P-3C. Lockheed Martin Maritime Systems and Sensors Tactical Systems in Eagan, MN receives a $47.6 million firm-fixed-price contract modification for the initial outfitting of 12 Taiwanese P-3Cs with new avionics components.

Work will be performed in Eagan, MN, and is expected to be complete in December 2012. The US Naval Air Warfare Center Aircraft Division in Lakehurst, NJ manages the contract, on behalf of its foreign Military Sales customer (N00019-09-C-0031).

2010

USA’s non-public Direct Commercial Sales process now open to Taiwan; Major $6+ billion FMS request for 60 helicopters, 2 minehunting ships, sub-launched missiles & PATRIOT air defense upgrades; AH-64 helicopter buy; Sub-launched Harpoon missile buy; ATACMS ballistic missile buy; Up to 20 “Search & Rescue” helis; E-2C early-warning aircraft upgrades; We could use some new tanks; Military balance keeps tilting against Taiwan. ATACMS from M270

Dec 30/10: E-2C. Northrop Grumman Systems Corp. in Bethpage, NY receives a $6.6 million delivery order modification, exercising an option for engineering, technical and sustaining services in support of Taiwan Air Force E-2C aircraft under the Foreign Military Sales program.

Work will be performed in Bethpage, NY (75%), and at the Pingtung Air Force Base, Taiwan (25%), and is expected to be complete in December 2011. The US Naval Air Warfare Center Aircraft Division in Patuxent River, MD manages this contract on behalf of its Foreign Military Sale customer (N00421-05-G-0001).

Dec 26/10: P-3C. The China times in Taipei reports that Taiwan will receive its first P-3C Orion sea control aircraft in 2011. They end up being about 2 years ahead of themselves. Agence France Presse.

Dec 23/10: E-2 Hawkeyes. Northrop Grumman Systems Corp. in Bethpage, NY receives an $11.9 million firm-fixed-price delivery order to convert 2 E-2T aircraft into E-2C Hawkeye 2000 aircraft. These efforts will also support the transition to an anticipated performance based spares & maintenance solution for the aircraft.

Work will be performed in Bethpage, NY, and is expected to be complete in September 2012. US Naval Air Systems Command in Patuxent River, MD manages the contract on Taiwan’s behalf (N00019-10-G-0004).

Dec 23/10: Missiles. Lockheed Martin Corp. in Grand Prairie, TX receives a $916.2 million firm-fixed-price contract, with some cost-plus-fixed-fee contract line item numbers. They’ll provide 226 ATACMS missiles; 24 launcher modification kits; ground support equipment; contractor field support; and initial spares in Foreign Military Sales to United Arab Emirates, and Taiwan.

This order is probably deliberately ambiguous. ATACMS missiles are used with tracked M270 MLRS (2 pods) and FMTV medium truck-mounted M142 HIMARS (one pod) systems, with the ATACMS missile replacing all 6 of a pod’s 227mm rockets. In exchange, it offers a GPS-guided strike range of around 150 miles – which could technically cross the Taiwan Strait at its narrowest points, but in practice would be limited to the very useful ability to hit any target in Taiwan from a central firing location.

Taiwan doesn’t operate the HIMARS systems the UAE has purchased, or the MLRS. On the other hand, its 57 Thunderbolt 2000 systems mounted on HEMTT heavy trucks do carry rocket pod options that include 2 sets of 6 227mm rockets each, which indicates potential ATACMS compatibility. The UAE’s latest DSCA request included 100 ATACMS missiles and 60 training rockets, but a 2006 request could cover another 200 missiles. This leaves Taiwan’s actual ATACMS order ambiguous, pending more direct clarification.

Work will be performed in Grand Prairie, TX; Lufkin, TX; Ocala, FL; Camden, AR; and Chelmsford, MA, with an estimated completion date of Nov 30/13. One bid was solicited with one bid received by U.S. Army Contracting Command, AMCOM in Redstone Arsenal, AL (W31P4Q-11-C-0001).

DSCA: ATACMS missiles

Oct 8/10: AH-64 order. Boeing in Mesa, AZ receives a $141.7 million firm-fixed-price contract for 31 AH-64D Apache helicopters and 2 fixed-site Longbow crew trainers, matching “the Taiwan AH-64D aircraft configuration.” Work is to be performed in Mesa, AZ, with an estimated completion date of July 30/15. One bid was solicited, with one bid received by the US Army’s AMCOM Contracting Center at Redstone Arsenal, AL (W58RGZ-09-G-0147).

This is just the initial contract. The amount is enough to get work started, but won’t even come close to paying for 31 helicopters. See April 12/10, and also Oct 3/08, which identified the helicopters as AH-64D Block IIIs. Past experience, and the specifics of this Pentagon announcement, strongly imply that Taiwan’s AH-64D Block IIIs may not be the same as other nations who order the type.

Sept 13/10: Lockheed Martin Missiles and Fire Control in Dallas & Grand Prairie, TX received a $7.8 million firm-fixed-fee and cost-plus-fixed fee contract for PAC-3 FY 2010 subset efforts to include the following: United States enhanced launcher electronics system kit cables; Taiwan control interface circuit card assembly redesign; Taiwan power and control circuit card assembly redesign; Taiwan missile test set; Taiwan portable four-pack test set; Taiwan seeker digital processor parts; United Arab Emirates (UAE) portable 4-pack test set; UAE guidance processor unit redesign – tooling and test equipment.

The estimated completion date is Oct 31/12, with work to be performed at Dallas, TX (95.74%), Camden, AZ (0.25%), and Ocala, FL (4.01%). One bid was solicited and one bid received (W31P4Q-10-C-0002).

Sept 6/10: BMD progress. Taiwan expects its initial missile defence shield to be ready in 2011, including 6 batteries of Patriot PAC-3 missiles, a “long-range early warning radar system,” and an integrated command and control system that also incorporates its own “Tien Kung” missiles. The China Times places the overall cost at about T$ 300 billion (currently about $9.39 billion), with about T$ 150 billion going toward the Patriot systems and T$ 40 billion to the long-range radar. Agence France Presse.

Aug 12/10: DCS OKed. The U.S. Department of State confirms that it will allow U.S. companies to make a number of defense sales to Taiwan as Direct Commercial Sales (DCS), instead of as Foreign Military Sale (FMS) packages. Items expected under $100 million or so in expected DCS deals include support for Taiwan’s air defense radar system, and an improved radar for its F-CK Ching-kuo fighters.

For Taiwan, DCS sales have 2 big advantages over FMS transactions. One is that they don’t have to pay middleman fees to the US military units who must oversee and manage the entire process. If the item in question can be competitively sourced and is well-understood, that can lower costs. The other, bigger advantage is that they don’t require the same level of public notification and political approval, which gives them a lower political profile. See the “Additional Readings” section below, for more on the differences between DCS and FMS sales. Taiwan’s CNA | CNA follow-up.

FMS, or DCS

Aug 5/10: Frigates. Reports surface that America will sell Taiwan 2 more refurbished FFG-7 Oliver Hazard Class Perry frigates for $40 million. On the other hand, “The Ministry of National Defense declined to comment on the report and a spokeswoman at the American Institute in Taiwan said she was not aware of it.”

The ROC Navy already operates 8 similar FFG-7 derivative Cheng Kung Class frigates, alongside its 6 high end Kang Ding Class Lafayette derivatives. AFP via Taipei Times | Pakistan’s The News International

July 29/10: Harpoon order. A $66 million firm-fixed-price contract for:

  • 32 Lot 85 Harpoon missile bodies (HMB) for the government of Taiwan
  • 4 Harpoon canister grade “B” missiles for the government of Canada
  • Associated spares and support.
  • Harpoon missile spares for the governments of Canada, the Netherlands, Portugal, Japan, the United Kingdom, Israel, Pakistan, Turkey and Singapore, to include containers;
  • Plus Block II guidance section upgrade kits; wire bundle assemblies; and guidance control units.

  • GM-84 Harpoon missile body consists of the Guidance Section, Warhead Section, Sustainer (propulsion) Section, and the Control Section. The Harpoon missile body, along with an appropriate air, canister (ship) or other launch kit (to include wings, fins, booster if applicable for UGM-84s), makes up a Harpoon AUR. This contract combines purchases for the governments of Taiwan ($43.8M; 66.4%), Canada ($10.1M; 15.3%), Portugal ($7.6M; 11.5%), the Netherlands ($3.2M; 4.8%), Japan ($514,864; 0.8%), the United Kingdom ($263,986; 0.4%), Israel ($194,635; 0.3%), Pakistan ($169,360; 0.3%), Turkey ($31,643; 0.1%), and Singapore ($2,584; 0.1%) under the Foreign Military Sales program.

Work will be performed in St. Charles, MO (55.3%); McKinney, TX (10.7%); Toledo, OH (6.2%); Huntsville, AL (4.5%); Lititz, PA (3.7%); Middletown, CT (2.7%); Grove, OK (2.3%); Galena, KS (1.6%); Minneapolis, MN (1.5%); Motherwell, UK (1.2%); Elkton, MD (1.1%); Kirkwood, MO (1%); Anniston, AL (0.8%); Clearwater, FL (0.7%); McAlester, OK (0.6%); Melbourne, FL (0.6%); and various locations in and outside the contiguous U.S. (5.5%). Work is expected to be complete in June 2011. This contract was not competitively procured (N00019-10-C-0053).

Harpoon missiles

July 26/10: Hellfire missiles. The Longbow, LLC joint venture in Orlando, FL received a $39.5 million cost-plus-fixed-fee contract for engineering services supporting the Hellfire and Hellfire Longbow missiles. Work is to be performed in Orlando, FL (50%); Baltimore, MD (25%); United Arab Emirates (10%); and Taiwan (15%), and will run to Sept 30/12. One bid was solicited with one bid received by the U.S. Army Aviation and Missile Command, AMSAM-AC-TM-H in Redstone Arsenal, AL (W31P4Q-10-C-0256).

The Hellfire Longbow missile is a fire-and-forget version of the Hellfire anti-armor missile. Unlike the semi-active laser guided Hellfires, Hellfire Longbow missiles rely on millimeter-wave guidance, and work in conjunction with the mushroom-shaped Longbow radar mast that’s mounted on top of the AH-64D attack helicopter’s rotor. Taiwan became a Hellfire missile customer in 2005, but doesn’t operate the Longbow variant yet.

July 20/10: Radars. Raytheon Integrated Defense Systems in Sudbury, MA receives a $29.2 million contract modification for the surveillance radar program, which aims to provide Taiwan with elements of its missile and air defense system. This is a foreign military sales program managed by the 850th ELSG/PK at Hanscom Air Force Base, MA, and $8,324,987 has been committed (FA8722-05-C-0001, P00073).

July 20/10: Taiwan’s Liberty Times reports that Taiwanese President Ma Ying-jeou ordered the country’s defense ministry to draft a draw up a shopping list of weapons Taiwan needs. It reportedly includes MK-54 lightweight torpedoes to replace aging Mk-46s, “dozens” of M1A2 tanks, and amphibious landing vehicles. Taiwan’s current tank corps is headlined by a set of about 480 M60A3 Patton tanks, which are 1960s-1970s technology, and a larger set of M48 variants, whose design dates from the early 1950s. UPI.

July 19/10: Tilting balance. A report sponsored by Taiwan’s Ministry of Defense, and published in Taiwan’s naval studies journal, estimates that China will increase the number of short- and medium-range missiles pointed at the island to 1,960 by the end of 2010. That would rise from the last current count of 1,300-1,400. The report estimates that these missiles would have the ability to destroy 90% of Taiwan’s infrastructure. AP | Reuters | RTT News | Taiwan News.

This day also marks the start of an annual computerized wargame by Taiwan’s military, simulating an invasion by China. During the 5-day drill, Chinese forces attack from Guangzhou and Nanjing, while Taiwanese forces test counter-attack strategies. eTaiwan News | Agence France Presse.

June 23/10: E-2s. Taiwan News reports that upgrades are beginning for Taiwan’s E-2T fleet of early warning aircraft. The ROCAF retains 2 E-2Ts and 2 newer E-2C+ Hawkeye 2000s, but it sent 2 “folded and wrapped” E-2Ts by truck from Kaohsiung’s Hsiaokang Airport to the city’s port under heavy escort, for loading onto a Taiwanese freighter and shipment to the USA.

Upgrades are being done in batches of 2, and are expected to finish up in 2012, at a total cost of NT$ 5.6 billion (currently about $175 million). See also July 21/09, Oct 3/08.

E-2 upgrades

June 1/10: Patriot. Raytheon Co. in Andover, MA receives a $21.3 million firm-fixed-price contract, covering spares for Taiwan’s PATRIOT Config-3 upgrade, and for Kuwait’s Patriot radar upgrade.

Work will be performed in Andover, MA, with an estimated completion date of June 30/13. One bid was solicited with one bid received (W31P4Q-09-G-0002).

April 30/10: Patriot. BAE Systems in Sealy, TX received a $5.6 million firm-fixed-price contract for 8 of its M1086A1P2 and 9 of its M1A096A1P2 Patriot vehicles with Patriot kits installed for the country of Taiwan, as well as 7 M1088A1P2 FMTV tractor-trucks, for a total of 24 vehicles purchased with this modification. Work is to be performed in Sealy, TX, with an estimated completion date of Dec 31/10. One bid was solicited with one bid received by the TACOM Contracting Center in Warren, MI (W56HZV-08-C-0460).

Taiwan appears to have chosen FMTV medium trucks, as opposed to the Oshkosh HEMTT heavy trucks used by the US Army. While Oshkosh will own the next FMTV medium truck contract as well, BAE Systems retains the rights to key variants, and are currently the only production source for FMTV vehicles.

Chinese Type 022
(click to view full)

April 12/10: Corvette. Taiwan unveils a proposed design for a 1,000 tonne “carrier killer corvette,” as some media sources describe it. The catamaran design looks a lot like China’s current Type 022 catamarans, but would be armed with Taiwanese Hsiungfeng III ship-to-ship missiles. At this point, the project itself is not a firm decision, and could be built locally (most likely) or become a foreign tender.

While fast attack craft with advanced ship-killing missiles are always dangerous to carriers, they are also very dangerous to amphibious assault groups in an invasion scenario. Other potential uses could include coastal patrol, and even acting as a naval “cavalry screen” against China’s Type 022s, in order to buy space for American naval forces. See: Naval OSINT (with picture) | Defense News | Manichi Daily News, Japan | Singapore Straits-Times | UPI.

April 12/10: AH-64s. Defense News reports that a contract for 30 AH-64D Apache Longbow attack helicopters is expected to be signed in May 2010, for arrival in Taiwan between the end of 2012 and the beginning of 2013. Focus Taiwan.

March 16/10: Tilting Balance. The U.S. – China Economic and Security Review Commission holds a public hearing on “Taiwan-China: Recent Economic, Political, and Military Developments across the Strait, and Implications for the United States.” Much of the debate surrounds Taiwan’s remaining request for F-16s, either implicitly or explicitly. Mark Stokes, of Project 2049, lays out a framework for thinking about these issues in his testimony:

“Aerospace power will become an increasingly powerful instrument of PRC coercion… Aerospace power likely will dominate any conflict in the Taiwan Strait and could shape its ultimate outcome… The cross-Strait security situation often is viewed within the context of a military balance. However, PLA capabilities should be judged against specific political objectives in a given scenario and assessed in light of Taiwan’s vulnerabilities, as well as assumptions upon which U.S. decisions… are made… An amphibious invasion is the least likely yet most dangerous scenario… Coercive strategies could include a demonstrations of force as seen in the 1995/1996 missile exercises, 1999 flights in the Taiwan, or in the future a blockade intended to pressure decision makers in Taiwan to assent to Chinese demands, strategic paralysis involving attacks against the islands critical infrastructure, limited missile strikes, flights around the island, just to name a few.

A coercive campaign could be geared toward inflicting sufficient pain or instilling fear in order to coerce Taiwan’s leadership to agree to negotiations on Beijing’s terms, a timetable for unification, immediate political integration, or other political goals. Military coercion succeeds when the adversary gives in while it still has the power to resist and is different from brute force, an action that involves annihilation and total destruction.”

See also RAND’s testimony regarding the overall military balance, and the challenge of Chinese missile salvos aimed at RoCAF air bases. Hearings page | Taipei Times | WIRED Danger Room.

Feb 25/10: Javelin missiles. Lockheed Martin Corp. in Orlando, FL received a $21 million firm-fixed-price contract for FY 2009-2011 hardware production of Javelin anti-tank missile systems to Taiwan.

Javelin is a joint venture between Raytheon and Lockheed Martin. Work is to be performed in Tucson, AZ (50%, Raytheon), and Orlando, FL (50%, LM), with an estimated completion date of Jan 17/11. One bid was solicited with one bid received by Aviation & Missile Command Contracting Command, CCAM-TM-H in Redstone Arsenal, AL (W31P4Q-09-C-0376). See also Oct 3/08 entry.

More Javelin missiles

Feb 22/10: Tilting balance. The Associated Press receives a US Defense Intelligence Agency report (DIA-02-1001-028) that supposedly says Taiwan’s air force is not ready to withstand an attack from China. While the Taiwanese have 400 combat aircraft to serve in various roles, “far fewer of these are operationally capable.” The F-5 fleet is near the end of its combat life, and its F-16A/B Block 20s need upgrades. Its Mirage 2000v5s are the most advanced in the fleet, but they are so expensive to maintain, and have had such chronic difficulties with the aircraft’s turbine fan blades, that Taiwan is considering retiring them.

That’s significant for Taiwan’s F-16 request, because under the 1979 Taiwan Relations Act, decisions on Taiwan’s weapon requests must be “based solely” on judgments concerning Taiwan’s defense needs, without other political considerations. AP | Defense News | Reuters

Feb 11/10: War by other means. Democratic Progressive Party lawmaker Kuan Bi-ling alleges, and the Fisheries Agency confirms, that Chinese pressure on Indonesia has led to a government-recommended boycott of fishing vessels made in Taiwan. The economic impact is estimated at NT$ 100 million per year. The move is not a military move, but it does have some military implications. It’s both a protectionist strike in favor of China’s growing shipbuilding sector, and a way of weakening Taiwan’s breadth of expertise in that area. Taiwan News.

Feb 3/10: EC225 helicopter order. Taiwan is spending $112 million for 3 of Eurocopters’s EC225 Super Puma MkII+ helicopters in search and rescue (SAR) configuration, with an option for up to 17 more machines.

The order is carefully calculated, and the ROC government says the helicopters are for civilian use. The choice of helicopter is also careful, as China’s own Ministry of Communications already operates 2 EC225s for SAR duties, as does Japan’s Coast Guard to the east. On the other hand, EC225s could be converted to medium military helicopters quite quickly – a point that has been brought up before over Eurocopter’s EC175/ Z-15 and Z-9 joint ventures in China. France uses the military EC725 for SEA and Special Forces duties, and Mexico and Brazil have also ordered it. To this point, China has been silent concerning this order. Taiwan News | Defense News | DNA India | The Guardian, UK | Reuters.

EC225s

Jan 31/10: F-16 dogfight. eTaiwan News quotes Premier Wu Den-yih, who says that Taiwan and the U.S. are still discussing F-16s and diesel-electric submarines:

“The premier also told reporters that the government would calculate if the cost of the package announced by the U.S. was not too high. The weapons had to come at a reasonable price for a useful quality level, he said. Wu said discussions on the F-16 jets were most likely to bear fruit, while the price tag for the submarines was “scary.” …Opposition Democratic Progressive Party (DPP) Chairwoman Tsai Ing-wen said yesterday that Taiwan’s success in achieving the arms purchase was the result of hard work by the previous DPP administration.”

Link 16 Display
(click to see situation)

Jan 29/10: DSCA – One from category A, one from category B… The US DSCA announces up to $6.45 billion in official requests to recapitalize Taiwan’s battlefield helicopter fleet with 60 UH-60Ms, complete the upgrade of its Patriot missile system to PAC-3 status with missiles and command facilities, add Link-16 capability to key assets, purchase 2 Osprey Class minehunter ships, and buy 12 Harpoon Block II test missiles.

In response, the Chinese embassy in Washington, DC, released a statement condemning the move. There are reports that China will cut off military-to-military cooperation with the US, boycott Obama’s planned nuclear summit in April 2010, and even levy trade sanctions. As media like the UK’s Financial Times point out, however, growing protectionist sentiment in the USA makes trade sanctions against American firms an extremely risky move for the Chinese. China Post | Radio Taiwan International | Taiwan News | Taiwan Today | AllGov | The Australian | BBC News | UK’s Financial Times re: China’s risks | New York Times | Reuters | Times of India | Wall Street Journal | Voice of America | China Daily | China’s Xinhua | China’s Xinhua re: sanctions. See also Taiwan News: “The shadow over Taiwan’s arms procurement.”

UH-60M Black Hawks. The US DSCA announces [PDF] Taiwan’s official request for up to 60 UH-60M Black Hawk helicopters to replace its aged UH-1H Huey fleet, at an estimated cost is $3.1 billion. The principal contractors will be United Technologies’ subsidiary Sikorsky Aircraft in Stratford, CT (UH-60M), and General Electric Aircraft Engines in Lynn, MA. The DSCA adds that:

“The purchaser has requested offsets; however, at this time they are undetermined and will be defined in negotiations between the purchaser and contractors.”

Specific equipment sought includes:

  • 60 UH-60M Black Hawk helicopters
  • 120 T-700-GE-701D engines installed
  • 18 spare T-700-GE-701D engines
  • 69 AN/APR-39Av2 Radar Warning Receivers
  • 69 AN/ALQ-144Av1 Infrared Countermeasure Sets
  • 69 AN/AAR-57 Common Missile Warning Systems
  • 69 AN/AVR-2B Laser Detecting Sets
  • 120 GAU-19/A .50 cal Machine Gun Systems
  • 310 AN/AVS-9 Aviator Night Vision Goggles.
  • Associated .50 cal ammunition, pyrotechnics, cartridges and propellant actuated devices, to equip the guns and countermeasures systems.
  • Plus “other explosives including devices,” Po-Sheng Communication/Data Link Systems, ammunition, spare and repair parts, tools and support equipment, publications and technical data, personnel training and training equipment, and other support.

Taiwan doesn’t operate Black Hawks yet, but its Navy operates S-70C Seahawk helicopters, so it has some experience with the general type. Implementation of this proposed sale may require the assignment of 2 contractor representatives for a period of up to 2 years.

DSCA: UH-60M request

MIDS-LVT/ Link 16: The US DSCA announces [PDF] Taiwan’s official request to buy 35 Multifunctional Information Distribution Systems Low Volume Terminals (MIDS/LVT-1), 25 MIDS On Ships Terminals, plus spare and repair parts, support and test equipment, training personnel training and training equipment, repair and return, software and hardware updates, publications and technical documentation, and U.S. Government and contractor engineering and support services. The estimated cost is $340 million.

This may seem like an afterthought, but it’s actually a critical contract. MIDS-LVT terminals are a standardized way of embedding “Link 16” datalinks into ships, aircraft, and land systems. By transmitting encrypted information to each other and filtering out duplications, Link 16 allows participating platforms to see the same tactical picture – what one sees, all can see. This dramatically improves awareness amidst the inevitable “fog of war” , and can help to minimize friendly fire incidents. LVT-1 terminals are used in aircraft, as well as ground units like Patriot missile systems. They include both Tactical Air Navigation System, and voice capabilities.

The prime contractor will be selected through a competitive procurement conducted by the U.S. Government, involving ViaSat and the BAE Systems/ Rockwell Collins joint venture Data Link Solutions. Implementation of this proposed sale will require multiple trips involving U.S. Government and contractor representatives to participate in training, program management, and technical reviews.

DSCA: Link-16 datalinks

Osprey Class minehunters The US DSCA announces [PDF] Taiwan’s official request to buy 2 Osprey Class coastal mine-hunting ships, including refurbishment and upgrade, overhaul of their AN/SQQ-32 sonars, transportation, support and test equipment, spare and repair parts, publications and technical documentation, personnel training and training equipment, and U.S. Government and contractor support. The estimated cost is $105 million.

The USA’s 12 Osprey Class mine-hunters were built from 1993-1999 out of fiberglass-reinforced plastics, in order to minimize their magnetic signature. These 804t/ 57m vessels locate mines using the high definition SQQ-32 sonar, then neutralize them using a remotely controlled UUV(Unmanned Underwater Vehicle). Despite continued threats in critical global areas like the Strait of Hormuz, and adequate performance, the Osprey Class was taken out of US Navy service in 2006-2007. Taiwan would join Egypt (2), Greece (2), Lithuania (2), and Turkey (2) as customers for these second-hand vessels. Approval for the transfer of Oriole [MHC-55] and Falcon [MHC-59] was authorized back in the Consolidated Natural Resources Act of 2008 (Public Law 110-229), but the US State Department had dithered over the request (q.v. Nov 18/09 entry).

For this contract, a U.S. Prime contractor for the refurbishment will be chosen after a competitive source selection. Implementation of this sale will not require the assignment of any additional U.S. Government personnel or contractor representatives.

DSCA: Minehunters request

Harpoon Block II missiles. The US DSCA announces [PDF] Taiwan’s official request for 12 “Harpoon Block II Telemetry” missiles. The DSCA release cites 10 “RTM-84L” and 2 “ATM-84L” missiles, which have telemetry payloads for missile tests, instead of the warheads found on standard RGM-84 (ship-launched) and AGM-84 (air-launched) variants. In addition to the missiles, Taiwan would receive containers; training devices; spare and repair parts; supply/technical support; support equipment; personnel training and training equipment; technical data and publications; and U.S. Government and contractor support.

The estimated cost is $37 million, the prime contractor will be Boeing subsidiary McDonnell Douglas in St. Louis, Missouri, and implementation of this sale will not require any additional U.S. Government personnel or contractor representatives.

The Harpoon Block II could be militarily significant, because its GPS guidance and improved clutter resolution allow it to attack land targets, as well as ships. See also the Oct 3/08 entry, requesting submarine-launched Block II missiles. Taiwan is building its own “HF-2E Hsiung Feng” land attack cruise missiles with much longer ranges, however, so the Block II’s land-attack capability would not be a new military development in the region.

DSCA: Harpoon missile request

Patriot Missiles & C2. The US DSCA announces [PDF] Taiwan’s official request to complete its Patriot upgrade plans, adding PAC-3 missiles and additional command equipment.

  • 114 PATRIOT Advanced Capability (PAC-3) missiles
  • 26 M902 Launching Stations
  • 3 AN/MPQ-65 Radar Sets
  • 1 AN/MSQ-133 Information and Coordination Center
  • 1 Tactical Command Station
  • 3 AN/MSQ-132 Engagement Control Stations
  • 3 Communication Relay Groups
  • 5 Antenna Mast Groups
  • 1 Electronic Power Plant III (EPP)
  • Plus battery and battalion maintenance equipment, prime movers, generators, electrical power units, trailers, communication equipment
  • Also personnel training and equipment, tool and test sets, spare and repair parts, publications and technical documentation, Quality Assurance Team support services, and U.S. Government and contractor support.

The estimated cost is $2.81 billion, and the principal contractors will be Raytheon Corporation in Andover, MA, and Lockheed-Martin in Dallas, TX. “The recipient, which already has PAC-3 missiles in its inventory, will have no difficulty absorbing these missiles… Implementation of this proposed sale will not require the assignment of any additional U.S. Government and contractor representatives.” See also Dec 23/09, Oct 16/09, Jan 26/09, and Oct 3/08 entries.

DSCA: PATRIOT missile request

Jan 14/10: E-2s. Northrop Grumman Systems Corp. in Bethpage, N.Y., received a $6 million firm-fixed-price, cost-plus-fixed-fee delivery order against a previously issued basic ordering agreement to provide engineering, technical and sustaining services in support of Taiwan’s 6 E-2T/E-2C+ Hawkeye airborne early warning aircraft. Work will be performed in Bethpage, NY (75%), and at Pingtung Air Force Base, Taiwan (25%), and is expected to be complete in January 2011. The Naval Air Systems Command in Patuxent River, MD manages this contract (N00421-05-G-0001).

Jan 14/10: P-3C planes, shipped by land. Since the P-3 production line isn’t active any more, all 12 of the mothballed P-3s slated for Taiwan had to come from stored US Navy aircraft at AMARG’s “boneyard” near Davis-Monthan AFB, Tucson, AZ. The problem is that all 12 were labeled “non-flyable” due to structural fatigue, which made the 2,000 mile trip to Lockheed Martin’s refurbishment and re-winging facility in Greenville, SC, a bit of a challenge.

After considering and rejecting rail transport due to offloading and re-loading risks, the AMARG team decided to use a flatbed truck. That’s an unusual method, but it worked. Their approach has stirred interest from other P-3 operators, and even US federal government agencies. Read “Delivering Your Plane, By Truck” for more.

Jan 10/10: Frigates? Reports surface that Taiwan plans to buy 8 FFG-7 Oliver Hazard Perry Class frigates from the USA, then outfit them with more advanced systems. Australia has already laid down a blueprint for that kind of modernization, adding SM-2 Standard and RIM-162 ESSM anti-aircraft missiles to their FFG-7 Adelaide Class frigates at great expense. But reports in the Taipei-based China Times speak of refitting the frigates with an AEGIS combat and radar system. That would break new technical ground, and may prove difficult to add, given the FFG-7 ships’ limited “growth space.” Agence France Presse | Information Dissemination.

Jan 3/10: The Washington Post adds fuel to speculation that approval of additional equipment sales for Taiwan – but not F-16s – is imminent:

“The Obama administration is expected to approve the sale of several billion dollars in Black Hawk helicopters and anti-missile batteries to Taiwan early this year, possibly accompanied by a plan gauging design and manufacturing capacity for diesel-powered submarines for the island…”

Taiwanese Patriot batteries already exist, of course, and their expansion contract is a done deal as of late December 2009. The next step is exporting the PAC-3 missiles themselves. Washignton Post | Radio Taiwan.

2009

Major order for new PATRIOT missile ground systems; P-3 sea control planes ordered; Taiwan buys Stinger air-air missiles for its coming AH-64 attack helicopters. Patriot system
(click for explanation)

Dec 23/09: Patriot SAM. Raytheon announces Foreign Military Sales contract awards totaling $1.1 billion to fund new production of Patriot Air and Missile Defense System for Taiwan. The awards include ground-system hardware through an initial contract valued at $965.6 million, and an initial spares contract valued at $134.4 million.

See the Oct 3/08 DSCA release; this is the contract for the radars, ground stations, and other ancillary equipment besides the missiles themselves. The U.S. Army Aviation and Missile Command in Redstone Arsenal, AL manages this contract for new-production Patriot fire units, which will include new advances in technology, improved man-machine interfaces, and (hopefully) reduced life-cycle costs over earlier generations.

Major PATRIOT contract

Dec 10-13/09: UH-60s yes, U214s maybe? Reports surface that Taiwan will not get its F-16s approved, but will get its purchase of UH-60s approved. The reports add that a 3-way sale would let Taiwan buy U214 submarines from ThyssenKrupp Marine Systems’ HDW subsidiary. Radio Taiwan International | Taiwan Today.

Nov 18/09: F-16 dogfight. Rep. Ileana Ross Lehtinen [R-FL] introduces co-sponsored bill H.R. 4102. The bill cites key provisions of the 1979 Taiwan Relations Act that are not being followed, including the stipulation that weapon requests be “based solely” on judgments concerning Taiwan’s defense needs, without other political considerations. It also cites Taiwan’s expressed desire for F-16 C/D fighters, and the lack of any arms transfer notifications to Congress for Taiwan during calendar year 2009 – despite Taiwan’s expressed desire for F-16s, H-60 Blackhawk helicopters, diesel submarine design, and additional Patriot PAC-3 systems. Nor have the Osprey class minehunter coastal ships Oriole [MHC-55] and Falcon [MHC-59] been transferred, even though Congress authorized the sale of these ships in the Consolidated Natural Resources Act of 2008 (Public Law 110-229).

The bill is essentially a Congressional freedom of information request, requiring reports 90 days after enactment and at least annually thereafter, so that Congress is aware of any discussions conducted between any executive branch agency and the Government of Taiwan during the covered period; and any potential transfer of defense articles or defense services to the Government of Taiwan. This would prevent unelected agencies from using their refusal to present requests to Congress as a way to keep such sales off of the political agenda.

The bill has been referred to the House Committee on Foreign Affairs; if it is not killed by that committee, it would proceed to a floor vote. See Taiwan Today | Bill tracking via GovTrack.

Oct 16/09: Patriot SAM. Raytheon in Andover, MA receives a $77.9 million firm-fixed-price contract for Taiwan’s Patriot hardware upgrade program. Work is to be performed in Andover, MA (8%), and Burlington, MA (15%), with an estimated completion date of June 30/15. One bid was solicited with one bid received (W31P4Q-09-G-0001).

See also the Jan 26/09 and April 23/08 entries, below.

July 21/09: E-2s. Northrop Grumman Systems Corp. in Bethpage, NY receives an unfinalized $154.1 million contract to upgrade all 6 of Taiwan’s E-2 Hawkeye AWACS aircraft from Group II configuration to the more advanced Hawkeye 2000 (H2K) export configuration. See Oct 3/08 entries for more details.

Work will be performed in Bethpage, NY (40%); St. Augustine, FL (22%); Rolling Meadows, IL (6%); Dayton, OH (6%); Windsor Locks, CT (5%); Greenlawn, NY (4%); Mississauga, Canada (4%); Marlboro, MA (4%); and other various locations throughout the United States (9%); and is expected to be complete in June 2013. As Northrop Grumman is the E-2’s manufacturer, this contract was not competitively procured by the Naval Air Systems Command in Patuxent River, MD (N00019-09-C-0040).

E-2C 2000 AWACS upgrade

June 30/09: F-16s. A Flight International article says that Taiwan may see progress regarding its F-16 orders:

“Taiwan’s plans to buy new Lockheed Martin F-16C/D fighters appear to be gaining some traction, with the outgoing de-facto US ambassador to the island saying that senior officials in Washington are likely to consider the issue shortly… Taiwan’s defence minister Chen Chao Min said this week that, contrary to media reports, Washington had not asked Taipei to choose between upgrades to its existing F-16A/Bs and new F-16C/Ds. Requests for mid-life upgrades for the F-16A/Bs and the new fighters are proceeding in tandem, he added.”

June 25/09: Stinger SAMs for AH-64s. Raytheon Missile Systems in Tucson, AZ receives a $45.4 million firm-fixed-price contract from Taiwan for 171 FIM-92 Stinger anti-aircraft missiles, 24 Captive Flight Trainers (CFT) with seekers but no rocket motors, 68 Air to Air Launchers (ATAL), 7 Launcher Circuit Evaluators, 2 Digital Launcher Test Sets (DLTS), 60 Coolant Reservoir Assemblies, 3 Launcher Emulators, one Lot of CFT Spares, one Lot of ATAL Spares, and one Lot of DLTS Spares.

The missiles will equip Taiwan’s 30 requested AH-64D Block III Apache attack helicopters; see also Oct 3/08 entries.

Work is to be performed in Tucson, AZ with an estimated completion date of July 31/12. One bid was solicited, with one bid received by the US Aviation & Missile Command Contracting Center at Redstone Arsenal, AlL (W31P4Q-09-C-0520).

March 16/09: Tilting balance. Taiwan’s Defense Ministry announces its defense review, including plan to cut its troop numbers by 60,000, and end the standard 12 months of compulsory military service within 5 years. This will leave the island with 215,000 troops.

The review adds that China currently has at least 1,300 ballistic missiles pointed at Taiwan, and has deployed advanced Russian-made SU-27 and SU-30 fighters near the island. Defense News.

March 16/09: F-16 dogfight. Taiwan News reports that the country intends to continue pursuing F-16 fighters. The country does not have a formal embassy in the USA, but the Taipei Economic and Cultural Representative Office (TECRO) serves the same functions. TERCO spokesman Vance Chang responded to media requests by noting that the F-5E/F fighters that make up most of the country’s air force have been in service for more than 34 years.

“The planes now are obsolete and spare parts are difficult to obtain… [given China’s ongoing modernization] our air superiority capability is at a serious disadvantage.”

The U.S.-Taiwan Business Council represents about 100 companies, including Lockheed Martin. The organization’s president, Rupert Hammond-Chambers, adds that under the terms of the Taiwan Relations Act, the USA “has an obligation to assist Taiwan to maintain a credible defense of its air space, which includes modern fighters.” This would explain a July 2008 US Navy PACOM evaluation that deemed the F-16s militarily unnecessary, a silly position on its face but explicable if one begins from the desired political result.

March 13/09: P-3 MPAs. Lockheed Martin Maritime Systems and Sensors Tactical Systems in St. Paul, MN receives a $665.6 million firm-fixed-price contract for the procurement of phased depot maintenance, structural service life extension, and avionics modification to refurbish and sell 12 P-3C maritime patrol aircraft to the government of Taiwan. This contract also provides for ground handling, support equipment and publications.

Work will be performed in St. Paul, MN (50%); Greensville, SC (27%) and Marietta, GA (23%), and is expected to be complete in August 2015. This contract was not competitively procured, and is managed by the Naval Air Systems Command in Patuxent River, MD (N00019-09-C-0031). See also the Sept 12/07 DSCA request.

P-3C MPAs

March 11/09: F-16 dogfight. Taiwan’s speaker is quoted as saying that the US has refused to sell Taiwan 66 more F-16s for about $5 billion, in order to augment and modernize the Republic of China’s fighter defense fleet. Wang Jin-pyng was quoted as saying that:

“The U.S. doesn’t want to give them to us… They wouldn’t name a price. It’s mainly because mainland China would oppose the sale.”

See: Taiwan News | Reuters | Washington Post.

Feb 23/09: P-3 MPAs. Defense News reports that Taiwan, the U.S. Navy and Lockheed Martin have finally settled issues over price and offset options, and are to soon sign a $1.3 billion contract to refurbish and supply 12 P-3C Orion maritime patrol aircraft. Taiwan had traditionally been opposed to buying refurbished aircraft taken from AMARC in Arizona, but re-starting the P-3C production line was not a realistic option. Lockheed Martin has re-started a production line to re-wing existing P-3Cs, however, and countries like Norway, Canada, and even the US Navy have been taking advantage of that capability to extend the service lives of existing aircraft.

Delivery of the P-3s would end the career of Taiwan’s 37 ancient S-2T Trackers, which are reportedly down to just 3 operational aircraft, even as China’s own submarine fleet grows by leaps and bounds.

Jan 26/09: Patriot SAM. Raytheon announces a $154 million Foreign Military Sales contract to upgrade more of Taiwan’s Patriot Air and Missile Defense Systems ground systems and radars from Configuration-2 to Config-3 standard, enhancing the ROC’s ability to deal with threats like China’s growing array of ballistic missiles pointed at the island.

Work under this contract will be performed by Raytheon IDS at the Integrated Air Defense Center in Andover, MA; the Warfighter Protection Center in Huntsville, AL; the Mission Capability and Verification Center at White Sands, NM, and by Raytheon Technical Services Company in El Paso, TX.

FY 2006 – 2008

$6+ billion request for PATRIOT missiles & systems, new AH-64 attack helicopters, E-2 early-warning aircraft upgrades, Javelin anti-tank missiles, submarine-launched Harpoon missiles, and aircraft spares; $1.96 billion request for 12 P-3C sea control aircraft; 2 new E-2 Hawkeye 2000 early warning planes commissioned.

Oct 3/08: DSCA Shopping Lists. It would appear that the financial crisis in the USA has a silver lining for Taiwan’s military, as a series of DSCA announcements worth $6.363 billion are issued to Congress’ extended session. All export requests are listed in DSCA releases as being “…consistent with United States law and policy as expressed in Public Law 96-8. The U.S. is committed to providing military assistance under the terms of the Taiwan Relations Act.”

Purchase requests include:

Ar/Missile Defense – Patriot PAC-3 [see announcement, PDF]:

  • 330 PATRIOT Advanced Capability (PAC-3) missiles
  • 24 Launching Stations
  • 4 AN/MPQ-65 Radar Sets
  • 2 Tactical Command Stations
  • 2 Information and Coordination Centrals
  • 12 Antenna Mast Groups
  • 6 Communication Replay Groups
  • 4 Engagement Control Stations
  • 282 Single Channel Ground and Airborne Radio System (SINCGARS) (115 AN/VRC-88E, 96 AN/VRC-90E, 13 AN/VRC-91E, and 58 AN/VRC-92E) radios
  • 9 Electronic Power Plant III (EPP)
  • 50 Multifunctional Information Distribution Systems (MIDS, provides Link 16 data sharing)
  • Plus battery and battalion maintenance equipment, vehicles, generators, electrical power units, personnel training and equipment, trailers, communication equipment, tool and test sets, spare and repair parts, publications, supply support Quality Assurance Team support services, U.S. Government and contractor engineering and logistics services, technical documentation, and other related elements of logistics support.

See also Nov 9/07 request re: upgrading its Patriot PAC-2 batteries to be PAC-3 compatible (Config-3). The estimated cost of this request is $3.1 billion, and the prime contractors will be Raytheon Corporation in Andover, MA and Lockheed-Martin in Dallas, TX. Taiwan has not previously purchased PAC-3 missiles, but they do use PAC-2s. They will require several U.S. Government representatives for 2-week intervals twice annually, to participate in program management and technical reviews.

DSCA: PATRIOT request

Hawkeye 2000 test aircraft
(click to view full)

Ar/Missile Defense – Hawkeye 2000 [see announcement, PDF]:

Taiwan already flies 2 E-2C+ Hawkeye 2000 and 4 E-2T Hawkeye aircraft for airborne early warning and control, and wants to upgrade the E-2Ts to the Hawkeye 2000 configuration used by the USA, France, Japan and others. The upgrade will include provisions for the Joint Tactical Information Distribution System (Link 16 for a common battlespace picture), avionics, navigation and non-navigation upgrades, and aircraft electrical, mechanical, and survivability upgrades, all necessary hardware installations, support equipment, spares and repair parts, installation and training, publications and technical documents, U.S. Government and contractor technical assistance, and other related elements of logistics and program support.

American Hawkeye 2000s also have Cooperative Engagement Capability, which allows them to provide shared battlespace pictures and targeting for properly equipped Patriot PAC-3 and PAC-2 missiles. If CEC is not included, the JTIDS/Link 16 can be used to share a battlespace picture and provide advance warning, but cannot be used for targeting.

The estimated cost is up to $250 million, and the prime contractor will be Northrop Grumman Corporation in Bethpage, NY. Implementation of this proposed sale will require the assignment of 6 contractor representatives to the recipient for a not to exceed a 5-year period.

Taiwan has requested industrial offsets with this order; they will be defined in negotiations with Northrop Grumman.

DSCA: E-2C 2000 AWACS upgrade request

Air Force – Aircraft Parts [see announcement, PDF]:

This blanket order would allow Taiwan to requisition follow-on spare parts as required to maintain its C-130H Hercules transports, F-5E/F Tiger II fighters, F-16A/B fighters, and F-CK IDF fighter aircraft. The requisitions can include communication equipment, radar, and other related elements of logistics support, as well as spares. The estimated cost is $334 million, and items will be ordered from appropriate contractors as needed.

Implementation of this proposed sale will not require the assignment of any additional U.S. Government and contractor representatives to the recipient.

AH-64D w. Arrowhead
(click to view full)

Army – Apache Longbow attack helicopters and weapons [see announcement, PDF]. Taiwan currently flies AH-1W Cobras in this role, and an attack helicopter deal has been in the works since 2002. The AH-64D beat Bell’s AH-1Z Viper on the grounds that it was battle proven, while the AH-1Z remains developmental.

Taiwan is requesting 30 AH-64D Apache Longbow Block III attack helicopters, the helicopter’s most modern configuration which is just beginning to enter service in the USA. The helicopters will be equipped with 30 Modernized Target Acquisition Designation Sight/Pilot Night Vision Sensor (MTADS/PNVS “Arrowhead”), 17 AN/APG-78 Fire Control Radars and AN/APR-48 Radar Frequency Interferometer (FCR/RFI), 69 T700-GE-701D Turbine Engines. Composite horizontal stabilators, crew and maintenance trainers, depot maintenance, all necessary support equipment, tools and test equipment, integration and checkout, spares and repair parts, training and training equipment, and other forms of support are included in the base purchase.

The request also includes applicable weapons for these helicopters: 173 FIM-92F Stinger Block I Air-to-Air Missiles, 35 Stinger air-air missile Captive Flight Trainers with live guidance systems but no rocket motors, 1,000 AGM-114L Longbow Hellfire anti-armor missiles that can use the APG-78 and their own radar’s millimeter-wave guidance for “fire and forget” capability, and 66 M299 Hellfire missile launchers.

The estimated cost is $2.532 billion, and Taiwan has requested industrial offsets; these will be defined in direct negotiations with the contractor(s). Implementation of this proposed sale will require the assignment of 2 U.S. Government personnel for a period of 6 years to provide intensive coordination, monitoring, and technical assistance. In addition, 6 contractor representatives will be in country serving as Contractor Field Service Representatives for a period of 5 years, with the possibility of a 5-year extension. The principal contractors will be:

  • The Boeing Company in Mesa, AZ and St Louis, MO (AH-64)
  • General Electric in Lynn, MA (Engines)
  • Lockheed Martin Missiles and Fire Control in Orlando, FL (Longbow Hellfires, M299, Arrowheads)
  • Lockheed Martin Systems Integration in Owego, NY
  • Northrop Grumman Corporation in Baltimore, MD (Longbow Hellfires)
  • Raytheon Company in Tucson, AZ (Stinger missiles)
  • Inter-Coastal Electronics in Mesa, AZ
  • BAE Systems in Rockville, MD

DSCA: AH-64D request

Army – Javelin missiles [see announcement, PDF].

Taiwan wants to buy 182 more man-portable Javelin anti-armor missile rounds and 20 command launch units, plus 40 missile simulation rounds, trainers, rechargeable and non-rechargeable batteries, support equipment, spare and repair parts, and other related elements of logistics support. The estimated cost is $47 million.

Raytheon/Lockheed-Martin’s JAVELIN Joint Venture in Orlando, FL will be the prime contractor. Implementation of this proposed sale will require a U.S. Government Quality Assurance Team consisting of 1 contractor and 2 U.S. Government representatives in country for 5 days to accomplish the initial deployment of the missiles. Taiwan won’t need more help than that, as they were one of the Javelin “fire and forget” missile’s early customers in 2002.

DSCA: Javelin missile request

UGM-84 Harpoon launch
(click to view full)

Navy – Harpoon missiles [see announcement, PDF].

Taiwan requests 32 UGM-84L Sub-Launched Harpoon Block II missiles for its 2 Seadragon Class submarines. Harpoon Block II includes GPS guidance that makes them easier to use near shore (for instance, against amphibious landing ships on final approach), and also gives the missiles some land attack capability out to their 150 mile range. Taiwan’s request adds 2 UTM-84L Harpoon Block II Exercise missiles, 2 Advanced Harpoon Weapons Control System (Version 2) for installation on the Seadragon Class, 36 Harpoon containers, 2 UTM-84XD Encapsulated Harpoon Certification and Training Vehicles, test equipment and services, spares and repair parts for support equipment, and other forms of support.

The estimated cost is $200 million, and the contractor is Boeing subsidiary McDonnell Douglas in St Louis, MO.

The US DSCA notes that “The recipient has previously purchased both air and surface launched HARPOON missiles and will be able to absorb and effectively utilize these submarine-launched missiles.” As such, no additional U.S. Government or contractor representatives will be required.

DSCA: Sub-launched Harpoon missiles request

Sept 29/08: Taiwan News reports that:

“The Pentagon was expected to notify the U.S. Congress of its intention to sell the arms to Taiwan by the end of its current session last Friday. Taiwan has expressed worries that if the U.S. missed the deadline, the Legislative Yuan would have to start the process of approving a budget for the arms package from the start… Congress had been extended to deal with the current financial crisis, and therefore the arms deal could still be approved.

The package includes Patriot missiles, Apache helicopters, diesel-powered submarines, anti-tank missiles, submarine-launched missiles and P-3C Orion anti-submarine aircraft, but not new F-16 fighter jets Taiwan was hoping to buy.

The U.S. State Department notified the Taiwanese media late on Friday that government departments were still reviewing the deal, and that once it was approved, Congress would be immediately notified.”

This did not sound like anything close to a sense of urgency, but events would prove otherwise. Pro-China elements in the US State Department are still blocking approval of Taiwan’s unofficial request for F-16C/D fighters.

April 23/08: Patriot SAM. Raytheon announces a $79 million Foreign Military Sales award from the U.S. Army to provide Taiwan with Patriot Configuration-3 radar upgrade kits and related engineering and technical services. This is part of a much larger order; see Nov 9/07 entry for more.

Work will be performed by Raytheon Integrated Defense Systems at the Integrated Air Defense Center in Andover, MA; the Warfighter Protection Center in Huntsville, AL; and the Mission Capability and Verification Center in White Sands, NM.

Nov 9/07: PATRIOT upgrade request. The US DSCA announces [PDF] “The Taipei Economic and Cultural Representative Office in the United States” formal request to upgrade and refurbish their 3 existing PATRIOT fire units’ ground support equipment to the latest Army Configuration 3 under a $939 million contract. Raytheon Corporation in Andover, MA will be the prime contractor. Although the purchaser generally requires offsets, at this time, there are no known offset agreements proposed in connection with this potential sale and no additional U.S. Government or contractor representatives will be required.

Obviously, this effort is less helpful than acquiring new Patriot PAC-3 missiles to add to Taiwan’s defense. Instead, they are adding Patriot PAC-3 radar and communications enhancements to Taiwan’s existing Patriot batteries, turning them into a PAC-2 GEM+ type configuration in use by a number of US allies. The PAC-2 missile is larger than the PAC-3, and uses a fragmentation warhead instead of the PAC-3 missile’s “hit to kill” approach. Patriot’s widely-touted performance during the 1991 Desert Storm operation turned out to be significantly overstated, but when coupled with PAC-3 class radars et. al., it has demonstrated useful capabilities against incoming ballistic missiles. The specific sale includes:

  • 2 PATRIOT, MIM-104 (Patriot-As-A-Target)
  • Radar Enhancement Phase 3 (REP-3)
  • Classification, Discrimination and Identification Phase 3 (CDI-3)
  • Remote Launch Communication Enhancement Upgrade (RLCEU)
  • An Electric Power Plant.
  • 36 AN/VRC-88E SINCGARS EXP Vehicle Short Range Radio Systems
  • 32 AN/VRC-90E SINCGARS EXP Vehicle Long Range Radio Systems
  • 4 AN/VRC-91E SINCGARS EXP Long Range Radio Systems
  • 11 AN/VRC-92E SINCGARS EXP Dual Range Radio Systems

It also includes non-MDE (Military Designated Equipment under US Arms transfer laws) items such as
all necessary modification kits, communication support equipment, tools and test equipment, integration and checkout, spares and repair parts, installation and training, publications and technical documents, U.S. Government and contractor technical assistance, other related elements of logistics and program support, and 4 telemetry kits for its live fire training.

DSCA: PATRIOT upgrade request

P-3 Orion, armed –
note Sidewinder
(click to view full)

Sept 12/07: P-3 MPAs. The US DSCA announces [PDF] the “Taipei Economic and Cultural Representative Office in the United States” official request for 12 ‘excess’ P-3C Orion maritime patrol aircraft, with strong surveillance and anti-submarine capabilities. The estimated cost is $1.96 billion. DSCA adds that:

“This sale is consistent with United States law and policy as expressed in Public Law 96-8. The United States is committed to providing military assistance under the terms of the Taiwan Relations Act. The recipient’s current patrol aircraft are reaching the end of their fatigue and operational service life. To maintain national security it is necessary that recipient replace these fixed-wing aircraft with an airborne operational capability for land-based maritime patrol and reconnaissance, including economic exclusion zone surveillance and protection, command and control, anti-submarine warfare, and anti-surface warfare. The recipient can absorb these additional aircraft into its inventory.”

Offset agreements associated with this proposed sale are expected, but they will be defined in negotiations between the purchaser and contractors. Principal contractors include Lockheed Martin of Eagan, MN; Lockheed Martin Aircraft Center of Greenville, SC; Rockwell Collins of Cedar Rapids, IA; Raytheon Company of McKinney, TX, EDO (Condor Systems) of Morgan Hill, Ontario Canada; and L3 Wescam of Ontario, Canada. There may be up to 32 U.S. Government and contractor representatives with varying technical skills and disciplines who will be required, following the delivery of the aircraft, to provide support for 1 year after the last aircraft delivery. The exact request includes:

  • 12 ‘excess’ P-3C Orion aircraft with T-56 engines. It is likely that they will begin with ‘boneyard’ stored aircraft that need refurbishing to fly, and significant modifications to be viable for any significant period. Some parties like Norway, for instance, are making their P-3s viable by completely replacing their wings as part of their general overhaul.
  • Aircraft activation, aircraft life extension and avionics modification, transportation
  • 3 excess TP-3A aircraft (non-operational, to be used as airframe spares) with T-56 engines
  • 15 Data Link terminals
  • 19 MIDS-LVT Link 16 terminals
  • 2 MIDS On-Ship Terminals

Plus a mobile operation command center, Command Control Communications Computer Intelligence Surveillance, Reconnaissance, (C4ISR) network integration, training devices, medical services, support and test equipment, engineering technical services, supply support, operation and maintenance training, ground support C2 facilities, documentation, spare/repair parts, publications, documentation, personnel training, training equipment, contractor technical and logistics personnel services, and other related support elements.

DSCA: P-3C MPA request

April 16/06: President Chen Shui-bian presides over the commissioning of 2 E2C+ Hawkeye 2K planes recently purchased from the United States, and calls for an end to KMT blocking of his special military budget requests. The 2 new planes join 4 E-2Ts bought in 1995. China Post.

Additional Readings

Readers with corrections, comments, or information to contribute are encouraged to contact DID’s Founding Editor, Joe Katzman. We understand the industry – you will only be publicly recognized if you tell us that it’s OK to do so.

Background: Policy

Background: Equipment

News & Views

Catégories: Defence`s Feeds

Oshkosh JLTV New Light Recon for US Army | US Lawmakers Call for Walk Back on Saudi Arms Deal | Mitsu Heavy Industries May Build Armored Vehicle with US Partner

jeu, 01/09/2016 - 01:58
Americas

  • The US Army is planning to make the Joint Light Tactical Vehicle (JLTV) its new Light Reconnaissance Vehicle platform and arm it with a variant of the M230 chain gun found on the AH-64 attack helicopter. Manufacturer Oshkosh won a $6.7 billion contract last fall to build the first 17,000 production models of the JLTV. In total, the Army and Marine Corps plan to buy a total of nearly 55,000 of the combat vehicles, including 49,100 for the Army and 5,500 for the Corps, to replace about a third of the Humvee fleets.

  • US lawmakers have called for a freeze on a $1.15 billion arms deal to Saudi Arabia citing concerns regarding the kingdom’s ongoing war against Houthi rebels in Yemen. Signed by 64 members of Congress, a letter was addressed to the Obama Administration asking them to walk back the August 8 approval of the sale, which would include replacing tanks destroyed in the Yemen campaign. The conflict has resulted in the deaths of 3,704 civilians and claims of war crimes have resulted in several Western governments having their Saudi weapons sales scrutinized.

  • General Dynamics – Ordnance and Tactical Systems has been awarded a $39 million modification to a foreign military sales contract for various bomb bodies. The deal would see the production of 162 MK82-1 bomb bodies; 7,245 MK82-6 bomb bodies; and 9,664 MK84-10 bomb bodies for the governments of Saudi Arabia, United Arab Emirates, France, and Iraq. Completion is expected for December 2017.

Europe

  • General Atomic has lodged a protest with the German government over their plan to lease armed Heron UAVs for surveillance missions. The lawsuit is expected to result in significant delays to the UAV’s delivery. GA’s complaint has stemmed from Berlin’s decision to drop their MQ-1 Predator B drones in favor of the Heron lease to service the country’s surveillance needs until the development of a collaborative EU drone, due for 2025.

  • Ukroboronprom has confirmed that the indigenous Horlytsia unmanned aircraft system is ready for delivery to the Ukrainian armed forces in 2018 pending funding allocations from the government. The company’s deputy director Yuriy Paschenko told Interfax that “Works are being carried out within six months. As of today, the creation of the airframe has been completed. Before the end of 2016, we must complete the creation of the development type, complete all the research and development under the project in 2017, as well as the state tests, resulting in the adoption of the weapons.”

  • A Swiss F/A-18C pilot missing since Monday has been found dead. The crash occurred in the Alps during a routine training exercise. Authorities are still investigating the cause of the crash, the third by a Swiss Air Force F/A 18 in the past three years.

Asia Pacific

  • Raytheon and Lockheed Martin’s Javelin Joint Venture team has inked a letter of intent with India’s Tata Power Company to explore development of the Javelin missile under the Make in India initiative. The venture would see the collaboration also create a strategy to co-develop and produce the Javelin system while integrating platform mounts to meet Indian requirements. Fielded by the US Army and the US Marine Corps, the missile system has been approved for 15 foreign military sales customers.

  • Following their failure to secure a $40 billion contract to sell submarines to Australia, Mitsubishi Heavy Industries (MHI) is discussing the possibility of developing an armored vehicle with an undisclosed US company. If given the go ahead, it will mark the first time a Japanese firm builds arms for a foreign customer. While new territory for the company, potential foreign partners could be attracted by their armored vehicle technology, notably heavy-duty tank engines, gear technology, and water jet propulsion systems that could be used to drive amphibious vehicles.

Today’s Video

60 Years of the KC-135 Stratotanker:

Catégories: Defence`s Feeds

GAO: Army’s Patriot Upgrade Needs More Oversight | Beijing to Boost Missile Def Due to THAAD | Datron World Comm to Provide $495M in Radio & Support to Afghanis

mer, 31/08/2016 - 01:58
Americas

  • The Government Accountability Office (GAO), Congress’ watchdog, has stated that it wants more oversight into the Army’s Patriot upgrade. With $1.8 billion in funding allocated for the next five years, the GAO stated that the service’s plan, which is expected to remain in operation until at least 2050, lacks oversight mechanisms as the Army carries out its strategy in the coming years. Congress has consistently taken issue with what it sees as the Army’s inability to estimate the cost of the system in future years, and has regularly withheld funds to upgrade portions of the system, demanding the Army provide more clarity to its plans before shelling out all of the requested cash to fund it.

Middle East North Africa

  • Israeli firm Rada Electonic Industries are to provide radars as part of the US Army’s Iron Curtain close-in active protection system (APS). The US DoD gave approval to Virginia-based defense solutions company Artis for the use of two Israeli Compact Hemispheric Radar-based RPS-10 radars “to support Artis’ active protection against rocket-propelled grenades (RPG) and other shoulder-launched threats.” Optimized to detect fire from RPGs and anti-tank guided missiles, the compact, multi-mission Rada radar has been validated dozens of times in live-fire tests of another hard kill system, the Israeli-developed Iron Fist by state-owned IMI Systems.

Europe

  • Heckler & Koch are to provide a $14 million shipment of G-36 rifles and 40mm under-barrel grenade launchers to the Lithuanian Army in the Baltic nation’s latest round of defense procurements. The company was dropped as Germany’s main rifle supplier last year following criticisms that the G-36 was unable to shoot straight in hot conditions. But with winter fast approaching and relations between Russia and its former-Soviet neighbors continuing to frost, it doesn’t seem to be too much of a concern for Vilnius (Lithuania).

  • Russia’s VPK has announced the introduction of their own life-size remote control 4×4 based on their armored Tigr vehicle. Fitted with a a combat module and a 30-mm automatic gun, the unmanned Tigr can move and fire via an operator’s commands and can also identify and track targets on its own. Since its introduction in 2006, the Tigr has been spotted in Syria and has even gained attention from King Abdullah II of Jordan.

  • A Swiss Air Force jet has gone missing, according to military officials. The F/A-18C, disappeared on Monday afternoon during a routine training mission. According to Defense Ministry sources, the suspected accident site in the mountainous Alpine region was difficult to access, with bad weather and darkness hampering the search efforts.

Asia Pacific

  • In response to THAAD coming to South Korea, Chinese Communist Party mouthpiece the People’s Daily reports on Beijing’s plans to boost their missile defense capabilities. A PLAAF spokesperson made the announcement Monday, indicating that such an increase would be a solid step in increasing national security. Monday also saw the US Missile Defense Agency (MDA) award Lockheed Martin a $19 million contract modification for the production of two additional Lot 8 interceptors for THAAD. The modification to the previously awarded contract increases the total value to $916 million.

  • Datron World Communications has been awarded a $495 million contract to provide the government of Afghanistan with radios and support equipment. The US Army deal is expected to be completed by August 2021. Datron provides an array of HF and VHF military voice and data radio products, rapidly deployable IP networking solutions and vertical take-off and landing drone systems with customers in over 80 countries.

  • Three Taiwanese Naval officers have been indicted in relation to last month’s accidental firing of an HF-3 supersonic anti-ship missile. The mishap resulted in the destruction of a fishing vessel and the death of its captain. Petty Officer Second Class Kao Chia-chun was charged with negligence and causing the captain’s death while Kao’s supervisor, Chief Petty Officer Chen Ming-hsiu, and the ship’s weapon systems officer Lt. Hsu Po-wei were indicted for neglecting their duties.

Today’s Video

Remote control Tigr firing tests:

Catégories: Defence`s Feeds

US Army Developing New 155mm Extended Range Artillery Rounds | Russian Satellite Jamming System Operational | Boeing to Upgrade NZ’s P-3K2 Orions

lun, 29/08/2016 - 01:58
Americas

  • A new 155mm artillery round with extended range is being developed by the US Army. Initial low rate production of the XM1113 Insensitive Munition High Explosive Rocket Assisted Projectile (XM1113 RAP) is expected to commence in 2022, and is due to replace the aging M549A1 rounds first produced in the 1970s and 1980s. The XM1113 program is a joint development between the Armament Research, Development and Engineering Center and the Program Executive Office Ammunition.

  • Canada’s government has announced the purchase of RQ-21A BlackJack UAVs in a $14.2 million foreign military sale (FMS). Included in the package are five unmanned aircraft, two ground control stations and one launch and recovery system. This marks the first sale of the system outside of the US Navy and will join the Canadian Army as part of its Land Force Intelligence, Surveillance, Target Acquisition and Reconnaissance program.

Europe

  • Russia’s new satellite navigation jamming system, dubbed POLE-21, is now operational. Newspaper Izvestiya made the announcement following a statement from the Russian MoD. POLE-21 is capable of disrupting signals from GPS, GLONASS, Galileo and Beidou in the 1176.45-1575.42 MHz frequency. It is installed on cell phone towers and covers a radius of 80km.

  • Ukrainian firm Antonov has cleared the An-178 for production. So far, the plane has clocked more than 160 hours in its development program over 100 flights and the manufacturer expects orders to reach 200 aircraft by 2032. The An-178 aircraft was developed on the basis of the An-158 passenger plane and is designed to replace the An-12 transport plane. It is able to carry up to 18 tonnes of cargo, including large-sized 1C containers.

Asia Pacific

  • The Afghan Air Force has received its final batch of four MD-530 Cayuse Warrior helicopters. Unlike the previous delivery of five, the latest units are equipped with rocket and .50 caliber firing capabilities. This brings to 27 the number of Cayuse warriors now operated by the AAF, who often engage in providing aerial escort to convoys, providing over-watch to ANDSF operations and responding to “troops in contact” situations.

  • Indonesia has been offered three US-2 amphibious planes by Japan. The offer would see a deal valuing the aircraft at $100 million each with discussions between Jakarta and Tokyo ongoing. The seaplane has also been sold to India, who previously ordered 18 to aid in monitoring and rescue missions based out of the Nicobar and Andaman Islands.

  • French shipbuilder DCNS has been warned to beef up its security measures by Australian defense officials following a massive leak at the company. DCNS had just previously been contracted to build a fleet of submarines for Canberra, valued at $38.13 billion. In response, DCNS said that the leak, which covered details of the Scorpene-class model, and not the vessel currently being designed for the Australian fleet, bore the hallmarks of “economic warfare” carried out by frustrated competitors.

  • Boeing has been tapped by New Zealand to conduct upgrades on their P-3K2 Orions. The $26.06 million deal will see Boeing replace aging, less reliable systems on the Orions, allowing the country to re-instate its anti-submarine warfare capability. New Zealand’s Orions have been in service since 1966, with five aircraft originally delivered as P-3Bs, and then upgraded in the 1980s to P-3K standard. A subsequent upgrade saw them designated as P-3K2s.

Today’s Video

GoPro Footage from the MiG-29 SMT:

Catégories: Defence`s Feeds

Military, Again: Afghan AF Picks, Arms MD-530 Helicopters

lun, 29/08/2016 - 01:55
Afghan MD-530F
(click to view full)

In March 2011, MD Helicopters, Inc. in Mesa, AZ won a competition for the Afghan Air Force that could reach as many as 54 helicopters over the life of the 4 year contract, giving it an implicit value of up to $180 million. Discussions with MD Helicopters confirmed that these are MD 530Fs, designed for high altitude and/or hot weather operations, where thinner air costs helicopters some of their lift.

The MD 530F uses Rolls Royce’s 650 shp 250-C30 engine, instead of the 500E’s 450-shp 250-C20R. That drives a 5-bladed set of main-rotor blades that have been extended 6 inches, along with lengthened tail rotors on a correspondingly longer tail boom. In a typical working configuration, at a design gross weight of 3,100 pounds/ 1,406 kg and a useful load of over 1,509 pounds/ 684 kg, it can hover out-of-ground effect at 11,600 feet/ 3,536m (ISA + 20°C). An optional cargo hook is rated for 2,000 pounds/ 907 kg, and the helicopter also has a flat aft cargo compartment floor for internal loads. These may be training helicopters, but they can be repurposed for light utility tasks. MD Helicopter designs are not unknown in the military market.

MD’s Military Rise, Fall… and Rise? Israeli MD 500
(click to view larger)

Hughes’ OH-6 Cayuse/”Loach” was legendary as a light utility helicopter and gunship. OH-6s still serve with some militaries, their AH-6J/M “Little Bird” descendant is still used as a light gunship by US Special Forces’ 160th SOAR, and the MD500/530 Defender series of light attack helicopters is still in operation around the world in Israel, South Korea, and elsewhere.

The purchase and breakup of Hughes Helicopter into Boeing (AH-64 Apache, AH-6 Little Bird) and MD (civilian helicopters) badly hurt this helicopter family’s global momentum and presence, as Boeing chose to focus on the AH-64 Apache as its military offering. After its 2005 purchase and recapitalization by Patriarch Partners, MD tried to re-enter the light military segment, but losses in the US Army’s ARH armed reconnaissance and LUH light utility competitions left them still looking for a new military foothold.

Military MD-530F
(click to view larger)

While Mexico’s Navy uses the innovative MD Explorer, whose quieter NOTAR rotorless tail design sharply lowers the advance warning given to its targets, other military export orders have been slim. The Afghan order could reverse that trend, and the fleet will now be used well beyond the primary trainer role, re-establishing MD Helicopters as a global competitor in the light utility space.

MD-530G

MD Helicopters has a July 2010 Memorandum of Understanding with Boeing for the AH-6i Light Attack Helicopter [PDF], which has been selected by Jordan and bought by Saudi Arabia. At the same time, the firm is developing their own MD-530G armed scout variant, and the Afghans have given them a contract to apply the upgrade to their fleet.

MD-530G modifications begin with upgraded landing skids that can handle 3,750 pounds maximum weight. A Rhode & Schwarz M3AR tactical radio, Robertson fuel system, and Kinetic Defense ballistic armor panels follow. Mission equipment includes L-3 Wescam’s MX-10 day/night surveillance & targeting turret, and MACE Aviation’s Extended Range Weapons Wing (ER2W) with up to 4 weapon stations, linked to a MOOG Storage Management System (SMS) and other required electronics. Initial weapon options will involve Dillon Aero’s multi-barrel M134D-H 7.62mm Minigun on the inside 2 hardpoints. Possibilities for the wingtip hardpoints include FN Herstal’s HMP-400 12.7mm Heavy Machine Gun Pod (400 rounds), FN’s RMP 12.7mm Rocket Machine Gun Pod (250 rounds + 3 rockets), or 7-shot 70mm rocket pods. Raytheon’s laser-guided 70mm TALON rockets can be carried on FN’s RMP, or in Arnold Defense’s M260 pod.

MD’s main global competitors are armed variants of the Bell 407, variants of Eurocopter’s EC145 and EC635 – and for advanced militaries, armed VT-UAVs like Northrop Grumman’s MQ-8 Fire Scout.

Contracts & Key Events Afghan MD-530Fs

August 29/16: The Afghan Air Force has received its final batch of four MD-530 Cayuse Warrior helicopters. Unlike the previous delivery of five, the latest units are equipped with rocket and .50 caliber firing capabilities. This brings to 27 the number of Cayuse warriors now operated by the AAF, who often engage in providing aerial escort to convoys, providing over-watch to ANDSF operations and responding to “troops in contact” situations.

January 14/16: MD Helicopters are to manufacture and deliver twelve more MD 530F Cayuse Warrior Scout Attack helicopters to the Afghan Air Force. The addition will add to the twelve already in use by the air force. The previous 2015 order saw the aircraft delivered and operational within nine months, and have already seen successful operational duty. Five training variants are also in use and have been upgraded to the Cayuse configuration. The order adds to the gradual increase in participation by the Afghan Armed Forces in running and conducting their own security operations under the eye of the US.

September 28/15: Afghan pilots flying the country’s recently-operational MD-530 helicopters have expressed criticism of the Cayuse Warrior aircraft, citing a lack of range and jamming of the twin .50 cal machine guns installed through a contract last October. The mountains bordering the helicopters’ Kabul operating base are posing a challenge for the small helicopters, with the thin air reducing lift, limiting effective range and placing Taliban operating areas out of reach.

August 13/15: Afghanistan’s armed MD-530 helicopters have been used in combat for the first time, reports indicated on Wednesday. The Afghan Security Forces announced in July that the helicopters would be equipped with rocket pods to complement .50 cal machine guns. MD Helicopters was awarded a contract in March 2011 for the first six helicopters, with an additional order for a further twelve announced in September 2014.

Oct 8/14: Investigation. The Associated Press reports that the US Dept. of Justice Department is looking into allegations that a former Army Colonel gave MD Helicopters inside information to help them win key foreign contracts that restored their offerings to the global military market. Meanwhile, the contracts remain valid.

“(Retired Col. Bert) Vergez provided [main MD investor Lynn] Tilton with details about upcoming contracts to give her company an advantage over the competition, according to internal company documents obtained by the AP and interviews with people knowledgeable of the investigation but not authorized to discuss the matter…. [his] hiring by Tilton so quickly after hanging up his uniform may have violated rules requiring that federal officials wait a year or more before receiving compensation from a company they dealt with while working for the government…. Vergez, who is no longer employed by MD Helicopters or Patriarch Partners, did not return emails and telephone calls seeking comment.”

Former MD Helicopters employees Philip Marsteller and Robert Swisher have also filed a civil suit against Vergez, Tilton and MD Helicopters / Patriarch Partners under the Federal False Claims Act, a whistleblowing law whose “qui tam” provisions would allow them to receive 10-30% of any judgement rendered. Their claim says that they warned the company that the hiring would be illegal, and notes their concern over the “level of Col. Vergez’ subservience to Tilton and his continuing involvement in MD’s Army contracts.” Sources: US Dept. of Justice, “The False Claims Act: A Primer” [PDF] | AP Big Story, “Company wins new contracts despite federal probe”.

Oct 1/14: Arm 17. MD Helicopters, Inc. in Mesa, AZ receives a maximum $44.2 million firm-fixed-price, unfinalized contract for the Afghan Air Force, to arm 17 of their MD-530F helicopters. The fleet order for enough MD-530Fs is already in place (q.v. Sept 26/14), and they’ve already created that modification: the MD-530G. $21.7 million is committed immediately.

The MD-530G is the right kind of helicopter to make a difference on Afghanistan’s battlefield, in an environment where the Afghan military is doing most of the fighting. Can they keep the helicopters running and supplied with working weapons, pilot them effectively, and hold enough ground to let the MD-530Gs work? Time will tell.

Work will be performed in Mesa, AZ with an estimated completion date of Sept 29/15. One bid was solicited with 1 received by US Army Contracting Command at Redstone Arsenal, AL (W58RGZ-14-C-0081). See also AIN, “MD Helicopters To Supply ‘Cayuse Warrior’ for Afghan Force”.

Arm them

Sept 26/14: MD Helicopters, Inc. in Mesa, AZ receives a $35.7 million firm-fixed-price contract modification, exercising an option for 12 more Afghan MD-530F primary trainer helicopters, bringing announced orders to 18. Meanwhile, MD Helicopters has been finalizing its MD-530G armed scout model/ conversion. All funds are committed immediately.

Work will be performed in Mesa, AZ, with an estimated completion date of Sept 29/15. US Army Contracting Command in Redstone Arsenal, AL is the contracting agency. The contract was announced on this date, but awarded Sept 19/14 (W58RGZ-11-C-0070, PO 0019).

12 more

May 8/12: Sub-contractors. For each new Afghan MD-530F, Cobham Aerospace Communications will supply 4 of its N301A audio controllers; Cobham Antenna Systems will provide VHF communications, VOR/LOC/GS V-Dipole, DME, and Navigation Splitter Antennas; and Cobham Commercial Systems will supply an Artex C406-2HM emergency locator transmitter. Cobham plc [PDF] | Arabian Aerospace.

Feb 21/12: A US Army article discusses the training process and personnel involved in the MD-530F effort.

Sept 13/11: MD Helicopters, Inc. presents the first 3 Afghan MD-530Fs to the U.S. Army, as part of the Rotary Wing Primary Training Aircraft-Afghanistan Program.

Sept 7/11: MD Helicopters, Inc. in Mesa, AZ receives a $14.2 million firm-fixed-price contract modification to provide logistics support and flight training devices for the Afghan Air Force’s MD 530Fs. Work will be performed in Shindand, Afghanistan, with an estimated completion date of March 31/16. One bid was solicited for this, with one bid received by U.S. Army Contracting Command in Redstone Arsenal, AL (W58RGZ-11-C-0070).

AAF

March 14/11: MD Helicopters, Inc. in Mesa, AZ wins an initial $19.9 million firm-fixed-price contract for 6 new primary training helicopters, 2 corresponding flight training devices, and critical spare parts for the Afghan Air Force.

That initial order could reach as many as 54 helicopters over the life of the 4 year contract, giving it an implicit value of up to $180 million. Work will be performed in Mesa, AZ with an estimated completion date of March 31/16. The U.S. Army Contracting Command at Redstone Arsenal, AL solicited 9 bids, with 4 bids received (W58RGZ-11-C-0070).

First 6 helicopters and infrastructure

Readers with corrections, comments, or information to contribute are encouraged to contact DID’s Founding Editor, Joe Katzman. We understand the industry – you will only be publicly recognized if you tell us that it’s OK to do so.

Catégories: Defence`s Feeds

More Holdups on F-35 Program | Russia Making Major Investments in Naval Ships, Bases | North Korea’s SLBM Reaches Japan’s ADIZ

ven, 26/08/2016 - 01:56
Americas

  • Issues with weapons integration on the F-35 have been found and could hinder an operational capabilities declaration, according to the Pentagon’s director of operational test and evaluation (DOT&E) . Challenges include the possibility, when the jet fires its 25mm cannon, that the aircraft could yaw as the gun door opens, reducing accuracy. Testing last December also threw up issues with AIM-9X missiles on the F-35C. Here testers found excess stress on the carrier-variant’s wing structure during landings and certain maneuvers. This could have an impact on the wing structure and might warrant a redesign on that part of the wing.

  • $313 million is the price that Canada would have to pay if it is to exit from the F-35 Joint Strike Fighter program. The calculations were made by the Liberal government, and accounts for the difference of what Ottawa had contributed so far since 2006 and the $551 million it pledged to commit when it enrolled into the program. A Canxit from the program could occur with just 90 days written notice given to other partner nations.

Middle East & North Africa

  • Kazakhstan and Israel have come to an agreement over the provision of UAV systems. While the exact nature of the deal remains unknown, it is believed that Kazakhstan will acquire an undisclosed number of medium-altitude, long-endurance platforms such as the Israel Aerospace Industries Heron 1 and Elbit Systems Hermes 450. Early deliveries will see completed systems come straight from Israel, but long term plans will see an assembly facility open in the Kazakh capital, Astana.

Europe

  • Russian efforts to improve their capabilities in combatting terrorism have seen their Navy receive unprecedented funds to be invested in the construction of new ships, bases and infrastructure. In the decades following the collapse of the Soviet Union, Russian naval modernization stagnated, and efforts are only now being raised to improve their aging fleet. Naval bases will also get a major upgrade in order to better accommodate the new vessels.

  • Leaked documents in relation to a new naval submarine for the Indian Navy were stolen from French manufacturer DCNS. The French government made the statement; adding that the information so far showed only operational aspects of the submarines. Both France and India have downplayed the security risk of the leak which has caused concerns over the future of a recently agreed upon $38 billion deal with Australia.

Africa

  • Thales UK is now operating three Hermes 900 as part of the United Nations (UN) Multidimensional Integrated Stabilisation Mission in Mali. A three year contract had been signed back in December and holds options for a further two years. The contract covers the deployment of three aircraft (two for operational duties, the third as a spare) with two control stations and flight crews to enable the simultaneous use of both aircraft.

Asia Pacific

  • A North Korean submarine-launched ballistic missile (SLBM) has flown 500km towards Japan. Wednesday’s test marks a growing improvement in North Korean missile capabilities, with sources believing the SLBM could potentially reach 1,000km when fired from a normal trajectory. Pyongyang’s push to increase its offensive missile threats also include claims that it has miniaturised a nuclear warhead to fit on a ballistic missile, but outside experts have said there is yet to be firm evidence to back up the claim.

  • An Asian military has ordered an undisclosed but significant number of RADA Electronic’s Multi-Mission Hemispheric Radar (MHR) based RPS-42 aerial surveillance radar systems. Delivery of the systems is expected to be completed by mid-2017, and the company stated that the sale will generate significant income for profits in both 2016 and 2017. The customer selected the system after a thorough and competitive evaluation process in comparison to various other competing radar systems.

Today’s Video

GoPro Footage from the MiG-29 SMT:

Catégories: Defence`s Feeds

Starry Eyed: Elbit’s Hermes 900 MALE UAV

ven, 26/08/2016 - 01:52
Hermes 900
(click to view full)

Elbit Systems has enjoyed considerable domestic and export success with its Hermes 450, which sits at the smaller end of the MALE (Medium Altitude, Long Endurance) UAV spectrum. As UAVs proved themselves, Elbit wasn’t interested in ceding the market for larger and more capable MALE UAVs to the likes of IAI and General Atomics.

They invested company funds to create the larger Hermes 900, but those kinds of investments eventually need a buyer. In 2010, their home country of Israel stepped up, and became the anchor buyer for the “Kochav” (“Star”). They weren’t the last. A comparison with the popular Hermes 450 is instructive…

Hermes 450 vs. Hermes 900 Hermes 450
(click to view full)

The Hermes 450 is a common medium surveillance UAV, with a 10 m wingspan and a maximum take-off weight of 550 kg/ 1,212 pounds. The 450 offers about 17-20 hours endurance at up to 18,000 feet altitude, and about 180 kg/ 396 pounds of payload capacity via up to 2 body mountings and optional wing pylons. Satellite communications can be attached, but it requires changes to the aircraft body.

It serves in Israel as a dual surveillance/attack UAV, where it has reportedly been modified to carry fuel tanks, or up to 2 RAFAEL Spike missiles. It also serves unarmed with a number of international customers, including Azerbaijan, Brazil, Georgia, Mexico, Singapore, and the US Border Patrol; and with Britain as the Watchkeeper WK450B ISTAR (Intelligence, Surveillance, Target Acquisition and Reconnaissance) UAV.

Hermes 900
(click to view full)

The Hermes 900 offers a larger platform, whose 15m wingspan and 1,180/ 2,204 pound maximum takeoff weight is comparable to the MQ-1 Predator, or to Israel Aerospace Industries’ popular Heron family. Compared to the 450, it offers a higher flight altitude of up to 30,000 feet, with a longer flight time of up to 30-36 hours, and a 350 kg/ 772 pound payload capacity that’s about double the 450’s.

The Hermes 900 incorporates an Internal Auto Takeoff and Landing system that enables auto-landing even on alternate non-instrumented runways, and has advanced features including built-in autonomous emergency procedures, Air Traffic Control radio, radio relay, and an IFF (Identification, Friend or Foe) transponder. Satellite communications can be installed for additional control range.

Payloads can include the SELEX Gabianno T-200 X-band SAR/GMTI and MPR land and maritime surveillance radar, the DCoMPASS surveillance and targeting turret, AES 201V ESM/ELINT signal interception and location equipment, the Skyfix/ Skyjam–COMINT/DF communication snooping & optional COMJAM jamming system, or a Communications relay for friendly troops. A maritime configuratoin can add an Automatic Identification System (AIS) to ID compliant ships, Communications relay that lets the operator ‘talk through’ to vessels at sea, and Windward Ltd.’s MarInt satellite-based maritime intelligence analytic system.

Known customer nations to date include Israel, Brazil, Chile, Colombia, and Mexico. Elbit actually claims 8 total customers, leaving the missing service branches or countries unclear.

Both the Hermes 450 and Hermes 900 are controlled by Elbit Systems’ Universal Ground Control Station, which can control 2 UAVs at any given time from a single station, with a single operator.

Contracts & Key Events 2014-2016

Order from Brazil; Switzerland picks Hermes 900; Hermes 900 becomes a Star. Swiss testing
(click to view full)

August 26/16: Thales UK is now operating three Hermes 900 as part of the United Nations (UN) Multidimensional Integrated Stabilisation Mission in Mali. A three year contract had been signed back in December and holds options for a further two years. The contract covers the deployment of three aircraft (two for operational duties, the third as a spare) with two control stations and flight crews to enable the simultaneous use of both aircraft.

April 5/16: Elbit Systems has signed a number of joint venture agreements with Indian companies in order to offer its UAV systems to the country’s market. Adani Aero Defence and Alpha Design Technologies are to co-operate with the Israeli UAV giant to offer their Hermes 450 and Hermes 900 UAVs to the Indian armed forces. The agreement will see local manufacture at a production facility in India for the airframes and payloads, and meets the terms of the government’s “Make in India” policy that encourages foreign investment and partnership with Indian industry.

November 27/15: Switzerland is to buy six Hermes 900 Heavy Fuel Engine (HFE) UAVs from Elbit Systems in a deal worth $200 million. The delivery of the UAVs is expected to be completed by 2020 when the current UAVs in service are retired. The Hermes are thought to provide a considerable increase in the capability of the Swiss Air Force, who currently operate the Ruag Aerospace ADS 95 Ranger for their reconnaissance and surveillance needs. The Hermes saw extensive action during Operation Protective Edge in Gaza last year as well as being used by Brazil when it hosted the World Cup.

September 29/15: Israel’s Elbit Systems has been awarded a $70 million contract by an undisclosed Latin American buyer for the Hermes 900 UAV system. The company was awarded a similar contract in June 2011, also to an undisclosed customer in the region, with the Swiss parliament approving the $250 million acquisition of six Hermes 900 UAVs earlier this month.

June 6/14: Switzerland. The Swiss UAS 15 program picks the Hermes 900 with a heavy fuel engine over IAI’s Super Heron-1, while stressing that their UAVs will remain unarmed. The UAS 15 program has a budget of SFR 250 million (about $280 million), and it will be submitted as part of Switzerland’s 2015 armaments program bill. This isn’t a contract yet, and there won’t be one until the money is approved. The Swiss government confirms that the purchase will involve:

“1 system with 6 drones including sensors, ground components, logistics package, training resources and training.”

The Hermes 900 HFEs will replace Switzerland’s ADS 95 Ranger collaboration between IAI, Oerlikon, and RUAG, which was also exported to Finland. Those tactical UAVs have served since 2000, and the state of the art has moved on since then. Ranger UAVs have an excellent safety record in-country over populated areas, but after the government’s recent tepid and failed defense of its fighter procurement, we’re going to go out on a limb and predict that this will become a major political issue. Absent a serious defense this time, public antipathy to drones in general could hand the government and defense forces another loss.

IAI and Elbit’s UAVs were short-listed as finalists after pre-testing (q.v. Sept 6/12), but the Swiss say that “Hermes 900 HFE has been favoured because it delivered the better overall result in all assessed criteria” during the full evaluation. Regardless of what happens with the Swiss buy, that will be a positive boost for Elbit’s marketing efforts. Swiss Air Force, “ADS 95 Ranger” | Swiss government, “Armed Forces reconnaissance drone system to be replaced” | Elbit Systems, “Elbit Systems Selected as Preferred Supplier for Swiss UAS program”.

Swiss pick Hermes 900

March 26/14: Elbit Systems Ltd. announces a contract from the Brazilian Air Force (“FAB”) for 1 Hermes 900 system, to be delivered within 2 months and equipped with “a new and advanced intelligence gathering system considered as a breakthrough operational solution.” It will form part of the security measures for the 2014 FIFA World Cup, and will be operated by FAB in combined missions with their existing Hermes 450 fleet, which was bought in 2011.

Elbit’s AEL SYSTEMAS S.A. subsidiary will supply technical and engineering support, as well as spares and maintenance services.

Elbit’s UAS Division General Manager, Elad Aharonson, is quoted in Ha’aretz calling this sale “…the eighth customer to be equipped with this leading platform…”. That indicates no less than 3 unannounced customers, after Israel, Brazil, Colombia, Chile, and Mexico. Note that different armed branches within the same country are counted separately. Mexico’s Federal Police bought the Hermes 900, but if the Mexican Air Force and Navy ever decided to their own ink orders, that would make 3 customers in Mexico. Announcements made so far don’t indicate that sort of thing, but they’ve also been vague, and one can expect them to often be partial. If there are unannounced external sales beyond the core 5 countries, Azerbaijan, Georgia, and Kazakhstan are good places to start the search, and we’d be curious about Nigeria. Sources: Elbit Systems, “Elbit Systems Awarded Contract to Supply Brazil with Hermes 900 UAS” | Ha’aretz, “Israel’s Elbit System wins contract to supply Brazil with Hermes 900 drone”.

Brazil buys

March 20/14: Kochav. Israel gives the Hermes 900 a name: Kochav (Hebrew for “Star”). Sources: IAF, “A Star Is Born: A Name Is Chosen For the “Hermes 900″ UAV'”.

2012 – 2013

Orders from Israel, Colombia & Mexico; Maritime patrol configuration introduced. Hermes 900-MP
(click to view full)

Oct 7/13: Chile. The Chilean Navy is reportedly evaluating the Hermes 900 for maritime patrol tasks. The UAV already serves with the Chilean Air Force (FACh). Sources: Flight Global, “Chilean navy considers Hermes 900 deal”.

Feb 6/13: Maritime. At Aero India 2013 in Bangalore, Elbit Systems launches a Hermes maritime configuration. It includes the SELEX Gabbiano T200 radar (q.v. June 27/11), an Automatic Identification System (AIS) to ID compliant ships, radio relay that lets the operator ‘talk through’ to vessels at sea, and Windward Ltd.’s MarInt satellite-based maritime intelligence analytic system. Sources: AIN, “Elbit Takes New Orders for Hermes 900, Develops Maritime Version of UAS” | Defense Update: “Hermes 900 Takes on Maritime Missions”.

Jan 27/13: Israel. Elbit Systems announces a $35 million contract from the Israel Ministry of Defense to develop “advanced features for Unmanned Aircraft Systems (“UAS”) to be supplied within three years. One of the mission requirements is the quick re-configuration of the UAS’ payloads.”

This isn’t as specific as one would like, but the rest of the release focuses exclusively on the Hermes 900, and links this contract to the Dec 31/12 announcement.

Dec 31/12: Israel. Elbit Systems announces $315 million in contracts from Israel, including $90 million for more Hermes 900 UAS, to be supplied within 3 years, and 8 years of maintenance services.

Another $25 million funds “advanced observation and long-range target acquisition systems… to be supplied over a three-year period.” No word on whether they’re air, land, or sea systems.

Israeli follow-on order, and platform R&D

Sept 6/12: Switzerland. Out of the 11 systems made by 9 companies that were originally in the running for Switzerland’s UAS contract, IAI’s Heron-1 and Elbit’s Hermes 900 are the finalists. In-flight evaluations will take place in September and October 2012 from the Emmen airbase, over central Switzerland and in the Jura region. Hermes 900 flights end on Oct 19/12.

The chosen UAV will replace an older Israeli UAV, the Ranger from RUAG, Oerlikon, & IAI. Sources: armasuisse, “Evaluation ADS 15” | UAS Vision, “Hermes 900 and Heron 1 in Final Flight Tests for Swiss Air Force Contract”.

Aug 5/12: Colombia. Elbit announces yet another Latin American customer. This sale involves Hermes 450 and 900 unmanned aircraft systems (UAS) to “a Latin American customer.” The buyer is later identified as Colombia, while Elbit’s own release confirms its 1st export sale as Chile.

Elbit said the contract includes the Hermes Universal Ground Control Stations (UGCS), Elop’s DCoMPASS surveillance turrets, and satellite communication systems that allow the UAVs to operate over remote areas. Deliveries will be made over the next 2 years. Elbit Systems | Israel’s Arutz Sheva | Asian Defense News | Flight International.

Colombia buys 450s and 900s

Jan 3/12: Mexico. Israel’s Elbit Systems announced a $50 million contract to supply Hermes 900s to:

“…a governmental office of a country in the Americas. The UAS will be operated in a variety of perimeter security missions…. The contract includes Universal Ground Control Stations (UGCS) and a variety of payloads and capabilities including: the Electro-Optics Elop Division’s advanced payloads systems, the Elisra Division’s intelligence COMINT systems, SAR/MPR multi mode radar and additional sensors.”

Some sources claim Colombia as the destination, but that turns out to be a subsequent order. The buyer is later identified as Mexico’s Federal Police. Elbit Systems | Aviation Week | Defense Update.

Mexico Federal Police

2007 – 2011

From unveiling to orders from Israel & Chile; Radar picked. Israeli Hermes 900
(click to view full)

June 27/11: Radar. Elbit Systems has picked Selex Galileo’s Gabbiano-series X-band surveillance radars for the Hermes 450 and Hermes 900. The Hermes 450 will get the 43kg T20 radar, while the Hermes 900 will carry the more powerful 62kg T200 for land and maritime surveillance. defpro | Flight International.

June 6/11: Chile. Elbit Systems announces its 1st export sale for the Hermes 900 UAV, plus ground control, DCoMPASS surveillance systems, and an unidentified radar system, to “a customer in Latin America.”

Other press sources point to Chile, which had already chosen the Hermes 900. The 2010 earthquake demonstrated the need for advanced, rapid response, long endurance aerial surveillance systems. In response, Chile’s competition looked at 4 Israeli UAVs: Elbit’s Heron 900 and IAI’s Heron at the high end, and the Hermes 450 and Aeronautics DS Aerostar at the low end. Defense Update.

1st export: Chile

May 18/11: Chile. Flight International reports that Elbit Systems’ Hermes 900 has been picked over IAI’s Heron-1 by the Chilean defence forces.

Jan 10/11: Testing. Elbit Systems’ 1st Hermes 900 UAV has accumulated 350 flight hours, while its 2nd prototype will soon enter flight testing.

A follow-on order from Israel is expected within the framework of the nation’s next multi-year plan. Flight International.

May 5/10: Israeli order. Elbit Systems of Haifa, Israel announces a 3-year, $50 million contract to supply the Israeli Defence Forces with its brand new Hermes 900 systems, along with additional Hermes 450 UAVs. The contract also includes “enhancement of [the IDF’s] existing UAS intelligence capabilities,” which presumably means sensor improvements and extensions.

The award continues ongoing contracts from Israel, including a $30 million contract for Hermes 450 systems in November 2007. Elbit release | Globes | Aviation Week | Defense Update | Flight International.

1st order: Israel

Dec 14/09: Testing. Elbit Systems announces that its Hermes 900 UAV has completed a successful Maiden Flight, and will enter serial production following additional flight tests.

April 1/09: Flight delays. Elbit Systems unveiled the Hermes 900 in mid-2007, but the UAV’s 1st flight has been delayed. The firm is reportedly accelerating efforts to make that flight before the end of 2009, so potential customers can evaluate the design. Flight International.

June 12/07: Elbit announces its Hermes 900 UAV offering, which will share ground control infrastructure with the smaller Hermes 450. Defense Update.

Additional Readings The UAV

Ancillary Systems & Payloads

  • Elbit Elisra – AES-201/V. ELINT and ESM system. Podded on the Hermes 900.

  • Elbit Systems of America – DCOMPASS. Day/night surveillance and targeting turret.

  • SELEX ES – Gabbiano Multi Mode data sheet [PDF].

  • Windward Ltd. – MarInt – Predictive Maritime Analytics.

  • Elbit Elisra – Sky Fix. COMINT system, podded on the Hermes 900.

  • Elbit Elisra – Skyjam. Communications jamming, built for each platform out of customizable, interoperable and interconnected airborne COMJAM payload components.

Catégories: Defence`s Feeds

Raytheon Wins $92M for EASR from US Navy | US Army Gives a Boost to GE’s T700 Engine Replacement | NK Threat Kicks off US-South Korean War Games

jeu, 25/08/2016 - 01:58
Americas

  • Raytheon has been awarded a $92 million US Navy contract for engineering and manufacturing development of the Enterprise Air Surveillance Radar (EASR). The deal includes options which, if exercised, would bring the cumulative value of the contract to $723 million. A 2015 US Naval Institute report stated that EASR will be deployed on the future USS John F. Kennedy, the second Gerald R. Ford-class aircraft carrier that is set to debut in 2020.

  • The US Army awarded a series of contracts as part of the preliminary design review for the replacement of General Electric’s T700 engine. General Electric and Advanced Turbine Engine were awarded $102 million and $154 million contracts respectively, with the winner getting to provide engines for a wide variety of military helicopters including the UH-60 Blackhawk and AH-64E Apache. The Improved Turbine Engine Program (ITEP) plans to deliver an engine early in the next decade that will replace the T700 with a new design that delivers more power and consumes less fuel, yet fits into the same space reserved for current engines.

  • Following the Twitter reveal of the Northrop Grumman & BAE offering to the USAF’s T-X trainer competition, Boeing and Saab’s clean sheet design was revealed on Boeing’s website. With two engine inlets, a high mounted wing and a conventional, vertical tail, the design is a step away from its T-45 Goshawk used by the US Navy. Things are hotting up.

  • After much waiting, trial and error, the F-35’s Block 3F software upgrade has speeded up testing of the new fighter’s weapons systems. Since it’s completion, Lockheed Martin has completed 30 weapons delivery accuracy tests in one month, compared to just three accomplished with the Block 2 software. These include Boeing’s Joint Direct Attack Munition (JDAM) and GPS-guided Small Diameter Bomb, and Raytheon’s AIM-120 AMRAAM and AIM-9X Sidewinder.

Middle East & North Africa

  • The US State Department has approved the sale of Mark V fast patrol boats, weapons, ammunition and training to Qatar in a $124 million defense package. Used by US Special Operations Forces for insertion and extraction of SEAL combat swimmers, the vessels will be equipped with .50-caliber machine guns, MLG 27mm naval gun systems and Forward Looking Infrared (FLIR) Systems.

  • An inquiry into a leak of sensitive technical information of France’s Scorpene attack submarine is being planned by the French government. The leak surfaced in a report by an Australian newspaper who received 22,400 pages of ship builder DCNS’s company data on the six Scorpene boats it’s constructing for the Indian Navy. The company fears that such a leak may harm the company’s deal with Australia to design and build the Shortfin Barracuda A1 diesel-electric submarine.

Europe

  • Russia’s latest armored tank, the T-14 Armata, is to be equipped with additional protective armor in order to better defend it in urban operations. Developed by the Russian Research Institute, “plate shields,” which are similar in appearance to the bars on metal bunk beds, will be installed along the perimeter of the machines giving additional protection to the platform’s wheels and tracks. The Russian Army plans to acquire 2,300 of the tanks by 2020.

Asia Pacific

  • The annual US-South Korean war games kicked off this week in what has been a year of growing diplomatic tension on the peninsula. The Ulchi Freedom Guardian exercise will run until September 2 and involves some 50,000 US troops stationed in South Korea. In response, the The North called the exercises preparations for invasion, and early on Monday threatened a pre-emptive nuclear strike that did not occur. The last number of months has seen increased North Korean missile testing, the deployment of THAAD systems in the South and most recently, the defection of the North Korean ambassador to the UK. What’s next?

Today’s Video

The T-14 Armata:

Catégories: Defence`s Feeds

GE Wins Multi-Year Extension for T700 Engine Family

jeu, 25/08/2016 - 01:55
T700 engine
(click to view full)

GE’s T700 family powers a number of helicopters, from Army UH-60 Black Hawk and AH-64 Apache helicopters to the USAF’s HH-60 Pave Hawks, naval SH/MH-60 Seahawks, and even the US Marines’ H-1 Hueys and AH-1 Cobras.

In 2004, the US military placed a multi-year production contract to cover engines and spares for its H-60 family helicopters, covering up to 1,200 engines. That contract has now been extended to cover up to 4,900 T700-401C (Coast Guard HH-60J, Navy SH-60/MH-60 Seahawks), T700-701D (UH-60A/L/ early-build M), and T700-701E (new UH-60M) engines for the US Army and Navy through 2014. Each helicopter requires 2 engines…

Contracts and Key Events

MH-60S, giving a lift
(click to view full)

August 25/16: The US Army awarded a series of contracts as part of the preliminary design review for the replacement of General Electric’s T700 engine. General Electric and Advanced Turbine Engine were awarded $102 million and $154 million contracts respectively, with the winner getting to provide engines for a wide variety of military helicopters including the UH-60 Blackhawk and AH-64E Apache. The Improved Turbine Engine Program (ITEP) plans to deliver an engine early in the next decade that will replace the T700 with a new design that delivers more power and consumes less fuel, yet fits into the same space reserved for current engines.

September 29/15: The Army has launched its T700 engine replacement competition, with the program set to deliver 3,000 new helicopter engines after production begins in 2019. Two companies will be awarded development contracts for the new engine design, with GE Aviation and a Honeywell/Pratt & Whitney team appearing as the most likely candidates, although Turbomeca could also participate in the competition.

May 11/15: General Electric Aviation was awarded a $2 billion IDIQ contract Friday in part to fulfill a Foreign Military Sale to Taiwan for the company’s T700 engine, with the contract stretching to 2020. The T700 engine family powers a number of US-manufactured helicopters, including the UH-60 Black Hawk, which Taiwan purchased 60 of in 2010. GE Aviation is not unaccustomed to significant contracts, with the company awarded a major multi-year contract extension in 2009. Friday’s contract covers not only the Taiwanese FMS but also US defense and other government agency requirements.

April 14/09: GE announces the 5-year extension of its contract for H-60 family engines, which adds up to 3,700 more engines to the contract.

Under this arrangement, GE will provide new engines to upgrade existing helicopters, and also ship engines for Sikorsky’s manufacturing lines. These order covers T700 series engines for the US Army (UH-60), Navy (SH/MH-60), Coast Guard (HH-60), and foreign military sales (other mentioned, plus S-70). A portion of these engines will also serve as spares for aircraft currently operating in Iraq and Afghanistan.

Their release notes that 3 more orders have been received since September 2008 for a total of 211 more engines, to be delivered between 2009-2011. According to GE, this brings the total number of engines ordered under this contract to 1,704.

Price is not specified, but it’s a firm-fixed price contract, and 293 engines cost $96.2 million (about $328,000 each). As such, the cost if all 3,700 extra engines are awarded would be about $1.215 billion.

Sept 11/08: General Electric Aircraft Engines in Lynn, MA received a $96.2 million order for 293 engines, as part of a 5-year firm-fixed-price contract extension. Deliveries will take place in Q4 2008 and Q1 2009.

Work will be performed in Lynn, MA, with an estimated completion date of Dec 31/14. Since GE is the designated engine manufacturer for H-60 helicopters, one bid was solicited and one bid was received by the U.S. Army Aviation and Missile command (AMCOM) in Redstone Arsenal, AL (W58RGZ-04-D-0037).

Jan 15/04: General Electric Aircraft Engines in Lynn, MA received an $824 million firm-fixed-price, 5-year contract for T700 series helicopter engines to equip US Army, Coast Guard, Navy, and foreign sales H-60 family helicopters.

They also receive the first deliver order: $22.75 million for 74 T700-701C spare engines (incomplete without hydro mechanical control units and digital electronic control units) and 74 containers.

Work will be performed in Lynn, MA, and is expected to be complete by Dec 31/09. since the T700 family are the only engines certified for the H-60 helicopters, this was a sole source contract initiated on June 11/02 by the U.S. Army Aviation and Missile Command in Redstone Arsenal, AL (W58RGZ-04-D-0037).

Catégories: Defence`s Feeds

India’s Project 75 SSKs: Too Late to Save the Submarine Force?

jeu, 25/08/2016 - 01:45
Scorpene cutaway
(click to view full)

India’s submarine fleet currently consists of 16 boats: 10 Russian SSK Kilo (Sindhugosh) Class, 4 locally built SSK U209 (Shishumar) Class, a leased nuclear-powered Improved Akula Class SSN from Russia (INS Chakra), and its own INS Arihant SSBN. Most of the Kilos have been modernized, but readiness rates for India’s existing submarine fleet sits below 40%, and the U209s will have trouble lasting much beyond 2015. With Pakistan acquiring modern submarines, and Chinese submarine building exploding, expanding India’s submarine fleet became an obvious national priority.

In 2005, India confirmed that it would buy 6 Franco-Spanish Scorpene diesel submarines, with an option for 6 more and extensive technology transfer agreements. Unfortunately, 7 years after that deal was signed, “Project 75” has yet to field a single submarine. A poor Indian procurement approach, and state-run inefficiency, are pushing the country’s entire submarine force toward an aging crisis. This DID FOCUS article covers the Scorpene deal and its structure, adds key contracts and new developments, and offers insights into the larger naval picture within and beyond India.

The Scorpene Class Scorpene
click for video

The SSK Scorpene Class diesel-electric fast attack submarine was jointly developed by DCN of France and Navantia of Spain, and incorporates advancements that stem from being developed about 10 years later than DCN’s Agosta 90 Class. Many of the Scorpene’s internal systems and weapons, however, are shared with Pakistan’s Improved Agosta 90B.

Displacing 1,565 metric tonnes, the standard CM-2000 Scorpene Class is 71.7m (219 feet) long with a submerged speed of over 20 knots, and submerged range at 100% battery usage and 4 knots speed of 134 hours or 536 miles. This new submarine class incorporates a high level of system redundancy to achieve an average 240 days at sea per year per submarine, and the endurance to undertake a 50 day patrol before being resupplied. In addition, its maximum diving depth is 300 meters (about 1,000 feet), giving the commander good tactical freedom for a conventional submarine.

SUBTICS CCS

The Scorpene’s SUBTICS combat management system, with up to 6 multifunction common consoles and a centrally situated tactical table, is co-located with the platform-control facilities. The vessel’s sonar suite includes a long-range passive cylindrical array, an intercept sonar, active sonar, distributed array, flank array, a high-resolution sonar for mine and obstacle avoidance and a towed array. Each Scorpene submarine features 6 bow-mounted 533mm torpedo tubes, and stores 18 weapons divided between torpedoes, missiles, and mines (stacked, up to 30).

India was leaning toward Finmeccanica’s Black Shark, the same heavyweight torpedo used in Chile’s Scorpene subs, but that decision has been put on hold by corruption allegations. Fortunately, a contract for the MBDA SM-39 Exocet was signed along with the original submarine contract. The Exocet SM 39 variant is launched from a submarine’s torpedo tubes using a VSM (Vehicule Sous Marin), a self-propelled and guided container that will maneuver before surfacing so as not to reveal the position of the submarine. Once it surfaces, the Exocet missile leaves the VSM and proceeds to the target like a normal surface variant of the missile.

In addition to these regular weapons, the Scorpene platform also offers advanced capabilities for mine warfare, intelligence gathering and special operations.

Scorpene subs can hold a total company of 31-36 men, with a standard watch team of 9. The control room and the living quarters are mounted on an elastically supported and acoustically isolated floating platform, really a ship within the ship.

The India order brought the number of committed Scorpene submarine sales on the international market to 10. Scorpene orders worldwide now sit at 14, and include Chile (2 O’Higgins class CM-2000 with split Navantia/DCN production, both delivered); Malaysia (2 with split Navantia/DCN production); and now India (6 from DCN-Armaris and local manufacture, 3 each CM-2000 and AM-2000 AIP, delivery expected 2015-2020). Brazil would later undertake its own project, which will build 4 SSK Scorpenes and 1 nuclear-powered SSN fast attack submarine.

India’s Submarine Programs

Current Project 75 figures:

  • Submarines: 6 CM-2000 Scorpene Class, #5-6 may have AIP, but that’s unlikely.
  • Contract signed: 2005
  • Schedule: Delivery from 2015-2018. May not even begin until 2017.
  • Cost: INR 235.62 billion

Project 75 had a pre-priced option for 6 more Scorpenes, but India as decided to pursue a follow-on “Project 75i” as a separate program instead. It could field 6 more Scorpenes, or it could field a very different design. The sections below provide more details.

Project 75: Schedule, Cost & Plans Final construction
(click to view full)

The Scorpene deal had simmered on the back-burner for several years, and media reports touted a deal as “close” in 2004, but nothing was finalized until late 2005. The cost had been subject to varying estimates over the life of those multi-year negotiations, and continued to change after the contract was awarded, but the final figure for the first 6 boats is now generally accepted as being about $4.5 billion.

India’s long-term objective is full made-in-India design, development and construction of submarines. Construction is the first step, and “Project 75” Scorpene submarines will all be built in India at state-owned Magazon Docks Ltd. (MDL).

That insistence on local production, rather than having the first couple built at their home shipyard with Indian workers present on exchange, has cost India. There have been issues involving technology transfer and negotiations, but it’s also true that MDL simply wasn’t ready. Expected delivery dates for the first 6 were set at 2012-2017, until everyone had to bow to the obvious and begin promising 2015-2018. Given the record to date, and the difference between schedule slippage of 1st vs. final deliveries, it’s reasonable to expect deliveries stretching beyond 2018. Recent reports are even suggesting that deliveries may not begin before 2017.

Meanwhile, costs are growing.

Planned costs for the Project 75 deal had a range of reported figures, until a contract was signed. In the end, the reported figure was Rs 15,400 crore, or $3.5 billion converted equivalent at the time. Subsequent auditor reports indicated that the program would actually cost about Rs 18,798 crore (about $4 billion), and escalations to Rs 20,798 crore/ $4.38 billion and then Rs 23,562 crore/ $4.56 billion have followed. That makes for about a 25.4% cost increase from the auditors’ baseline.

Tracking actual contracts is more difficult. Contracts signed as of August 2009 totaled INR 207.98 billion/ Rs 20,798 crore. The contracts were signed at different times, and will be paid over different periods, so a true currency conversion is difficult. A weakening American dollar and Euro have cushioned the increases somewhat, but most of the project’s cost involves local currency purchases. Contracts reportedly include:

  • Rs 6,315 crore contract with DCNS’ predecessor for transfer of technology, combat systems and construction design.
  • Rs 1,062 crore contract with MBDA for sea-skimming Exocet missiles and related systems
  • Rs 5,888 crore contract with MDL for local submarine construction
  • Rs 3,553 crore set aside for taxes
  • Rs 2,160 crore for other project requirements
  • Rs 2,000 crore added in March 2010 to cover added finalized costs of the “MDL procured material (MPM) packages”
  • Rs 2,764 crore unaccounted for yet in public releases, but envisaged in final INR 235-237 billion program costs.

Project 75: Industrial Scorpene
click for video

On the industrial front, the Scorpene deal will enable India to reopen its submarine building assembly lines. The initial plan was for all 6 boats to be built entirely in India by Mumbai-based Mazagon Dock Ltd. (MDL), whose submarine lines had been shut down after they finished manufacturing German HDW Type 209 diesel subs in 1994. That plan has remained steadfast, despite delays created by MDL’s work.

The French firm DCNS (Thomson CSF became Thales, which became the Armaris naval JV, then DCNS) was set as the overall industrial prime contractor for this program. DCNS is also in charge of the technology transfer and delivery of all services and equipment, and DCNS subsidiary UDS International will supply the combat systems with help from Thales. An ancillary contract signed between DCNS’ predecessor Armaris and MDL provides for a team of French technical advisers during the construction of the first 2 submarines.

Tracking contract value for foreign firms is challenging.

The key foreign contractors for the Project 75 Scorpene buy are DCNS and Thales, who will provide the “MDL procured material (MPM) packages” of propulsion, sensors, weapons systems etc. that fit into the hull. When the initial contract was signed in 2006, Thales revealed that India’s Scorpene contract was worth nearly EUR 600 million (USD $736 million) to their company, in return for key subsystems for the submarines’ 6 UDS International SUBTICS integrated combat systems, underwater sensors, communications and optronics, and electronic warfare equipment. A corresponding DCN news release put the total value to all members of the DCN Group at EUR 900 million, but did not address possible overlaps with Thales.

Finalized supplier contracts changed overall totals, which increased by EUR 300 million to about EUR 1.8 billion total. The allocations also changed, since Thales sold part of its naval business to DCN in 2007, creating DCNS. Some of the Thales products destined for the Scorpene became part of the DCNS Group when the merger took place.

A variety of Indian subcontractors, such as SEC, Flash Forge, Walchandnagar Industries, et. al. are involved in the submarines’ construction, manufacturing and delivering specific parts for incorporation into the vessels.

By late 2010, delays at MDL led to reports that Scorpene construction might be altered to include other Indian shipyards, and even DCNS in France. That shift to other shipyards hasn’t happened for Project 75, but it is planned for the follow-on Project 75i. Whether that plan can survive rent-seeking lobbying by India’s state-owned industries remains to be seen.

Overall Timeline, Plans & Options Project 75 & 75i Timelines

A March 8/06 release from the Indian Ministry of Defence gives the long history of the Type 75/ Scorpene contract’s genesis. After numerous delays, final negotiations were held with vendors in 2005. This reportedly cut INR 3.13 billion from the 2002 negotiated position, and involved other concessions. Even so, India’s program budget had to rise in order to accommodate the final contract.

As is often true in India, some of this was self-inflicted. In 2009, India’s Comptroller and Auditor General (CAG) reported that the government’s delays in finalizing a deal had probably raised the project’s cost by 2,838 crore, or about 15% of the project’s total cost – and that was before the additional Rs 2,000 crore contract to DCNS was finalized in 2010.

“Project 75” had options for another 6 submarines, but that was replaced by a 6-boat “Project 75i” competition in 2007. Introducing another competition risks slowing India down, and may add industrial disruption from a new design and new partners, in order to add improved technology. Key requirements reportedly include an Air-Independent Propulsion module, and the ability to launch supersonic BrahMos cruise missiles from vertical launchers. As of 2014, however, there isn’t even an official RFP.

The AIP Option MESMA AIP section

Like many modern diesel-electric submarines, the Scorpene class is exceptionally quiet. It can also be equipped with an additional section that holds a MESMA brand AIP (air-independent propulsion) system. A CM-2000 Scorpene can operate underwater for 4-6 days without surfacing or snorkeling to get oxygen to recharge its batteries. An AM-2000 Scorpene AIP, in contrast, will be able to operate underwater for up to 18 days depending on variables like speed, etc. Each AIP section costs around $50-60 million, and adds 8.3 meters (27 feet) and 305 tonnes to the hull section. The resulting AM-2000 Scorpene AIP is 70m long, and displaces 1,870t.

Naval Chief Admiral Arun Prakash has said that the agreement gave India the option of incorporating AIP technology after delivery of the 3rd Scorpene submarine. India’s Navy appeared to be opting to do this in Scorpenes 4-6, but the state-run DRDO research organization made a typical play to develop their own AIP “hull plug” for the Scorpene. They’re now talking about fielding only submarines 5 & 6 as AIP boats, if DRDO’s technology is ready.

The need to test such systems extensively after they’ve been developed means that DRDO has effectively defaulted on their future 2015 delivery target, even as Pakistan fields all 3 of its Agosta 90B boats with mature French MESMA AIP technology inside.

India’s specifications for Project 75i boats are expected to require pre-installed AIP systems.

Sub-Par: India’s Underwater Plans & Realities Shishumar Class
(click to view full)

If India can overcome its government’s own obstacles to fielding an effective submarine force, reports by Indian media have described a long-term desire to manufacture up to 24 submarines in a phased manner. In the mid-200s, Admiral Prakash publicly stated an objective of “24 subs in 30 years.” A more likely outcome involves cutting the current operational fleet roughly in half by 2025, and returning to the current inadequate fleet size by 2030 – 2035.

Most of the Project 75 delays, and many of the cost increases, are attributable to India’s slow decision making and lack of readiness. Meanwhile, India’s existing fleet continues to age, and the size of India’s submarine fleet will become a serious concern by 2016 or so. The situation is fast approaching a crisis, especially given India’s general Anti-Submarine Warfare weakness. Key risk factors that are creating the crisis include:

Risk: Age-out. Based on a 30-year safe lifetime for submarine hulls due to the constant pressure squeeze and release from diving, India will need to start retiring its first 2 U209/ Shishumar Class submarines around 2016 – 2017, or find a good reason to extend them past that 30-year lifespan. At the same time, 3 of the Navy’s early Kilo/ Sindhugosh Class boats would also be at or beyond a 30-year lifespan by 2017, for a total of 5 boats at risk. By 2020, the figure will be 9 boats: 2 U209s, and 7 Kilo Class. By 2025, all 4 U209s and 8 of the 9 remaining Kilo Class submarines would be past 30 years of service.

If 33 years is the service cutoff instead, the fleet would drop by 3 boats in 2019 (2 U209, 1 Kilo), 2 more in 2020 (2 Kilo), 2 more in 2021 (2 Kilo), 1 in 2022 (1 Kilo), 1 in 2024 (1 Kilo), 1 in 2025 (1 U209), 1 in 2027 (1 U209), and 1 in 2033 (1 Kilo).

Risk: State Firms. Poor performance by state-run firms has gone from a risk to a crisis. Project 75 was supposed to begin Scorpene deliveries in 2012, but that may be delayed to 2017. Since placing a new submarine type in operational service can take up to 2 years of trials and exercises, it could be 2019 before India fields its 1st new operational boat.

Risk: India’s Government. India’s 4th-World class procurement process adds even more risks. The risk of delay has already materialized. Despite initial solicitations in 2008, the 75i RFP still pending in 2014, and even declaring a winner isn’t expected before 2017. India’s navy has given up on its sensible risk-mitigation plans to have the first 2 boats built abroad. Worse, India’s government wants to add state-run Hindustan Shipyard Ltd. (HSL) in Visakhapatnam as a submarine builder. This is the same yard that destroyed the Kilo Class INS Sindhukirti in a bungled refit, which does not inspire confidence. There is marginal comfort in the fact that the Modi government intends to open Project 75i to private industry, and substituting inexperience for demonstrated issues of competence may be an improvement.

The bottom line? India is unlikely to field any Project 75i submarines before 2025. Even this date assumes that the 75i competition won’t become bogged down in unsubstantiated allegations and process freezes and fail to deliver anything.

DID reminds our readers that long term plans for major capital acquisitions have a way of shrinking over time as budgetary tradeoffs are made – 32 DD (X) destroyers for the USA became 12, and then 3. The difference is that submarines are the strategic platform of the 21st century, and India needs a strong presence in the Indian Ocean if it intends to be a significant strategic actor. Meanwhile, the buildup of China’s submarine and naval forces is likely to keep the importance of Indian submarines front and center.

Time will tell if actual budgets, shipbuilding execution, and political performance can match the Navy’s appetites. So far, the record isn’t encouraging.

India’s Scorpene Project: Contracts & Key Events 2014-2016

DAC clears Project 75i, but conditions set by India’s political class cut the throat of their submarine force structure; Sindurakshak raised as inquest continues; Other Kilo Class accidents; New government takes action on batteries for existing fleets; Still no action on Black Shark torpedoes. (ex-)INS Sindhurakshak
(click to view full)

August 25/16: An inquiry into a leak of sensitive technical information of France’s Scorpene attack submarine is being planned by the French government. The leak surfaced in a report by an Australian newspaper who received 22,400 pages of ship builder DCNS’s company data on the six Scorpene boats it’s constructing for the Indian Navy. The company fears that such a leak may harm the company’s deal with Australia to design and build the Shortfin Barracuda A1 diesel-electric submarine.

October 30/15: The Indian Navy kicked off trials of the first of its Scorpene-class submarines on Thursday, with the future INS Kalvari launched from Mumbai shipyards to begin ten months of testing. Six Scorpene (also referred to as Project-75I) boats are due for delivery by 2020, with the Kalvari slated for commissioning next September. Indian state-owned Mazagon Docks Limited partnered with France’s DCNS to develop and build the submarines through a $3.6 billion contract signed in October 2005.

October 9/15: Janes reported that Indonesia is in talks with French shipyard DCNS over the possible sale of a Scorpene 1000 diesel-electric submarine, despite reports that the country’s parliament approved the acquisition of Russian-built Kilo-class boats in September. The Indonesian defense ministry is thought to be considering a purchase of five Russian subs, with the Indonesian Navy currently operating two South Korean-manufactured submarines, with another two on order. The littoral capabilities of the French design may be the reason for a split purchase, with the Russian boats intended for use in deep water. DCNS signed a partnership agreement with Indonesian shipyard PT Pal in November, which included marketing of the Scorpene 1000.

September 29/15: French and US firms have also reportedly begun discussions with the Indian Defence Ministry over possible collaboration for the Indian Navy’s future fleet of six nuclear attack submarines, known as Project-75(I). The discussions are reported to have taken place in July, with the Indian Defence Ministry now in a position to select a NATO partner over Russian assistance in the project. The country’s government is also considering whether to lease another Akula-class boat from Russia, with the Indian Defence Acquisition Council approving the acquisition of six new submarines in October 2014.

July 9/15: India is reportedly engaged in talks with Russia over a possible nuclear submarine leasing agreement. The topic is scheduled to be included on a list of topics to be discussed between India’s Modi and Vladimir Putin when the Indian PM visits Moscow next week. It is likely that instead of leasing a third Akula-class attack sub from the Russians to complement the existing leased subs, the Modi government will look to lease a more modern Yasen-class sub, or a customized variant of a different class. Russia recently announced that it will upgrade its own Akula-class fleet, also recently laying-down a fifth Yasen-class boat.

May 4/15: The Indian-manufactured INS Arihant nuclear SSBN is progressing well with sea trials, according to the Chief of the Indian Navy. Launched in 2009, the sub’s reactor went critical in August 2013 and is thought to have begun shakedown voyages from March last year. Based on the Russian Akula-1 design, the INS Arihant is India’s first indigenously-manufactured nuclear sub and a critical component of the country’s pursuit of a nuclear triad capability. In related news, the Indian MoD has restricted all future shipbuilding to domestic yards, with private shipyards having a potential workload of $3.2 billion over the next fifteen years.

Oct 24/14: Project 75i. India’s top-level Defence Acquisition Council clears INR 900 billion in acquisitions, including INR 530 billion for Project 75i to build 6 AIP submarines in India. The government intends to identify capable shipyards for the foreign partnership within the next 2 months, from among 7 major shipyards (4 of which are state-owned).

Wouldn’t it be better to have the outside partners identify their preferred shipyards, since their primary incentive is directed toward contract performance rather than the results of political lobbying? One might add that if the chosen submarine vendor ends up disagreeing with India’s shipyard choice, it’s only going to prolong negotiations whose late timing and contract structure already guarantee a force crisis for India’s submarine fleet.

Other DAC clearances today include 2 SDV underwater commando delivery vehicles; up to INR 32 billion to buy and license-build about 300 Spike family launcher systems and 8,000 missiles; INR 20 billion to have the state-owned Ordnance Factory Board build about 360 more BMP-2 tracked IFVs under license; and INR 18.5 billion for 12 more license-built Do-228NG short-range transport and maritime surveillance aircraft from HAL. Sources: NDTV, “6 Made-in-India Submarines for Navy for 53,000 Crores” | IANS, “Defence ministry clears Israeli anti-tank missile, six submarines”.

DAC Approval: Project 75i

Sept 7/14: Project 75i. Indian policymakers decide to cripple their strategic posture:

“Frustrated with seven years of debilitating delay in even kicking off the process to select a foreign collaborator to help make new-generation stealth submarines, the Navy has junked its long-standing demand for getting two of the six such vessels directly from aboard…. all the six new submarines, armed with both land-attack missile capabilities and air-independent propulsion for greater underwater endurance, will be constructed in India with foreign collaboration under ‘Project-75-India’….

Once the global tender or RFP (request for proposal) for P-75I is issued, it will take at least three years to first select the foreign collaborator and then finalize the project with it. It will thereafter take another seven to eight years for the first submarine to roll out.”

So, no tender. When there is one, we’re at 2017 for a winner. India will need to start retiring U209/ Shishumar Class submarines by 2016, or find an excuse to extend them past a 30-year safe lifespan. At the same time, 3 of the Navy’s early Kilo/ Sindhugosh Class boats would also be at or beyond a 30-year lifespan, for a total of 5 boats at risk this way before a Project 75i winner is even declared. Waiting another 8 years after a winner is declared brings us to 2025 for the 75i rollout, by which time all 4 U209s should be retired, and 8 of India’s 9 Kilo Class boats would have ages ranging from 34 – 39 years. Only INS Sindhushastra would be under the 30-year mark. That could leave India with its submarine force cut in half, when its current fleet of 13 is already acknowledged as inadequate to India’s strategic needs.

In contrast, here’s what strategic urgency that forced the original plan plus urgency looks like: an 2-phase RFP issued in late 2014, with an expeditious evaluation and a winner in 2015. There’s a commitment to build the first 2 boats abroad, with some Indian workers present on exchange, and a target for Indian participation that can be finalized while construction begins. That would add 2 more submarines to India’s fleet by around 2019; even if service cutoff is set at 33 years, India’s total fast attack submarine fleet would still have dropped from 13 to 11 boats. By 2025, if the 1st Indian-built Project 75i boat rolls out as planned, the type has already been through their long trials and exercise period, and can enter operational service before INS Shalki must decommission. It also sails into a reduced but modern fleet that has held steady at 10-12 front-line submarines: 6 Scorpene submarines, the Kilo Class INS Sindhushastra, the U209 Shankul and the soon-to-depart U209 INS Shalki, 2 Project 75i boats with fully trained crews, and a possible renewal of the nuclear-powered INS Chakra’s lease. Sources: The Times of India, “Delays force Navy to drop demand for foreign submarines”.

Program timelines and India’s sub fleet

June 23/14: Batteries. India’s government new has decided to take swift action to replace submarine battery stocks, as India works to keep its existing fleet in the water until 2016.

The Navy has issued an RFP to buy 7 Type-I battery sets (248 batteries each) for Russian-made Kilo-class submarines, plus 2 sets of Type-II batteries (540 batteries each) for their U209 Shishumar Class. They’re also buying new cables. The Kilo Class submarine INS Sindhuratna needs those cables to become operational again, and the belief that old and dangerous battery sets may have played a role in Sindhurakshak’s sinking (q.v. Feb 26/14) has made it clear that the red tape blocking new buys needed to be cut.

What the report doesn’t say is whether a resolution was found for the fact that “the Defence Ministry had stopped purchases from a particular vendor.” One supposes that we won’t know until the RFP responses come in, but these sorts of considerations should have planners attention for the future Scorpene fleet as well. Sources: Mail Online India, “Centre rushes to buy new submarine batteries as Navy suffers shortage”.

June 5/14: Sindhurakshak raised. Resolve Marine Group begins raising INS Sinhurakshak (q.v. Jan 19/14), which has lain at the bottom of Mumbai harbor since explosions sank the Kilo Class submarine on Aug 14/13. After the harbor was dredged to be 8 feet deeper in that area, Resolve used a twin-barge technique that raises the boat using chains, sinks the carrier barge beneath the raised boat, lowers the submarine onto the sunken barge, then refloats the barge and carries the submarine away.

The is important to the entire fleet, and not just because it clears critical space in Mumbai harbor. If forensics reveal that the explosion was terrorism, India will need to overhaul its security procedures. If the problem involved unstable batteries that MoD couldn’t replace in a timely way (q.v. Feb 26/14), then the risk to the entire serving submarine force rises until this can be dealt with, and India’s naval crisis is even worse. Sources: India Today, “INS Sindhurakshak lifted from Mumbai harbour floor in massive salvage operation”.

June 2/14: New Man. The BJP’s Shri Arun Jaitley takes over as Defence Minister, while also holding the ministries of finance and corporate affairs. He himself says that MoD will be a temporary assignment, leading many observers to wonder what’s going on. The answer may lie in the Ministry of Finance’s repeated sabotaging of military modernization project approvals. The Times of India writes:

“The finance ministry is often blamed for being a “big obstacle” for military modernisation plans. But with Arun Jaitley straddling both MoF and MoD as of now, there is “hope” the “detailed action plan” for the submarine fleet will be swiftly cleared. Jaitley, on being asked by TOI if there was “a conflict of interest” in handling both the ministries, replied, “Well, I see it as supplementing of interest”…. Navy is down to just nine operational diesel-electric submarines, with another four stuck in long repairs and refits. All the 13 submarines are over 20 years old, while eight of them have crossed 25…. Though this over Rs 50,000 crore project[75i] was granted “acceptance of necessity” in November 2007, the global tender to select the foreign collaborator is yet to be even floated…. “Since early-April, it’s now again with MoF. The tender or RFP (request for proposal) can be issued only after first the MoF and then the cabinet committee on security approves it,” said a source.”

If a unified minister can get the Project 75i RFP out, finalize the Black Shark torpedo buy, and make a decision about India’s M-MRCA program, he could do a tremendous amount of good for India’s defenses in a very short time. Sources: Indian Gov’t, “Arun Jaitley takes over as Defence Minister” | India’s Economic times, “BJP men, others fail to find logic in alloting defence to Arun Jaitley” | Times of India, “Modi govt must act fast to save India’s depleting submarine fleet”.

May 15/14: Torpedoes & 75i. Ajai Shulka writes that the absence of a torpedo contract needs to be a priority for the new BJP government, if they want to avoid a situation where India’s new Scorpenes are defenseless against enemy submarines:

“Consequently, when the first Scorpene submarine is commissioned in 2016, it will be armed only with the Exocet anti-ship missile. Were it to be challenged by Pakistan’s silent new Khalid-class submarines – the French Agosta-90B -the Scorpene will have empty torpedo tubes. Even if the new government signs the contract quickly, delivery would be unlikely before 2017…. A top-level navy planner laments the MoD’s lack of accountability, contrasting it with how former navy chief, Admiral D K Joshi, took responsibility for warship accidents and resigned.”

Meanwhile, no upgrade and life-extension has been approved or contracted for India’s aging U209 boats, and Project 75i has no contract. When 75i is underway, it plans to entrust construction of 1 of 6 submarines to state-owned Hindustan Shipyard Ltd, Visakhapatnam (HSL) – the same yard that destroyed the Kilo Class INS Sindhukirti during a bungled refit. Building Project 75i in 2 Indian shipyards would also mean paying double for transfer of technology (ToT). On the other hand, it may speed badly-needed deliveries. If you can trust the 2nd shipyard to perform. Sources: India’s Business Standard, “Scorpene subs to join fleet without torpedoes” | See also March 11/13, Dec 23/13 re: torpedoes.

April 10/14: Sabotage? The Sindhuratna Board of Inquiry is reportedly recommending the court martial of a Commodore, and a notation of “severe displeasure” on the records of 2 mid-ranking officers. Another change at the top may be on the way, courtesy of India’s electorate. dna India, “Sindhuratna mishap: Navy Board of Inquiry recommends action against officers” | PTI, “Top Navy officer may face court martial in submarine mishap”.

April 9/14: Sabotage? A preliminary Board of Inquiry still isn’t ruling out sabotage, which was an immediate conclusion when the Kilo Class boat INS Sindhurakshak sank in August 2013. While the initial, minor explosion could have been an accident, malfunction, or human error, the major explosions are attributed to the torpedoes. Those supposedly can’t trigger without human intervention, but the old saw about making things foolproof always applies. More can’t be known until the submarine is fully salvaged around August 2014, and forensic tests can be performed. Sources: The Hindu, “Sindhurakshak may have been sabotaged: probe” | Hindustan Times, “INS Sindhurakshak fire: ‘Sabotage’ angle in report is disturbing”.

April 6/14: Kilo Fire. The Kilo Class boat INS Matanga catches fire while undergoing a refit at Mumbai’s Naval dockyard. It’s a minor incident, involving a contractor performing steel welding in the Sewage Treatment Plant compartment and causing insulating material in the adjacent compartment to smolder. This isn’t something that would happen at sea, and they put the fire out immediately. Deccan Chronicle, “Fire on board INS Matanga at the Naval dockyard in Mumbai, no causalities reported”.

Feb 26/14: Kilo Fire. The Kilo Class submarine INS Sindhuratna experiences a fire during training near Mumbai, killing 2 officers and felling 7 sailors unconscious due to smoke inhalation. The problem was a smoke build-up in the Kilo Class submarine’s battery compartment – a problematic area that has been subject to procurement delays. The Times of India explains:

“TOI has learnt that the batteries on INS Sindhuratna were old and had not been replaced. “The batteries were not changed during its refit (maintenance) that was done in December 2013. The submarine is a diesel-electric vessel, which runs on battery power provided by 240 lead acid batteries weighing about 800 kg each. These batteries tend to release flammable hydrogen gas, especially when they are being charged, and submarines have safety systems to address emergencies arising out of this. Old batteries are even worse,” the source said.”

The submarine wasn’t fully loaded with weapons, which was extremely fortunate for all involved. Reuters adds:

“One former senior submariner describes a gridlock in which bureaucrats make “observations” and note their “reservations”, but make no decisions to buy or replace equipment for fear of being implicated in corruption scandals. “No one wants to touch the damn thing,” he said, noting that delays also cause procurement costs to escalate.”

In response, chief admiral DK Joshi resigns. Joshi is known as a very upright character, and he’s upholding an important tradition by his actions, while also reportedly expressing his own dissatisfaction with the MoD. It’s certainly convenient for some politicians to have him take the blame, but that may not be where the real problem is. Sources: Hindustan Times, “INS Sindhuratna mishap: Navy chief resigns as 2 go missing, 7 injured” | Firstpost India, “INS Sindhuratna: Report on battery system overhaul will haunt AK Antony” | NDTV, “Two officers died in fire on board submarine INS Sindhuratna, confirms Navy” | Reuters, “UPDATE 1-Navy setbacks show defence challenges facing next Indian govt” | Times of India, “Major mishap averted as INS Sindhuratna wasn’t fully loaded”.

Feb 6/14: Project 75i. Russia’s Rubin Design Bureau says that they’ve made progress adding vertical launchers to their newest Amur-1650 submarines, in order to incorporate Klub-S (SS-N-27B/30B) missiles that offer various combinations of subsonic and even terminal supersonic anti-ship, land-attack, and anti-submarine variants. Chief designer Igor Molchanov believes that they could install tubes for Brahmos missiles, without compromising the submarine’s capabilities.

He also made a pitch for Rubin’s own AIP solution, which cracks diesel fuel to obtain its hydrogen instead of storing the highly explosive gas on board. The Amurs are expected to compete against France’s Scorpene, Germany’s U214 or stretched U216, and Spain’s S-80. sources: RIA Novosti, “Russia Prepared to Modify Submarines for Indian Tender”.

Jan 19/14: Kilo Salvage? India has reportedly received 2 RFP responses for a DSRV rescue submarine, in case there’s another submarine emergency. Meanwhile:

“After an exhaustive study, an empowered committee of the Indian Navy has submitted to the Ministry of Defence (MoD) that to salvage the sunk, Kilo-class submarine INS Sindhurakshak, will cost upto [sic] Rs 300 crore. However, the MOD is yet to respond. It was learnt that a final decision on this is now being awaited since the MoD is ‘vetting the entire proposal’. It was also learnt that the navy has recommended a particular firm in its report to the MoD.”

That’s about $50 million, and even after paying it, the boat probably can’t be returned to service. On the other hand, no salvage means that the Board of Inquiry is stalled, which matters because there are strong suspicions that she was sunk by a terrorist attack (q.v. Aug 14/13). The sunken sub is also taking up an important berth in Mumbai’s crowded naval base.

Resolve Marine Group subsidiary Resolve India ends up winning the order in February 2014, with a bid described as “under Rs 240 crore” (around $40 million). Sources: India Today, “Salvaging INS Sindhurakshak to cost upto Rs 300 crore, navy tells MoD” [sic] | Times of India, “Indian arm of US company wins Sindhurakshak salvage
bid”.

Jan 19/14: Accident. The Kilo Class boat INS Sindhughosh runs aground while trying to enter Mumbai Harbour. Its entry was delayed, and by the time it was cleared, the tide was too low. Salvage efforts rescue the sub by floating it off as the tide rises.

The Indian Navy is initially saying that there was no damage, and that the submarine remains operational. It’s hard to see how this can be determined without a drydock examination, but so far, no decision has been made to do that. Or to launch a Board of Inquiry. Sources: India Today: “Navy salvages submarine INS Sindhughosh stuck off Mumbai coast” | Calcutta Telegraph, “Armed sub scare”.

Kilo aground

Jan 18/14: Torpedoes. India’s DAC may have cleared the INR 18 billion buy of 98 WASS Black Shark heavyweight torpedoes, but the Ministry of Defense has cold feet after the Jan 1/14 cancellation of fellow Finmeccanica Group AgustaWestland’s AW101 VVIP helicopter contract, and is “doing a rethink.”

Finmeccanica won’t be blacklisted, because it would affect too many other Indian programs and fleets. State-sector delays have already pushed the initial Scorpene delivery back to September 2016, so the MoD can afford to dither. Even so, the AW101 court case will take a while, and a decision will probably be needed while it’s still in progress. The Indian Navy is just lucky the submarines weren’t delivered on time, then forced to go without torpedoes. Which may still happen, unless the Ministry is forced into action. Sources: Times of India, “Defence ministry reviews move to buy torpedoes”.

2013

More costs, and more delays, all preventable; BrahMos can launch underwater, just not deploy; Torpedo buy hung up; China buying more advanced Russian subs. BrahMos
click for video

Dec 23/13: Torpedoes. India’s Defence Acquisition Council (DAC) approves an INR 18 billion proposal to buy WASS Black Shark torpedos for the Scorpenes. The decision comes a week before the government decides to cancel a different Finmeccanica group contract for AW101 VVIP helicopters, which is about to become a strongly-contested court case. Sources: The Week, “Proposal to buy torpedos from AW’s sister company”.

Dec 17/13: Project 75i. With its submarine force waning, the Indian MoD announces that 2 of the coming Project 75i submarines will be built abroad:

“Based upon the Naval HQ proposal, Defence Acquisition Council has taken a decision that P-75 I project will have 4 submarines (out of six) built within the country (03 at Mazgaon Dock Limited, Mumbai and 01 at Hindustan Shipyard Limited, Visakhapatnam, on Transfer of Technology, and two to be built in collaborator’s yard abroad.”

Nov 30/13: Scorpene supplemental. France is reportedly offering India an interesting deal. DCNS would build 2 Scorpene submarines in France, for delivery that would coincide with the induction of India’s 1st locally-built boat. In 1 stroke, they’d give India’s navy enough working modern submarines to meet naval commitments, until the rest of the Scorpenes arrive in service.

France is also reportedly pushing to have India make a 2nd-generation fuel cell MESMA system India’s official “Plan B,” in case DRDO can’t meet its 2015 delivery commitment for an indigenous Air-Independent Propulsion supplementary system. Extensive testing requirements for AIP systems all but guarantee that DRDO’s AIP is already late, but DRDO insists as usual that they’re on track this time. Their preferred approach is to wait until official failure in 2015 before beginning any decisions. Which would, of course, hold up construction of submarines #5 & 6, further crippling India’s submarine fleet, while India’s bureaucrats and politicians take their customary years to make a decision.

DRDO is correct to worry that acceptance of MESMA AIPs in the last 2 contracted boats would badly damage hopes for a DRDO-led AIP retrofit of the first 4 Scorpenes. It would also strengthen DCNS’ position for Project 75i, of course, by offering fleet commonality, while proving that MDL is already trained to accomplish MESMA AIP fit-outs. Sources: Livefist, “France Offers 2 Quick Scorpenes, DCNS ‘Worried’ About DRDO’s AIP”.

Aug 26/13: Project 75i. In the wake of the Sindhurakshak’s sinking, Indian media report that the country may look to lease a 2nd nuclear submarine from Russia. On the SSK front, the Times of India reports that defense minister A K Antony may be rethinking the Ministry’s slowness, and consider compromising his own renewed push toward an all-indigenous procurement policy.

In India, this consists of asking bureaucrats to kindly expedite the Project 75i building plan, 14 years after the program was approved to go forward. The paper reports that a Draft CCS Note with required specifications, concrete building plans, etc. will be sent to the Cabinet Committee of Security in “a month or so,” and that it contains the Navy’s requested provision that the 1st 2 submarines would be built abroad. If CCS approval leads to a fast contract, it’s entirely possible that India could have 2 operational Project 75i submarines before it has 2 operational Project 75 Scorpenes. That would shore up the submarine force quickly, but it would also be embarrassing.

The rest of Antony’s reaction consists of chest-beating about no more schedule slippages at state-owned Mazagon Docks Ltd., and calls for better and “faster” refits and maintenance for the shrunken 13-sub fleet – 11 of which are 20-27 years old. Can the Minister guarantee either outcome? No. Are they even technically achievable? If he knew, he would have been doing it already. Sources: Times of India, “Submarine shock: Antony fast-tracks projects”.

Aug 14/13: Sunk. An explosion and fire sink the Kilo Class INS Sindhurakshak while the boat is docked in Mumbai, killing 18 people on board. Firemen manage to contain the blaze to the submarine, so it doesn’t end up sinking the submarine docked next to it as well. The explosion happens the day before India’s independence day, and the comprehensiveness of the damage leaves observers inside and outside India considering the possibility that it was a terrorist plot.

Whether it was or it wasn’t, India’s fleet just lost its 2nd newest submarine. Sources: India’s Business Standard, “INS Sindhurakshak crippled; experts blame battery fire and ammunition explosion” | The Hindu, “Submarine blasts due to ‘possible ignition of armament'” | Hindustan Times, “Russia distances itself from India sub disaster”

Explosion

July 23/13: Late, again. MDL Chairman and Managing Director Rear Admiral Rahul Kumar Shrawat (ret.) confirms to The Hindu that “We have set a new target of September 2016 for delivery of the first Scorpene,” instead of the already-late date of 2015. Deliveries were originally slated to begin in 2012, and the latest confession won’t win many fans in the Indian Navy. The Hindu:

“The Navy, however, is livid over the yard’s persistent disregard for deadlines. Top Navy officials rue that by the time the Scorpenes are commissioned, they would be obsolete. The first three Scorpenes will not even have air independent propulsion (AIP)…. MDL’s long-drawn procurement processes and sluggishness in technology absorption gave the projects hiccups at the start itself. Meanwhile, the project cost grew exponentially from the original Rs.18,798 crore to Rs. 23,562 crore in 2010 with a renewed timeline.”

May 14/13: The Hindustan Times illustrates the dire situation facing India’s navy, due to mismanagement of India’s submarine programs:

“As reported first by HT on April 9, a confidential defence ministry report had warned that India had never before been poised in such a vulnerable situation and its undersea force levels were “at a highly precarious state.” …China operates close to 45 submarines, including two ballistic missile submarines. It also plans to construct 15 additional Yuan-class attack submarines, based on German diesel engine purchases.

The size of India’s submarine fleet will roughly be the same as that of the Pakistani Navy in two years…. merely six to seven submarines, including India’s first and only nuclear-armed ballistic missile submarine INS Arihant.”

That may be a bit pessimistic. The 4 U209s will need to begin retiring, leaving 10 Sindhugosh (Kilo) Class submarines that began entering service in 1986. At least 8 of those have been refitted under Project 08773, and can be expected to serve for several more years. That makes 9 submarines, but at Indian operational levels, that leaves just 3-4 boats available for missions. On the other hand, China’s fleet is venturing into the Indian Ocean more often, and bases like Hambantota in Sri Lanka and Gwadar in Pakistan will make that easier and easier. Keeping up with Pakistan won’t be enough, and the article is correct to point out that India is barely clearing even that low bar. Hindustan Times.

April 15/13: More delays and costs coming. The Times of India reports that bureaucratic delays by the Ministry of Defence may force Scorpene submarine deliveries to start in 2016, even as costs are set to rise again:

“According to sources, Mazagon Dock Limited (MDL) has informed the Navy that the project would be delayed by another 18 months…. Consultants from Navantia, the Spanish shipbuilding company, left the project in the last few days. The technical assistance pact for Navantia and DCNS, the French partner in the consortium, expired on March 31, sources said. With MDL failing to get the defence ministry’s approval in time, about 10 Spanish consultants working on the submarine project left India…. DCNS leadership is expected to meet with MDL top brass this week in Mumbai and present their own demand for additional technical assistance fee.”

Every problem listed here was preventable, and so is the crisis coming to India’s submarine force. A contract that built the first 2 boats abroad, with Indian engineers and specialists working at the foreign shipyard before transferring home to build the last 4 at MDL, would have cut technical assistance requirements, while delivering working submarines to the navy on time. India’s Navy has learned that lesson, and is lobbying hard for an analogous arrangement under Project 75i. Based on reports to date, the ministry hasn’t learned anything, and is resisting. Its political leaders would rather have the vote bank of state run jobs, and their associated financial arrangements up and down the supply chain. Even if that costs more, and leaves India strategically vulnerable. Somehow, that isn’t corruption.

March 20/13: BrahMos underwater. India successfully tests its supersonic PJ-10 Brahmos Mach 2+ cruise missile from a submarine. BrahMos joint venture CEO A Sivathanu Pillai describes it as the 1st underwater firing of a supersonic cruise missile anywhere in the world, and the missile successfully hit its target 290 km / 156 nm away.

Here’s the catch: none of India’s current submarines can fire the new submarine-launched missile. It’s too big to launch from a torpedo tube, and will need to use a vertical launch tube with the correct diameter. India’s Project 75i submarines are nearly certain to add this modification, but they won’t be ready until 2023 at the earliest, a decade after a submarine-launch Brahmos conducted its 1st test firing.

New Indian Express editorial director Prabhu Chawla attributes this disconnect to poor planning in the MoD. The truth is that there has been no shortage of planning, or lead time. Solicitations for the follow-on Project 75i reportedly began in 2008, and there is still no RFP. Likewise Air-Independent Propulsion was discussed in 2006, but the ball has been dropped and it’s unlikely to appear in any of the 6 ordered Scorpene submarines. What has been in short supply is timely execution, thanks to a combination of delays stemming from MoD practices, industrial failures, and hindrances put in place by politicians. No amount of planning can trump that. Times of India | Chawla op-ed.

March 18/13: Legal. India PIB:

“A complaint was received alleging financial irregularities against the then Director in-charge of Scorpene Submarine project in a Defence Shipyard. The complaint is under enquiry.”

March 11/13: Torpedoes. Defense minister Antony offers a written Parliamentary reply to say that India still hasn’t finalized a contract for torpedoes. A Special Technical Oversight Committee (STOC) was convened to review the complaints about the proposed Black Shark buy, and approved it as fair and to procedure. In other words, no wrongdoing. The high-level political Defence Acquisition Committee accepted the report in September 2012 (6 months ago), and has done… nothing. The purchase has now been delayed for over 3 years.

Welcome to India. Part of the reason involves allegations that WASS’ parent firm Finmeccanica paid bribes to secure a contract for 12 AW101 VVIP helicopters. In Italy, its CEO is facing bribery charges, and has been deposed. That sort of thing could get the parent firm blacklisted, which would also scuttle the torpedo buy, and could make it difficult for India to build its Vikrant Class indigenous aircraft carriers. As of March 11/13, Finmeccanica subsidiary AgustaWestland has been given a ‘show cause’ notice regarding cancellation of the AW101s, but did not have the contract cancelled until January 2014. No blacklisting will follow. See also Jan 12/10, Jan 31/11, Oct 28/12. India PIB.

March 8/13: China. An analysis piece in The Hindu by Vladimir Radyuhin points out that China continues to build a modern submarine fleet – including the most advanced conventional subs from Russia. The problem may be a pervasive one, stemming from poor Russian delivery and support on one hand, and India’s red-tape slowness and inability to make decisions on the other:

“At the end of last year, Russia concluded a framework agreement with China for the sale of four Amur-1650 diesel submarines…. It will also mark the first time that Russia has supplied China with more powerful weapon platforms compared with Russian-built systems India has in its arsenals. In the past, the opposite was the rule…. India risks being eclipsed by China on the Russian radar screens. As Russia’s top business daily Kommersant noted recently, even today, Russian officials from top to bottom tend to look at India with “drowsy apathy,” while Mr. Putin’s visit to India last year was long on “meaningless protocol” and short on time and substance.”

Jan 4/13: Investigation. India’s Central Vigilance Commission (CVC) has launched an inquiry against Commodore (ret.) Gopal Bharti, who heads up Project 75. The inquiry is in response to an unnamed internal whistleblower. The financial irregularities which include train fare reimbursement and taking his son abroad at public expense, aren’t earth-shattering. On the other hand, the CVC is investigating allegations that Bharti deliberately refused to place orders for 170 critical items, and are curious about the disappearance of 15 high pressure specialized underwater valves from his department.

Innocent until proven guilty, but the range of allegations are pretty broad. Times of India.

2012

India gambles on own AIP system – will it even be ready?; Kilo Class upgrades done; Project 75i gets official OK, but no RFP; India looking for land strike missiles on 75i subs. Pakistan’s A90Bs
click for video

Dec 4/12: AIP. StratPost offers an AIP system update from Indian Navy chief, Admiral D.K. Joshi

“AIP plugs for the fifth and sixth of (Project) 75 are under consideration. [DRDO’s Naval Materials Research Laboratory (NMRL)] has been tasked to develop that. It is doing so. What is to be seen is whether the… timeline Matches the delayed production timelines of (Project) 75. In case this comes online in conformity with the fifth and sixth ones they will be put into place, but if for some reason they are not ready at that point in time we would not delay the production timelines…. This would [also] become an option for any of the subsequent indigenous options [Project 75i]…. The next line will have an AIP plug.”

Meanwhile, all 3 of Pakistan’s comparable Agosta 90B submarines will include DCNS’ mature MESMA AIP technology.

Dec 5/12: Project 75i. India’s cabinet Defence Acquisition Council (DAC) has accorded Acceptance of Necessity (AON) for buying “Project 75i”, India’s next 6 submarines. A global RFP is reportedly due “very soon,” and the Indian government has reportedly decided to spend up to $10 billion/ Rs 55,000 crore on India’s future submarine force.

Project 75i diesel-electric SSK subs will have air-independent propulsion, and India is also looking to equip them with conventional land attack missiles. DCNS could offer the AIM-2000 Scorpene with the MESMA AIP, and might be able to offer integration of MBDA’s developmental MdCN cruise missile. The MdCN is already slated for DCNS’ SSN Barracuda Class nuclear fast attack submarines, and the right electronic commonalities could give any French proposal a notable advantage over German and Spanish competitors.

If India prefers its own BrahMos missile, on the other hand, 2 things will happen. One is that the playing field will be level. The other is that any submarine chosen would have to be a modified design, with vertical launch tubes sized for BrahMos. Indian government | Zee News.

Oct 28/12: Torpedoes. More headaches for India’s Black Shark torpedo buy. As if their direct competitor’s complaint wasn’t enough, a probe is now underway into India’s EUR 560 million purchase of 12 AW101 VIP helicopters. AgustaWestland is also a Finmeccanica company, and there are several cases of India’s blacklist laws being invoked against firms on the basis of mere corruption allegations, with no available proof.

The Rs 1,700 crore buy of 98 torpedoes for the Scorpene fleet was expected to be followed by a similar buy for Project 75i’s 6 submarines, and possibly a 3rd buy to plus up stocks and equip the new SSBN Arihant Class of nuclear-powered ballistic missile submarines. That could mean a total of up to Rs 5,100 crore, or about EUR 733 million / $947 million at risk given current conversions.

As for Atlas Elektronik’s claims that the torpedo bid was rigged (vid. Jan 31/11 entry), the Indian MoD’s Acquisitions Wing, Central Vigilance Commission (CVC), and Minister of State for Defence MM Pallam Raju have all rejected the claims, despite strong circumstantial evidence. India MoD | India’s Business Standard.

July 17/12: Sub-contractors. SEC Industries and DCNS today officially inaugurate new 1,500 m2 of workshop facilities at SEC’s Hyderabad facilities, and formally deliver cofferdam door coamings after successful Factory Acceptance Tests. The work was done under a September 2011 sub-contract between SEC DCNS India Pvt Ltd., and a second sub-contract for additional work was signed in 2012 (vid. March 23/12 entry). DCNS.

June 23/12: Kilo Class. Russia completes its set of 7 mid-life refits and modernizations of India’s Kilo Class submarine fleet, which were delivered from 1986 – 2000. Russia handled repairs and modernization for 7 boats, while Indian shipyards have delivered 1 and are working on another 2.

This last boat, INS Sindhurakshak ended her mid-life refit in Zvezdochka about 15 years after she was built. A submarine’s expected safe lifetime is usually about 30 years, but India may be forced to contemplate a 2nd refit series. Ortherwise, they may not be able to keep their overall submarine fleet at acceptable levels, while they wait for Scorpenes and Project 75i boats arrive. Additional refit efforts generally cost more for each additional year of safe service delivered. The Hindu.

June 11/12: Industrial. DCNS signs a strategic partnership for bringing DCNS technologies, methods and skills into India’s private Pipavav Defence & Offshore Engineering Company Limited. Pipavav is a shipbuilder, repair & dry-docking firm, and were recently chosen by MDL to form a Joint Venture to build warships for the Indian Navy. DCNS.

March 23/12: Sub-contractors. DCNS India announces a Scorpene sub-contract and transfer of technology with SEC Industries Pvt Ltd of Hyderabad, India. The deal for hull hatches, cofferdam doors, knuckle hoses, ballast vent valves, High Pressure air cylinders, weapon handling and storage system is worth about Rs 310 crore/ EUR 50 million. To make this work, DCNS will provide SEC with full plans for the components, training for over 40 SEC personnel at DCNS facilities during 2012-2013, plus 5 years of on-the-job training and support for manufacturing and quality control at SEC in Hyderabad.

SEC is known in Indian defense circles as a manufacturer of missile airframes and components, and signed a deal with Israel’s IAI back in 2008. The company’s previous experience had been with heavy pump set and road-roller equipment. DCNS.

March 19/12: Delays. The 1st Indian Scorpene sub is now confirmed as scheduled for delivery in June 2015, barring further delays, and program cost is now confirmed at Rs 23,562 crore (currently about $4.56 billion).

The original schedule was for delivery by December 2012, with submarines arriving each year until December 2017. The new official schedule has deliveries beginning 2.5 years later in June 2015, with submarines arriving every 9 months until September 2018. Costs are up about 25.4% from the original CAG-audited cost of Rs 18,798 crore after the deal was signed, or 87% over the program’s initial 2002 figure. Indian MoD | New Kerala | PTI.

Jan 14/12: Fleet readiness. The Hindu reports that construction of India’s 2nd Arihant Class submarine, Aridamana, leaves it slated for launch in late 2012 or early 2013. Fabrication of the 3rd ATV submarine has begun. Meanwhile, unnamed sources in the Indian Navy continue to express concern about the country’s silent service:

“The decline in the operational availability of submarines [as low as 40 per cent] has seriously compromised the force’s vital sea denial capability. The absence of Air Independent Propulsion… is another debilitating factor.”

What this means is that if India has 12 operational submarines (9 Kilo, 4 U209, 1 in refit at any time), it would only be able to field 4-5 boats in an emergency situation.

2011

Inquiry into Black Shark torpedo buy; Scorpenes will be late; Do India’s U209s need life extensions now?; Navy wants Project 75i to be a mix of foreign and locally-built, in order to be on time; State-run stranglehold on Indian defense industry; MDL-Pipavav public-private JV to build and service warships.

Sept 13/11: Industrial. Private shipbuilder Pipavav Defence & Offshore Engineering Company (PDOL) and state-owned Mazagon Dock (MDL) agree to form India’s first public-private partnership venture to build warships and submarines for the Indian Navy.

Mazagon Dock Pipavav Ltd will be held 50/50, and it will help MDL fulfill existing orders while competing for future defence contracts in India. Pipavav chairman Nikhil P Gandhi is quoted as saying that it’s “primarily to fast-forward the process of warships and submarine contracts held currently by the MDL.” India’s Financial Express | Indian Express.

July 29/11: Rear Admiral MT Moraes takes over as the Assistant Chief of Naval Staff (Submarines) at Delhi, to look after the planning and acquisition of submarines.

Rear Admiral Srikant is also slated to take over as Flag Officer Submarines (FOSM) based at Visakhapatnam, this is the indian Navy’s class authority on submarines, responsible for defining standards, policies and procedures for their operations and maintenance. Rear Admiral G Ashok Kumar will take over as Flag Officer Sea Training (FOST) at Kochi. India MoD.

June 8/11: Sub-contractor. DCNS India Pvt. Ltd. signs an undisclosed contract with Flash Forge India Pvt. Ltd., an ISO 9001:2008 certified manufacturer of customized special material forgings based in Visakhapatnam.

This first contract with Flash Forge for the manufacturing of mechanical equipment is the conclusion of a long process for DCNS, which involved identification of potential partners, audits of the manufacturing and quality processes, qualification, and then a competitive Request For Proposal (RFP). With a lot of the advance work out of the way, DCNS expects to announce other local contracts in the near future. DCNS.

June 6/11: IANS relays a report in the May 2011 issue of India Strategic, quoting DCNS India Managing Director Bernard Buisson to say that 2 Scorpene combat systems have been delivered to Mazagon Docks Ltd. (MDL). They’re in the process of integrating the first one.

Buisson reportedly said that there are about 20 – 25 French engineers assisting in technology transfer, and added that DCNS has had technical discussions with the Indian Navy on installing MESMA air independent propulsion (AIP) systems on board the last 2 submarines. That move would raise the subs’ cost, and DCNS said they are (still) awaiting the Navy’s response. IANS | India Strategic.

May 18/11: Delays. The Times of India reports that 2 Indian naval crews will be going to France “after some months” to train for operating the SSK Scorpene fast attack submarines. The article notes that by 2020, India’s fleet will comprise just 5 Kilo Class and 4 U209 Shishumar class boats available, and quotes an unnamed official:

“We now hope to get the first Scorpene by August 2015. Each submarine will have just a 36-member crew since automation levels in them are very high,”… “The first Scorpene will be ‘launched’ into water in 2013, and will be ready for commissioning by August 2015 after extensive harbour and sea trials,” said a top DCNS official. “The target is to deliver the sixth submarine by 2018, one every nine months after the first one in 2015. The third and fourth submarines are already under construction at MDL…”

April 6/11: Stretch the Shishumars? The Scorpene project’s lateness, and uncertainties around Project 75I award and delivery dates, have led India’s Navy to talk with Germany’s HDW about upgrading the capabilities, and extending the lifespans, of its existing U209 Shishumar Class boats, inducted from 1989-1994. Zee News.

Feb 16/11: P75i. Indian media quote Indian navy chief Admiral Nirmal Verma, who reiterates that the follow-on program to the Scorpene deal is already cleared by India’s government. The result could add 6 more Scorpenes to the order books, or it could result in a parallel program to build another model. With 7 of India’s 14 active submarines due for retirement by 2015, and the Scorpene program 3 years late because of self-inflicted delays, the Indian government’s unwise choice to avoid building any Project 75 Scorpene submarines in France has created a looming crisis for the Navy.

Verma says that the Navy is going through responses to the September 2009 RFI, and hopes to be able to issue a tender in 2011. Responses have reportedly included DCNS (Scorpene AIP), Germany’s HDW (U214) and its Swedish Kockums subsidiary (several options, incl. the forthcoming A26 design), Navantia (S-80), and Russia’s Rosoboronexport (Amur 1650), He adds that Project 75i is looking for an improved combat management system, better sensors and detection range, and the certain inclusion of Air Independent Propulsion (AIP) technology. Reports place the order total at $11 billion, but that seems high even if it includes both the current $4.38 billion for Project 75’s 6 subs, and a Project 75i program for another 6 diesel-electric boats. Time will tell.

The current plan is for India to order 2 submarines built at the winning foreign shipyard, and build 3 at Mazagon Docks Limited (MDL) in Mumbai, and 1 at Hindustan Shipyard in Visakaphatnam. That’s similar to the Project 75 plan pushed by India’s Navy, who wanted 2 boats built abroad because they feared that delays and performance issues might create problems for the Scorpene. Political favoritism overruled that request, and the feared scenario has come to pass. This time, the government is showing slightly more flexibility, by approving the plan to have 2 submarines built abroad in order to avoid a complete crash in fleet numbers. On the other hand, the Defence Acquisition Council (DAC) refused to accept the recommendation the Project 75i avoid MDL, due to that shipyard’s existing workload. Instead, the government assumes that it would be able to build 3 more submarines, which may even be of a different type, on an accelerated production schedule, while still delivering all 6 Project 75 Scorpene boats to the revised schedule. Yeah, right. IANS | Times of India.

Jan 31/11: Torpedo trouble? India’s Central Vigilance Commissioner has opened an inquiry into Project 75’s planned buy of 98 heavyweight torpedoes, after Atlas Elektronik GmbH executive director Kai Pelzer reportedly lodged a direct complaint. The complaint refers reportedly refers to irregularities in the conduct of the procurement process, including specific charges of corruption. The CVC inquiry was ordered in December 2010.

Atlas Electroniks’ complaint is straightforward: the competition was rigged. The RFP makes the torpedo vendor responsible for seamless integration and/or interface of the torpedo with the SUBTICS combat system. The Finmeccanica/DCNS Blackshark is the Scorpene’s default torpedo, but Atlas had to have their plan approved by the MoD’s Technical Evaluation Committee (TEC). That approval was given, but Atlas’ integration proposal was failed in the user trials. India’s DPP, Para 13, doesn’t allow requirements that “prejudice the technical choices by being narrow and tailor made.” The TEC’s approval escaped that trap, but Para 70a allows only one remaining vendor after trials. Atlas says this was the Navy’s intent all along.

The inquiry suspends India’s planned buy of Black Shark heavyweight torpedoes from Finmeccanica subsidiary Whitehead Alenia Sistemi Subacquel (WASS), until this can be sorted out. Atlas Elektronik Gmbh was offering their DM2A4 Seahake. Both torpedoes feature advanced seeker heads, and can be controlled by a trailing fiber optic cable. Defense World | Economic Times of India | Subsequent Business Standard coverage.

Jan 18/11: Industrial. India’s Economic Times sums up the latest revisions to India’s Defence Procurement Policy, amid hopes that the stranglehold of state-run firms on major Indian defense contracts might be loosened:

“…(DPP) 2011 has made it clear that the state-owned companies will get preference while awarding major defence contracts. Private sector will get certain concessions, but the situation has not gone down well with the players… According to DPP 2011, foreign defence vendors can now discharge their offset obligations in the civil aviation, internal security and training sectors, compared to the earlier mandate of discharging the same in the defence industrial sector only… The minister also brushed away concerns that the new policy guidelines related to the capital intensive shipbuilding industry favoured the defence PSUs, in spite of the demonstrated ability of private sector companies, such as Larsen and Toubro (L&T) and Pipavav Shipyard in recent years… L&T, which has invested millions on its state-of-the-art shipbuilding facility at Hazira, was promised a critical role in developing and manufacturing India’s second submarine line, Project 75I, along with the state-owned PSU Mazagon Dock, but was later sidelined… The new policy – which has divided procurement into two different sections – mandates that the DPSU shipyards will be given contracts on a nominated (non-competitive) basis, while the private shipyards will have to participate through a competitive bidding process. Further, it remains the government’s call to decide which contract should be open to competitive bids in the first place, raising questions of whether the government is queering the pitch further.”

2010

Costs rise, delivery slips; India picks WASS Black Shark torpedoes.

December 2010: Torpedoes, etc. WASS (Whitehead Alenia Sistemi Subacquei) has launched its first subsidiary in India: Win Blue Water Services (WBWS)/ It will focus on naval equipment, market research and analysis, supporting offset and supply chain management, and creating a service hub for the Middle East and Asia.

WASS has operated in India since 1975. Their A244/S light torpedo recently received an Indian contract to upgrade their stocks to Mod 3, and their Bharat Dynamics Ltd (BDL) partnership is producing the C303 anti-torpedo countermeasures system, which is already 50% indigenized. The firm sees opportunities in artificial underwater targets, underwater surveillance systems for strategic areas and offshore energy production, etc. The more work it does, the more value it can count toward Indian requirements for industrial offsets, and the more it can compete with “indigenous” products for the Indian Navy. WBWS is planning to start joint ventures for its different domains, and is in the process of discussions with Indian companies including Larsen & Toubro. India Strategic.

Dec 2/10: Delays. The headline reads “After delays, Scorpene submarine now on track: Navy chief.” Unfortunately, the IANS article doesn’t offer many specifics to support that contention, so it’s hard to evaluate.

Nov 30/10: P75i. India’s PTI reports that Russia’s Rosoboronexport will offer the latest Amur-1650 class submarines to India for Project 75i, the follow-on tender for 6 new submarines that will either extend or complement the current Scorpene contract.

The Amur is known as the Lada class in Russia, and renaming it the “Amur” for export is probably a good idea, in case anyone still remembers those infamous Lada automobiles. The new class was developed by the Rubin Central Design Bureau of Naval Technology as an improvement to the Project 636 Advanced Kilo-class diesel-electric fast attack submarines, and is said to be even quieter. The 1,765t Amur 1650 variant is larger than the Amur 950 model, and has an option for air independent propulsion. It lacks the 950’s 10 vertical launch tubes, relying instead on 6 reloadable torpedo tubes.

Sept 29/10: Industrial. An Asia Times article, “Leaks in India’s submarine strategy,” says that the submarine construction program has changed:

“India is in the process of getting six Scorpene subs… to be built at the Mazagon facility in Mumbai… but this procurement is experiencing a slowdown. Mazagon Docks in Mumbai will construct three of the six, Hindustan Shipyard Ltd in Visakhapatnam will construct one, and the other two may be procured from foreign sources or built by another private shipyard in India.

“The delivery of the first of the French Scorpenes, which was supposed to enter service in December 2012, has been delayed. Antony addressed this situation in parliament only a few weeks back. This will clearly impact upon India’s undersea force levels,” said [Observer Research Foundation senior fellow Dr. Rajeswar] Rajagopalan. “India has about 35 private shipyards, of which L&T [Larsen & Toubro Ltd] and Pipavav are believed to be competing to build the two submarines, of the six planned.”

The report adds that shrinkage of India’s operational submarine fleet may even force 2 submarines to DCNS shipyards, so they can be delivered and become operational in time. As of March 2012, however, India has done none of these things – just added more overhead and reports, and pushed delivery back.

March 10/10: Costs. DefenseWorld reports that the Indian government has approved another Rs 2,000 crore for the Project 75 Scorpene submarine program, to cover the purchase of contractor-supplied MPM equipment packages for the Project 75 Scorpene submarines.

Negotiations over the price increase have been stalled since October 2005, which has delayed the Project 75 program by 2 years.

Extra for equipment packages

April 26/10: Delays. Sify News quotes a Parliamentary response by defence minister Antony regarding the Scorpenes:

“A programme of construction of six Scorpene submarines is currently underway at Mazagon Docks Limited (MDL) under transfer of technology from a French company. As per the contract, the first submarine was scheduled to be delivered in December 2012 and thereafter one each every year till December 2017… There has been a delay due to initial teething problems, absorption of technology and augmentation of MDL purchased material. The first submarine is now expected to be delivered in the second half of 2015… The delay in scheduled delivery of submarines is likely to have an impact on the envisaged [submarine] force level… However, the gap in submarine capacity has been addressed by modernisation with the state-of-the-art weapon and sensor fit on the existing submarines…”

See: Sify News | Indian MoD – less detailed.

March 30/10: WIL partnership. An Indian PR Wire release by Walchandnagar Industries quotes DCNS Chairman Patrick Boissier, who was speaking after the unveiling of the “Vinod Doshi Technology Center”:

“Said that the company which was Europe’s leading company in , ship building , off shore patrol vessels and Submarine manufacturing and valued at Euros 2.5 billion had signed an MOU with WIL last year manufacturing of critical technical parts for Scorpene” submarines for the Indian Navy… Walchandnagar Industries was identified for the project after we scouted for strategic partners and we were convinced that they would provide us the with High level technology for critical manufacturing components, he added “Talking about our future plans is premature, but it is possible in the long term to work with Walchandnagar Industry for world markets after our project in India is completed as we have a 30 % market share in Submarine manufacturing.”

While the release adds a piece to the industrial puzzle, careful reading of Mr. Boissier’s statement shows no commitment made.

Jan 12/10: Torpedoes. India’s MoD picks the DCNS/Finmeccanica WASS Blackshark heavyweight torpedo to arm its Scorpene Class submarines. The Blackshark is the standard torpedo offered with the class, and already serves with Malaysia’s Scorpene. India’s total buy is projected at 98 torpedoes, for Rs 1,700 crore, but there is no contract yet.

Their competitor was Atlas Elektronik, who supplies the SUT-B torpedoes that arm India’s upgraded U209 Sindhugosh Class. Atlas’ new DM2 A4 Seahake, which has demonstrated very long range engagements, would have been the torpedo used on the Scorpenes. Source.

Torpedo picked

2009

CAG auditors unimpressed with Project 75; More money needed; India’s submarine readiness problem.

Dec 2/09: Delays. The Indian government confirms earlier reports, via a written reply to a Parliamentary question:

“As per contract signed with Mazagaon Docks Limited (MDL), first Scorpene submarine is scheduled to be delivered in December 2012 and thereafter, one each every year till December 2017. On account of some teething problems, time taken in absorption of technology and delays in augmentation of industrial infrastructure and procurement of MDL purchased materials (MPM), slippage in the delivery schedule is expected. Delay in scheduled delivery of submarines is likely to have an impact on the envisaged submarine force levels [for the Navy as a whole]. Loss on account of the delayed delivery is difficult to quantify at this stage.

This information was given by Defence Minister Shri AK Antony in a written reply to Shri Prabhat Jha and Shri Prakash Javadekar in Rajya Sabha today.”

Aug 29/09: Costs. The Times of India reports that the Defence Acquisitions Council has decided to approach the Cabinet Committee on Security to approve a EUR 300 million (about Rs 2,000 crore) cost spike for the French ‘MDL procured material (MPM) packages,’ from a EUR 400 in 2005 to EUR 700 million now. The MPM packages go inside the hulls being produced by Magazon Docks Ltd., and reportedly include virtually all major systems connected with sensors, propulsion, and other systems.

Contracts signed to date include the October 2005 Rs 6,315 crore contract with DCNS’ predecessor for transfer of technology, combat systems and construction design; the October 2005 Rs 1,062 crore contract with MBDA for sea-skimming Exocet missiles and related systems; a Rs 5,888 crore contract with MDL for local submarine construction; Rs 3,553 crore set aside for taxes; and Rs 2,160 crore for other project requirements. Total: Rs 18,798 crore. India Comptroller and Auditor General reports that the government’s 9-year delay in finalizing the deal has probably raised the project’s cost by 2,838 crore, or about 15% of the project’s total cost before this price rise.

July 20-27/09: CAG report critical. India’s Comptroller and Auditor General releases a report critical of the Scorpene acquisition, and Defense Minister A K Antony admits to India’s Parliament that the project is running about 2 years behind schedule, due to “some teething problems, absorption of technology, delays in augmentation of industrial infrastructure and procurement of MDL purchased materials (MPM).”

The CAG report criticizes the fact that the submarine requirement was approved in 1997, but no contract was signed until 2005, and then for only 6 of the envisioned 24 boats. Overall, the project cost had increased from Rs 12,609 crore in October 2002 to Rs 15,447 crore by October 2005 when the contract was signed. Once it was signed, the CAG believes that “the contractual provisions resulted in undue financial advantage to the vendor of a minimum of Rs 349 crore.”

The overall project, which includes a submarine construction facility at Mazagon Dockyards Ltd. (MDL), is placed at Rs 18,798 crore, or 187.98 billion rupees (currently about $4 billion). The Times of India believes that the final program cost will be over Rs 20,000 crore (currently about $4.3 billion), as the cost of key equipment that MDL shipyards needs is rising quickly. Rediff News notes other excerpts from the CAG report, adding that an accompanying Rs 1,062 crore deal for Exocet anti-ship missiles will have issues of its own:

“But even before the missiles becomes operational on the submarine, the warranty period of first two batches of the missiles supplied by the company would have expired, it added. India also extended to the [submarine] vendor “Wide ranging concessions” on warranty, performance bank guarantee, escalation formula, arbitration clause, liquidated damages, agency commission and performance parameters…”

See: Times of India | Rediff news

CAG report & costs

Jan 13/09: Sub-standard force. A CNN-IBN TV program highlights the case of the Kilo Class submarine INS Sindhukirti, whose repair schedule reportedly ran for 10 years, and which “has been in dry dock at Vizag for a refit programme for close to five years now.”

A confidential Indian CAG report is said to have found that only 7 of India’s 16 submarines are available for combat at any time. That’s not an unusual percentage for a submarine force, but if 10 of the 16 are due for phase-out by 2012, the impact on force levels is obvious. To maintain current numbers, one submarine would need to be inducted every 2 years, but there have been no additions since 2001. Source.

2006 – 2008

Deal for subs signed; India considering AIP propulsion addition; Scorpene unlikely to make 2012 deadline; India begins soliciting for follow-on Project 75i submarines.

May 28/08: Delays. The Hindustan Times reports India’s navy may not be able to induct the first Scorpene submarine by the 2012 deadline, as the French have yet to part with crucial details including design and drawing documentation. “A senior navy official confirmed to HT on Tuesday that the project had been delayed by a year.”

The Scorpene project is not the only Indian naval project with delivery issues, and these situations have begun to create combat power issues for India’s navy. The article states that by 2015, India’s fleet will have shrunk from 16 submarines to 10 Kilo Class plus the Scorpenes. See also subsequent Financial Express report.

Feb 28/08: P75i.India Looking for Additional Submarines.” The Project 75i RFP is reported to be worth about EUR 3 billion/ $4.5 billion, and responding firms are apparently Spain’s Navantia (S-80 confirmed), France’s DCNS (unknown, Scorpene or Marlin Class that’s under design), Russia’s Rubin (Improved Kilo), and Germany’s HDW (unknown, U212A or U214).

Project 75i RFP

March 22/06: Costs. India’s MoD responds to Scorpene-related financial and security breach allegations:

“No contract or contracts were signed with French firms for Rs. 16,000 crore for the Scorpene project. The total cost of the two contracts signed with the two French firms, M/s ARMARIS and MBDA, for the project is Rs. 7,197 crores.

The Government did not pay an extra amount of Rs. 4,500 crore than what was negotiated earlier. On the contrary, after the present Government came to power, it re-examined the project even though all negotiations had been completed in 2002 and the Ministry of Finance had accorded approval to the project in 2003. The present Government held negotiations and was able to achieve a reduction of Rs. 313 crore in the contracts with the two French firms from the negotiated position in 2002… As a result of the negotiations, the Government was also able to achieve several long-term concessions. These included the revision of the escalation formulae to the advantage of the Indian side by adjusting the fixed element in the ARMARIS contract and placing a cap on escalation in the MBDA contract. A cap was also placed on the Exchange Rate Variation (ERV) for calculation of profit for the Public Sector Undertaking, Mazagon Docks Limited (MDL).

Besides the contract with the two French firms, the only other contract that was signed was with the Defence Public Sector undertaking, Mazagon Docks Limited (MDL), for Rs. 5,888 crores for the indigenous construction of the submarines. Therefore, even taking into account the value of contract signed with MDL, the total value of all contracts signed for the Scorpene project is Rs. 13,085 crores out of the sanction accorded for Rs. 18,798 crores towards the project. Out of the balance amount of Rs. 5,713 crores, Rs. 3,553 crores is for payments towards taxes and Rs. 2,160 crores towards other items to be acquired during the project period for which only preliminary steps have been taken. No contract or contracts have been signed for the items under this head. A Technical Agreement was also signed between India and France to ensure the continued support of the French Government to the “project.

The Integrity Pacts signed to ensure transparency of the project, contain, severe penalties in case of breach of any of its provisions. The safeguards include cancellation of the contract, recovery of all advances with interest at a rate of 2% higher than the European Inter Bank Offered Rate or EURIBOR, non-payment by the buyer of any dues on any other contract to make such recoveries, imposition of Liquidated Damages and the recovery of all sums paid to any middleman or agent… The French company that has been accused of committing to pay commission to the alleged middleman has denied all the allegations and has stated that all the e-mails published in the articles in a journal that carried this story are fake and fabricated… The French company has since been reported to have filed a case in the Delhi High Court on 24th February 2006 against the journal which first made the allegations.

…Some press reports also sought to establish a link between the Scorpene project and the breach of security that had occurred in the Directorate of Naval Operations in the Naval Head Quarters… However, the leaked information did not pertain to the Scorpene project.”

March 1/06: AIP?India Looks to Modify Scorpene Subs With MESMA AIP Propulsion.” Submarines 4-6 will include the MESMA system, according to reports. Those reports are contradicted by later reports, which make it clear that no AIP submarines are contracted yet.

The article also includes information about competing AIP systems.

Oct 7/05: After 4 years of delays, India has finally signed a $3.5 billion submarine deal for French-Spanish Scorpene SSKs, to be manufactured under license by Mumbai-based Mazagon Dock Ltd., and delivered to the Indian Navy between 2012-2017. A contract signed between Armaris and Mazagoan docks provides for a team of French technical advisers during the construction of the first 2 submarines.

The government also awarded global missile systems group MBDA the contract to supply its Exocet SM-39 anti-ship missiles, to arm the Scorpenes. Indian Express.

Scorpene deal & Exocets

Appendix A: India’s Current Submarine Force, and Rival Navies Chinese SSK Project 636
(click to view full)

India’s two most prominent competitors are Pakistan and China.

Pakistan currently owns 5 submarines. Their 4 French Daphne submarines (Hangor Class) were retired in 2006. A pair of French Agosta 70 submarines (Hashmat Class) acquired from the French Navy were modified to fire Harpoon anti-ship missiles in 1985, but they won’t last much longer. Three updated Agosta 90Bs (Khalid Class) are also in service, commissioned in 1999, 2003, and 2008, respectively. PNS Hamza has a MESMA Air-Independent Propulsion system that lets the submarine stay underwater for much longer periods of time, and the other two Agosta 90B boats are getting MESMA retrofits. On balance, this will make them slightly more advanced than India’s new Scorpenes.

Pakistan had an opportunity to add to its diesel-electric fleet, but they’re reportedly pursuing nuclear submarine technology, while shelving a plan to more than double their advanced SSK fleet. On balance, that’s good news for India.

As of 2008, China owned about 66 submarines; 18 of them were Type 035/33s, which are Chinese derivatives of the 1960s-era Romeo Class. The Romeos were based on 1944 U-Boat designs, and even the 17 Type 35s aren’t expected to last much longer, or retain much of a role beyond training. If one leaves out all SSBN/SSGN nuclear missile submarines, all 5 of China’s problem-plagued Type 091 Han Class SSN nuclear powered attack subs, and all of the Romeo derivatives, China’s attack sub force alone still stood at 36 boats in 2008: 4 Type 093 Shang Class SSNs, 12 Kilo (Project 636) & Advanced Kilo Class (Project 877) SSKs, 13 Type 039 Song Class SSKs, and 7 Type 041 Yuan Class improvements of the diesel-electric Song Class.

China continues to build Shang Class SSNs and Yuan Class SSKs, which means that overall fast attack fleet numbers can be expected to grow.

As noted above, India currently operates 16 submarines, but only 12-14 can be said to be in service, and the fleet could face a noticeable decline beginning in 2015 or so:

Shishumar Class: 4 German Type 209 SSK submarines, built locally and delivered between 1984 – 1994. The vessels are expected to reach their end of service life between 2016-2024. The United News of India (UNI) reported on Sept 6/04 that Siemens of Germany has offered the Indian Navy an upgrade for the Shishumar Class submarines, which will involve the installation of their Air Independent Propulsion (AIP) system. As of 2014, India has only managed to approve the idea of a non-AIP refit for 2 subs.

Sindhugosh Class: 10 Russian Kilo Class/ Project 877 SSKs, built (1986-1991, 1997, 2000) under a contract between Rosvooruzhenie and the Indian Defense Ministry. They’re very quiet submarines, but there are reports that the Indian Navy considers them underpowered. Most of these subs have received mid-life refits in Russia, but the quality of those refits has been a subject of dispute. Key components of these mid-life refits and upgrades have include tube-launched Klub-S cruise missiles, plus a hydro-acoustic “USHUS” complex, a CCS-MK radio-communication system, and Porpoise Electronic Support Measures to locate radar emissions. A couple of these submarines are still undergoing work in India.

INS Sindhukirti was incapacitated by a bungled refit state-run Hindustan Shipyard Ltd. (HSL), and has been laid up since 2007. INS Sindhurakshak was destroyed by an in-harbor explosion in August 2013, leaving 8 operational subs.

Scorpene Class: 0 built or in service. Earliest expected in-service date is now 2015 for the 1st boat, and that date could slip to 2018. The entire fleet of 6 may not be operational until after 2020.

INS Chakra: 1 Improved Akula Class nuclear-powered fast attack submarine, owned under a 10-year lease from Russia. Its primary purpose is to train nuclear submarine crews for the Arihant Class, but INS Chakra is fully capable, and could be pressed into operational service. The former K-152 Nerpa was handed over in January 2012, but as of January 2013, the boat had issues with readiness.

Arihant Class SSBN. 1 boat in trials, with 3 others under construction. Designed and built in India, this nuclear-powered submarine has a limited ability to launch nuclear-armed ballistic missiles. Arihant was launched in July 2009, and conducted her 1st K-15 missile firing in March 2012, but hasn’t been commissioned yet. The Indian Navy hoped to do so in 2013. See “India’s Nuclear Submarine Projects” for further details.

Additional Readings & Sources Background: India’s Submarines

Background: India’s Nuclear Submarines

Background: Related Technologies

Additional Readings: News and Events

Additional Readings: Rival Navies

Catégories: Defence`s Feeds

Swiss Project Offers Weapon ID Workshop to Journos | Gen Atom to Develop Laser Tracking for MQ-9 Reaper | Finland in Defense Collaboration Talks with US

mer, 24/08/2016 - 01:58
Americas

  • The Small Arms Survey, a Swiss-based research project, will host a series of workshops for journalists on the identification of small arms and light weapons. Aiming to improve the reporting on weapons and ammunition, the event will take place in New York from September 6-7. Participants will learn skills in the identification and recording of weapons and ammunition, tracking them to their source, and understanding the strategic and diplomatic implications of their proliferation.

  • General Atomics has been contracted by the Missile Defense Agency (MDA) to develop a laser tracking system for the MQ-9 Reaper UAV. Valued at $9.6 million, the contract will set the company to design, build and test in the lab key laser subsystems to demonstrate precision tracking. Furthermore, the company will develop and demonstrate an MQ-9 flight representative laser system with the beam train optics required to upgrade a multi-spectral targeting system for use as an active tracking sensor.

Middle East & North Africa

  • US and Russian talks over coordinating activities in Syria still remain to be finalized. The talks, based on “on necessity, rather than trust” according to US Defense Secretary Ash Carter, still have a long way to go before anything is decided. Secretary of State John Kerry and Russian Foreign Minister Sergei Lavrov will meet for another round of discussions on Friday, with the goal of setting up some sort of intelligence sharing agreement in order to coordinate strikes against the Islamic State.

Europe

  • Lithuania’s Ministry of Defense continues with the modernization of their land forces after awarding a $435.1 million contract to the German-Dutch Artec consortium for the provision of 8×8 Boxer infantry fighting vehicles (IFVs). The group, a cooperation between Krauss-Maffei Wegmann and Rheinmetall MAN Military Vehicles will deliver the vehicles equipped with Israeli-made turrets and armed with 30 mm cannons and Spike LR anti-tank missiles. This follows a bilateral cooperation between Lithuania and the Dutch government, who are currently in the process of transferring second hand Army land vehicles east to boost Lithuanian military capabilities.

  • Russia is to fly its first aircraft with a long-range surveillance and control system for the first time in 2018. An Ilyushin Il-76MD, often used as an aerial tanker, will be fitted with the A-100 Premier system which boasts a greater range compared to the US-made Airborne Warning And Control System (AWACS). Once operational, the aircraft will reportedly be able to detect fighter jets at a distance of more than 324 nautical miles, and identify ships at 216 nautical miles.

  • When is a neutral state not neutral? After spending most of the Cold War adhering to strict military neutrality, Finland is in talks with the US over a defense collaboration with the intention to have an agreement signed this Fall. With Finland sharing a 1,300 km border with Russia, it is one of a number of Nordic and former Soviet Baltic states concerned over increased Russian military activity following the annexation of Crimea from Ukraine in 2014. Moscow has denied that it poses a threat to Nordic countries, but this hasn’t stopped another neutral nation, Sweden, signing a deal with the US in June similar to what Finland now hopes to achieve.

Asia Pacific

  • The US State Department has approved another $60 million arms sale to the Afghan government with FN America standing to be the principle contractor. 4,891 M16A4 5.56mm rifles, 485 M240B 7.62mm machine guns and 800 M2 .50-caliber machine gun alongside an unspecified numbers of M249 light automatic machine guns, M1110 7.62mm sniper rifles and MK-19 40mm grenade launchers will be transferred as part of the deal. Since 2002, the US has spent over $68 billion training and equipping the Afghan Armed Forces.

  • Saab has announced that it has been contracted by the New Zealand government to provide the New Zealand Army with the Tactical Engagement Simulation System, the company announced Monday. The five-year deal offers a wide range of realistic training scenarios that will enhance the army’s ability to conduct and analyze the outcomes of force-on-force exercises. So far, the company has provided the system to US, British, Canadian, Australian, and NATO forces.

Today’s Video

The Boxer 8×8:

Catégories: Defence`s Feeds

The Fighter Still Remains… The Boxer MRAV APC Family

mer, 24/08/2016 - 01:45
Boxer MRAV
(click to view full)

Wheeled armored vehicles have become much more common, but the Dutch-German Boxer stands out from the crowd. Its English acronym is “Multi Role Armoured Vehicle” (MRAV), but rather than being a family of different vehicles, the Boxer will use a single chassis, with snap-in modules for different purposes from infantry carrier to command, cargo, ambulance, etc.

The base vehicle has a maximum road speed of 100 km/h (60 mp/h) and an operational range of 1,000 km (600 miles). In its troop carrying configuration, it has a crew of 2 and can carry 10 fully equipped troops. The MRAV is fighting for space in a crowded market, but its principal countries are beginning to give it the front-line credibility it needs to succeed.

Boxer MRAV: The Vehicle Boxer modular concept
(click to view full)

The base 8×8 vehicle provides a load capacity to 8 tonnes (9 tons) and has an internal capacity of more than 14 square meters. The Mission modules fit into the base vehicle’s steel shell, incorporating a primary safety cell with a triple floor and shaped sides to deflect mine blasts. Ceramic modular armor is sandwiched between the vehicle cell and the steel coat, and all three elements are secured by fastening bolts. The shaped sides of the modules also work to deflect mine blasts away from the soldiers inside, while a double-lined hull soaks up critical blast deformation.

The exact maximum weight of a Boxer MRAV depends on the version, and on its add-on armor package. The base is currently about 30 tonnes (33 tons), but its current design allows it to grow to 36 tonnes (39.6 tons) without any additional modification to the drive line. The vehicle and modules are air transportable in an A400M or larger aircraft, and modules are interchangeable in less than one hour.

Boxer MRAV: The Program CV90-35 MkIII
(click to view full)

In mid-2006 the Netherlands decided to remain in the ARTEC consortium’s joint Boxer MRAV modular armored personnel carrier project with Germany. Despite earlier reservations, Dutch secretary of Defense Cees van der Knaap declared to the 2nd Chamber that the country wanted to continue with the project. By June 28th, 2006, a release noted that the Chamber had given the green light; the APC’s price has apparently been reduced to an acceptable level following negotiations with Stork. A formal contract worth up to EUR 1.2 billion (about $1.6 billion) was finally signed in December 2006, clearing the way for both Dutch & German vehicle production.

The Royal Netherlands Army is purchasing 200 Boxer vehicles for transport, engineering, command, and transportation of wounded, replacing some of their YP-408s and all of their M577s (command post version of the M113). The 200 Boxer MRAVs will be delivered in 5 versions – 58 ambulances, 55 Command Post variants, 41 engineer group (pioneer) vehicles, 27 cargo vehicles, and 19 cargo/command-and-control vehicles to replace the current YPR 765 tracked vehicles. Note that this figure is down from initial estimates of 384 vehicles.

In addition to the Boxers, the Dutch Army will also be operating BAE Hagglunds’ CV90-35 MkIIIs as Infantry Fighting Vehicles.

Land trials, with RWS
(click to view full)

Under current plans, Jane’s revised reports indicate that the German Army is due to take delivery of 272 Boxer vehicles in 3 baseline versions: 135 armored personnel carriers (APCs), 65 command post (CP) variants, and 72 heavy armored ambulances. The Boxers will replace some Fuchs 6 x 6 and tracked M113-series APCs currently in service; like the Dutch Boxers, they will fill a middle weight armor role alongside heavier tracked Infantry Fighting Vehicles – in this case, the new KMW/Rheinmetall Puma.

The Boxer program is being managed by the European OCCAR (Organisation for Joint Armament Cooperation) Armaments Agency. Britain was initially part of the MRAV consortium as well, but left in 2003 to pursue its own future armored vehicles project called FRES. The industrial contractor is ARTEC GmbH – acting on behalf of the consortium formed by Kraus-Maffei Wegmann (36%), Rheinmetall Landsysteme (14%) and Stork PWV (50%).

Manufacturing of the vehicles will take place in both countries. Amsterdam-based Stork PWV is the national prime contractor and system integrator for the Dutch Boxer vehicles. As a partner, Stork Special Products is also responsible for assembling of the power pack consisting of a MTU engine, angular gear, transmission, cooling block and over 1,200 minor parts in total. They’re also developing the Environmental Control System, an air-conditioning system with integrated NBC(nuclear, biological, chemical) protection.

Contracts and Key Events MRAV Ambulance
(click to view full)

August 24/16: Lithuania’s Ministry of Defense continues with the modernization of their land forces after awarding a $435.1 million contract to the German-Dutch Artec consortium for the provision of 8×8 Boxer infantry fighting vehicles (IFVs). The group, a cooperation between Krauss-Maffei Wegmann and Rheinmetall MAN Military Vehicles will deliver the vehicles equipped with Israeli-made turrets and armed with 30 mm cannons and Spike LR anti-tank missiles. This follows a bilateral cooperation between Lithuania and the Dutch government, who are currently in the process of transferring second hand Army land vehicles east to boost Lithuanian military capabilities.

June 25/14: Dutch delivery. Formal delivery of the 1st Dutch Boxer to the 13th NL Brigade’s medical company. The Director of the NL Defence Materiel Organisation symbolically delivers the vehicle by handing over a wrench that serves as an emergency opener for the rear door. Sources: OCCAR, “Formal handover of first Netherlands BOXER vehicle to the customer”.

April 7/14: Update. OCCAR-EA’s BOXER Programme Manager has approved delivery of the first Dutch Boxer, an ambulance variant. The NL AMB BOXER vehicle is the first BOXER vehicle built at the new Rheinmetall MAN Military Vehicles – NL facilities in Ede, The Netherlands. The schedule foresees that the last of the 52 NL AMB will be delivered in January 2015, to be followed with the next NL BOXER vehicle types: Command Post (CP), Engineers Group (GNGP) and Cargo (CAR). The Dutch are getting 8 Driver Training Vehicles (DTV), and 192 Boxer variants for delivery by the end of 2017.

Germany has already received 225 vehicles, built by KMW in Munich and by Rheinmetall in Kassel, leaving just 47 left to be delivered to Germany before the end of 2016. Sources: OCCAR, “Start of The Netherlands’ Ambulance BOXER delivery”.

May 2012: LANCE. Rheinmetall announces that a concept study equipping the Boxer with Rheinmetall’s LANCE medium caliber turret has finished trials at their test center in Unterluss. The firm worked with RMMV Kassel, RLS Augsburg and RLS Kiel, to combine the LANCE turret system with a Boxer module, and modify the mission module.

Jan 24/12: The German Bundeswehr produces a video about the Boxer’s combat deployment in Afghanistan. Deployment is going well, but they may want more storage space. That’s always an interesting challenge with APCs. The Boxer CP variant is set to arrive in theater in February 2012. German Bundeswehr [in German] | Aviation Week.

July 22/11: German Boxer A1 MRAVs ship out to Afghanistan, aboard chartered AN-124 aircraft.

A1 is a modification set designed for ISAF operations in Afghanistan. It includes extra armor, raising the FLW-200 remote weapon station 30 cm/ 1 foot to give it better coverage high and low, and an appropriate camouflage pattern for the ISAF region. FuInfoSys networking between the Boxer and the infantry group equipped with the IdZ-21 Future Soldier system is standard. KMW.

March 3/11: Germany readies to deploy the Boxer. Its driver training school in Dornstadt received 7 Driver Training Vehicles (DTV) in 2010. In February 2011, another 8 Boxer APCs were delivered to 292 Jaegerbattalion in Donaueschingen, in preparation for the vehicle’s deployment to Afghanistan with this unit in August 2011. OCCAR | German Army [in German].

Oct 7/10: BAE Systems announces a $3.6 million contract from Krauss-Maffei Wegmann (KMW) to manufacture and deliver SCHROTH brand 4-point harness safety restraint with integrated airbag systems, to equip for 125 German Boxer vehicles. BAE will produce 7 restraint systems per vehicle (875 total), along with replacement parts. As part of the agreement, SCHROTH engineers have also developed a special, self-administered diagnostic tool for soldiers to verify that the systems are in working order. Deliveries of the new restraint system are expected to be completed in 2014.

Airbags to protect passengers are nothing new in civilian vehicles, but they’re still rare in combat vehicles. In the event of a crash, sensors on the SCHROTH harness measure the resulting acceleration, and send signals to gas generators whose micro pyrotechnical charges deploy the airbags in a fraction of a second.

April 27/10: A brief to the Dutch Parliament says that Boxer MRAV “Drive Module” (main body) qualification will not be done by the end of 2010, as scheduled. The vehicle did not fully meet contracted standards, and Germany’s intent to use Boxers in Afghanistan in 2010 has had effects of its own.

An agreement was reached with Germany for post-delivery qualifications in 2010, during so-called “Reliability Batch Trials,” with any changes Germany requires made at the manufacturer’s expense. Agreements were also made concerning post-qualification of some Drive Module sub-components, and alteration of the Logistic Qualification Course.

In contrast, the Dutch absolutely require pre-qualification before they’ll accept delivery. That means delays for series production of Dutch vehicles, and to the future Cargo, Ambulance and Command versions. Extra budget is also being requested to modify the Dutch C2-LAN system to a full C4I system. Kamenbrief [in Dutch]

Feb 8/10: KMW subsidiary Dutch Defense Vehicle Systems (DDVS) opens a new production facility in Helmond, near Eindhoven, NL. The facility will produce all hulls and several mission modules for the German-Dutch Boxer vehicle program, which currently stands at a total of 472 vehicles. Helmond will also be the site for logistics and maintenance service to the Dutch fleet of Fennek reconnaissance vehicles. KMW release [PDF]

Sept 23/09: At a ceremony in Munich, Rheinmetall Defence and Krauss-Maffei Wegmann (KMW) transfer the first serially produced Boxer to the Organisation Conjointe de Coopération en matière d’Armement (OCCAR), which is administering the Boxer project, and Germany’s Federal Agency for Defence Technology and Procurement (BWB). Rheinmetall | KMW [PDF format].

May 8/08: ARTEC’s Boxer MRAV made a dramatic comeback to reach the finals, but lost to General Dynamics MOWAG’s Piranha-V in Britain’s FRES-Utility competition. | UK MoD release | General Dynamics UK release.

June 14/07: Stung by criticism that the MoD has wasted years in order to select off-the-shelf vehicles that may not be survivable enough, Minister for Defence Equipment and Support Lord Drayson fires back in a public forum:

“Yes, the Boxer was a programme the MoD pulled out of when it was known as the MRAV programme. We took that decision in 2002 in light of the requirement at the time. We have since reviewed the FRES requirement in light of recent operational experience in Iraq and Afghanistan. Force protection in theatre now has a higher priority than strategic deployability – I don’t think anyone would argue with that view. When the situation changes our procurement process must be capable of responding to that change… I’m not going to go into the details of the protection FRES will have in a public forum… But to suggest that we are ignoring the threats we face in Iraq and Afghanistan today when we set the requirement for our future vehicles is wrong. And the idea that taking into account the full range of threats FRES will be less well protected than the patrol vehicles you list (such as the Mastiff) is also wrong. Finally, let’s all be clear that FRES is neither a protected patrol vehicle nor a replacement for Warrior…”

Given Canada’s poor experiences with wheeled vehicles in Afghanistan, and the Stryker’s emerging difficulties against new IED land mines in Iraq, this may become a recurring subject.

June 8/07: Britain’s MoD announces the FRES finalists. Surprisingly, the SEP vehicles don’t make that list, nor do other test platforms. All of the finalists are wheeled: General Dynamics MOWAG’s Piranha IV, Nexter (formerly Giat’s) VBCI – and the KMW-ARTEC Boxer, which Britain pulled out of several years ago in order to pursue FRES.

The vehicles will go on to the “trials of truth,” and the MoD says the outcome of the trials will be announced by the end of November 2007. At that point, “one or more utility vehicle designs will go forward for detailed assessment.” UK MoD release | Nexter release | KMW release.

May 23/07: Jane’s Defence Weekly reports that ARTEC expects to deliver the first Boxer 8 x 8 MRAV to the German Army on schedule in late 2009, with deliveries to the Royal Netherlands Army following in 2011.

Dec 19/06: At Bernardkazerne in Amersfoort, the Netherlands, a contract is signed for series deliveries of the Boxer Multi-Role Armoured Vehicle to the Netherlands and German armed forces. The series production contract covers up to 272 vehicles for Germany and the 200 vehicles for the Netherlands, with a total value of EUR 1.2 billion (about $1.58 billion), of which Stork will receive EUR 500 million (about $660 million) from 2008 – 2016. Up to 70% of Stork’s turnover will be subcontracted. Deliveries of the vehicles will start in 2009 and extend for seven years.

The contract for Stork encompasses a continued design for 2 new Boxer versions, the series production of 200 Boxer vehicles in 5 versions and an initial in-service support package. The Netherlands army will use the Boxer in 5 different versions: an ambulance vehicle, command post, engineer vehicle, and two types of cargo vehicles. See Stork release.

Dec 13/06: The Budget Committee of the German Bundestag approves MRAV acquisition. Formal signing of an OCCAR acquisition contract by representatives of Germany and the Netherlands is expected to take place on December 19, 2006. The order will reportedly encompass 400 vehicles, 200 of which are earmarked for the German Bundeswehr. Under this contract, the Germans would also have an option for a further 72 units configured as field ambulances. See Rheinmetall release, also KMW release in German.

Oct 13/06: The Dutch Ministerie Van Defensie issues a release noting that the Council of Ministers has approved the purchase of 200 Boxer APCs for the Dutch Army; the final decision now moves on to Parliament (and see Oct 10/06 entry below). The first Boxer MRAVs will enter service in 2011, and deliveries will be complete in 2016. Defense Aerospace’s translation adds some additional information that doesn’t appear to be in the Dutch release, noting that:

“On the basis of information supplied by industry, the operating cost of the Boxer for 200 vehicles over a life span of 30 years was initially estimated at approx. 1,125 million euros (excl VAT). More recent estimates have allowed the Ministry of Defence to reduce the projected life-time operating cost to 938 million euros (excl VAT), based on the best available data.”

In approximate US dollars, the range would be $1.176 billion – $1.41 billion, or about $5.88 – $7.05 million per vehicle over a 30-year operating period.

Oct 10/06: Jane’s International Defence Review reports that The Netherlands national elections scheduled for November 22, 2006 could lead to changes on the defense front. “With the electorate more or less split down the middle, a change of government from the current centre-right coalition to a new centre-left or even 100 per cent-left coalition is not impossible.” Such shifts would have implications for programs like the Boxer MRAV. As it happens, the Dutch elections produced losses for all major parties and left Parliament in a similar balance.

Additional Readings & Sources

Catégories: Defence`s Feeds

First Glimpse of NG’s T-X Competitor Hits Twitter | Cali Woman Gets 4 Years in Fed Prison for Illegal Exports to China | Japan’s Defense Upgrades to Beef Up F-15J Fleet

mar, 23/08/2016 - 01:58
Americas

  • The US Missile Defense Agency’s (MDA) plan to equip unmanned, high-endurance, long-endurance aircraft with high-power electric lasers in order to shoot down ballistic missiles in their boost phase will see a proof of concept test between 2020-2021. It’s been reported that this fall, the agency plans to award contracts to two industry teams for preliminary design and fabrication of flying laser testbed aircraft beginning in 2018. One of the two teams is Lockheed Martin, who is rumored to be contemplating the use an unmanned version of the Cold War-era U-2 Dragon Lady as one of its potential platforms.

  • Pictures have surface on Twitter unveiling the first glimpse of Northrop Grumman’s offering in the USAF T-X competition. The trainer prototype, Model 400, was snapped on a runway in Mojave, California during a high speed taxi test, and sports a prominent, single vertical fin and a nose section similar to the T-38.

  • A court in Miami has sentenced a California woman to 4 years in federal prison after being convicted of illegally exporting US military gear to China. Wenxia Man said she colluded with a spy who specializes in copying foreign military equipment for the Chinese government. In June, a jury convicted Man of conspiring to export and actually exporting military equipment without the proper license, which involved engines used in F-35, F-16 and F-22 fighter jets as well as an MQ-9 Reaper UAV.

Middle East & North Africa

  • A deal has been struck between the Algerian government and Leonardo for the sale and home-made production of a number of the helicopters, including the AW101. The move is being viewed by analysts as a way of both increasing Algerian defensive capabilities and domestic job creation as well as potentially preventing an Arab Spring type event among its population’s youth. Algeria is all too familiar with security threats following a number of attacks on its oil and gas facilities by Jihadist militants in recent years; most notably 2013’s In Amenas hostage crisis, which left 39 foreign hostages, an Algerian worker, and 29 militants dead.

Africa

  • Nigeria is to import a number of Mi-35M attack helicopters and the UAE-made Yabhon Flash-20 UAV. The purchases will boost the government’s capabilities against the Jihadist insurgency of Boko Haram in the country’s north-east, as well as attacks against its Niger Delta oil installations in the south. Delivery of the hardware is expected to start arriving later this year and continue into 2017.

Asia Pacific

  • Incheon-class frigates operated by the South Korean Navy are to be armed with Haeseong II ship-to-surface cruise missiles. Six of the vessels have already been produced as part of the first batch with 18-24 planned in total. While Seoul had initially scheduled the missiles to be incorporated on all vessels from batch two onward, it was decided to retrofit the first six as well, with work scheduled to commence next month. To accommodate the new missiles, the ships will have angled canister launchers installed on their decks.

  • With a national-record breaking defense budget on the cards for Japan next year, upgrades to increase the country’s air-superiority capabilities are being rolled out by the government. With Japan’s F-35 deployment not due until the end of 2017, plans are underway to upgrade and upgun its current F-15J fleet. Among the changes are plans to double the number of air-to-air missiles the F-15J can carry to 16 as well as an expansion of the jet’s lifespan.

  • Plans to deliver Russian-made equipment to the Afghan Armed Forces has been delayed by India. The cause, a lack of spare parts for an Mi-25 helicopter. New Delhi has already transferred three of the attack helicopters to Kabul and has received pleas by some in the US military to increase its supply of Russian weapons and parts. An embargo imposed on Moscow has seriously hampered the availability and access to spare parts for Afghanistan, which operates a hodgepodge selection of various military vehicles.

Today’s Video

Iran unveils its indigenous Bavar-373 air-defense system:

Catégories: Defence`s Feeds

USAF Taps Gen Atomics for $370.9M Add’l MQ-9 Reapers | LM & Raytheon Submit for Potential Patriot Replacement | Elbit Launches Maritime Variant of Skylark C

ven, 19/08/2016 - 01:58
Americas

  • General Atomics is to provide 30 MQ-9 Reaper UAVs to the USAF. The $370.9 million contract will be completed by May 31, 2019.

  • Norwegian missile manufacturer Kongsberg has chosen Raytheon to produce launchers for its (NSM) in the USA. The duo are offering the system for use on the US Navy’s Littoral Combat Ships. Final assembly, integration and testing of the NSM will also be undertaken by Raytheon.

  • Both Lockheed Martin and Raytheon have submitted offers for upgraded integrated air-and-missile defense radar concepts as the US Army decides on its eventual Patriot system replacement. The service was initially planning to integrate the Medium Extended Air Defense System (MEADS), but this was ultimately shelved. As a result, the request for fresh radar concepts may prove a progressive first step in deciding whether to upgrade Patriot or go for something new.

  • The assembly hanger for the T-50A is up and running according to the trainer’s manufacturer Lockheed Martin. Situated at the South Carolina Technology and Aviation Center (SCTAC), the 38,000 square foot Hanger 11 underwent a three month retrofit after previously playing host to modifications on P-3 Orion and C-130 Hercules aircraft. Assembly of the T-50A will commence with the supply of parts fabricated by South Korea partner KAI and is being offered as part of the USAF’s Advanced Pilot Training program.

Middle East North Africa

  • Elbit Systems has launched a maritime variant of its Skylark I Mini UAV. Dubbed Skylark C, the new system offers the extended operational capabilities of its land-based counterpart and provides the ability to inspect maritime activities from a safe distance, observe targets, perform reconnaissance over coastal areas, and perform continuous covert surveillance. Those standing to benefit from this latest offering include special forces and other small-scale naval crews.

  • Italy has confirmed that it has sent special forces to Libya. They now join British forces already present in Libya, training militias to tackle Islamist forces connected to the Islamic State. Italy is one of the first European countries feeling the effects coming from the current turmoil unfolding in Libya, with the ongoing lawlessness fueling a smuggling trade and a steady flow of migrants and refugees toward Europe.

Europe

  • The UK is to exercise its option to acquire one more Airbus Zephyr S lightweight solar-powered UAV. This adds to the two already ordered in February of this year and will be ready for flight trials in the summer of 2017. Zephyrs are capable of sustaining flight at 65,000ft for days at a time providing surveillance.

Asia Pacific

  • All 13 C-130Js operated by the Australian Defense Forces are now installed with the latest networked battlespace system. Engility’s Joint Range Extension (JRE) TDL system will see its first operational use during exercises at training ranges in the country’s Northern Territory. This marks the first time that a C-130 has integrated Link 16 with a loadmaster station on board.

Today’s Video

KC-46 tanker refueling mission:

Catégories: Defence`s Feeds

The Larks, Still Bravely Singing, Fly… Elbit’s Skylark UAVs

ven, 19/08/2016 - 01:52
Skylark-I launch
(click to view full)

Elbit’s Skylark-I mini-UAV has become a popular choice for portable “over the hill” surveillance, as nations like Israel, Australia, Canada, France, Mexico, Poland, Sweden, et. al. adopt it for battlefield use. Bental’s electric propulsion system using brushless permanent magnetic motors is an especial benefit to Skylark operators, as its silent operation avoids warning enemy targets of its presence.

In an effort to build on that success, Elbit soon introduced the larger Skylark-II for battalion level UAV operations, fired from a rail launcher mounted on small wheeled vehicles rather than launched by hand. In exchange for the launcher requirement and a doubling of the crew size to 2, the Skylark-II gains a mission radius of 50-60 km instead of 10 km, and the ability to mount larger sensor packages. Awards soon followed from sources as varied as Popular Science and industry analysts Frost & Sullivan – but awards don’t pay the bills. Fortunately, orders have followed.

The UAVs Skylark-I Concept
(click to view full)

Skylark I comes in 2 versions. The standard Skylark I is launched by hand, and flies below 1,000 feet for up to 1.5 hours, with a mission range of 10 km/ 6 miles. Each “system” comprises 3 UAVs, 2 surveillance and targeting payloads, a ground station, an operating console and a communications link. Skylark I competes in the mini-UAV market, and remains a serious international competitor to Aerovironment’s popular RQ-11B Raven.

The new Skylark I-LE (long endurance) increases flight time from 1.5 hours to 3 hours, with a mission range “greater than 15 km.” It can carry the same payloads etc. as Skylark I, usually Controp’s D-STAMP or the new uncooled U-STAMP infrared payload.

The LE Block 2 swaps in a new engine and power system, and touts the performance of a Day/Night sensor payload – which is probably Controp’s M-STAMP.

Skylark-II launch
(click to view full)

The larger Skylark II cannot be launched by hand, like its counterparts; it must use a rail launcher instead. The launcher is usually towed by a small wheeled vehicle, and requires 2 crew to operate. The UAV can fly at medium altitudes, with a flight time of around 6 hours, a mission radius of 50-60 km/ 30-36 miles, and larger sensor packages on board. Skylark II competes in the lower tier of the conventional UAV market, alongside models like Boeing’s ScanEagle/ Integrator, Textron AAI’s RQ-7 Shadow, Aeronautics’ Aerostar, IAI’s Searcher, etc.

Its standard mission package is a Micro-CoMPASS turret with a day sensor, cooled infrared night sensor, and a laser illuminator and tracker. An advanced digital communication system from Tadiran Spectralink rounds out its capabilities. Israeli forces will soon be swapping in Controp’s TD STAMP surveillance turret.

There’s also a Skylark II-LE, which could become the standard Skylark II export offering. It moves the engine to the rear, alters the fuselage, and adds a new tail configuration. Endurance has more than doubled to over 15 hours, and with its new datalink, it can operate out to 150 km. This will give it the ability to compete with popular offerings like Boeing’s ScanEagle.

Contracts & Key Events

Note that some sales may not be publicized, or may not be detailed, as is often the case with purchases from Israel. Reports of Skylark buys for Croatia, the Czech Republic, Hungary, Macedonia, and Slovakia have been rumored, but they aren’t reproduced here for lack of confirmation. Israel has also made large sales to countries like Azerbaijan and Georgia, but those sales have not been detailed, so it’s hard to tell if Skylarks have been part of the package.

2015 – 2016

Skylark I-LE Block 2
(click to view full)

August 19/16: Elbit Systems has launched a maritime variant of its Skylark I Mini UAV. Dubbed Skylark C, the new system offers the extended operational capabilities of its land-based counterpart and provides the ability to inspect maritime activities from a safe distance, observe targets, perform reconnaissance over coastal areas, and perform continuous covert surveillance. Those standing to benefit from this latest offering include special forces and other small-scale naval crews.

November 18/15: Uruguay has expressed an interest in purchasing a number of the Elbit Skylark I UAV after watching them being deployed by the Israeli Defence Forces. The UAV has been deployed extensively by the IDF at battalion-level system in support of artillery units and is operational in many militaries worldwide including Australia, Sweden and Canada. Uruguay would deploy the UAV in order to monitor areas which may potentially host terrorist threats. In August of this year, the Al-Qassam Brigades of Hamas captured one of the drones after it fell into the Gaza Strip. They claimed to have been able to make its services operational after checking it wasn’t booby trapped.

2012 – 2013

American SUAS ‘win’; Israeli Upgrades; I-LE Block 2 introduced;

Jan 3/13: SUAS 2013-2017. U.S. Army Contracting Command in Natick, MA awards a 5-year, $248 million multiple-vendor fixed-price Small UAS contract. From FBO.gov:

“The Army currently has fielded 1,798 RQ-11B systems and 325 RQ-20A systems and has a requirement to sustain and maintain this existing fleet. The Army has met 92% of the RQ-11B Army Acquisition Objective (AAO), and has met 83% of the anticipated need for RQ-20A (required by USFOR-A-issued JUONS). Additionally, the current [DID: RQ-11B & RQ-20A] fleet has pre-planned spiral upgrades such as the Gimbal payload, which will be competed and retrofitted under this effort. The need exists to complete the AAO; maintain, sustain and upgrade the fleet; and procure future SUAS Systems as required by DoD, Other Government Agencies (OGA) and foreign countries.”

Vendors will compete for each order, and work can include full Unmanned Aerial Systems, upgrades, testing, packaging, marking, and storage and shipping. Work location will be determined with each order, and the contract runs until Dec 20/17. The bid was solicited through the Internet, with 5 bids received. All 5 qualified to compete:

  • RQ-11B Raven & RQ-20A Puma: AeroVironment Inc. in Monrovia, CA (W911QY-13-D-0073). Obviously, they’re in a strong position for fleet upgrades at least, as well as for additional UAVs.

  • NOVA Block III: Altavian in Gainesville, FL (W911QY-13-D-0074). They’re not a household name, but their air/land UAV is working with the USACE (Army Corps of Engineers). They partner with ISR Group Inc. in Savannah, TN for support and service.

  • Skylark I-LE Block 2: Elbit Systems of America LLC in Fort Worth, TX (W911QY-13-D-0075).

  • Skystinger, and others: Innovative Automation Technologies LLC in Gainesville, FL (W911QY-13-D-0076). Skystinger is more like the RQ-11 Raven, while their AXO is closer to the RQ-20 Puma. Note that The Skystinger is the only UAS that IAT could confirm, but they did say there was more than 1 UAS offered.

  • Desert Hawk III: Lockheed Martin Corporation, Owego, NY (W911QY-13-D-0077). The Desert Hawk has been successfully used on the front lines by British forces.

The AECV contract expires in 2013, so this appears to be the follow-on. See also: AeroVironment | Elbit Systems | Gainesville Sun.

SUAS multi-vendor

Dec 13/12: Israel. Israel’s Artillery Corps already employs Skylark I-LE UAVs within its “Sky Rider” unit. The unit is upgrading to the Skylark I-LE Block 2, with the “Version 10” operating system and new communications links. Artillery units are getting a new “Tamoon” command and control system, and the new UAVs will be compatible with Tamoon and with the Army-wide DAP (Digital Army Program). Once the UAV is attached to the DAP, Sky Rider Commander, Lt. Col. Uri Gonen says that battalion commanders will be able to pinpoint a UAV’s location on their screens, and determine the area it is observing.

The Artillery Corps is also looking at a brigade-level UAV, and has held some initial trials. That might be an opportunity for the Skylark II-LE, but there are a number of other UAVs within Israel that could compete for this role. This is Israel, so they expect the winning UAV to be in the field within 18 months. Source: Ba’Machane (official IDF magazine), via Elbit Systems. Note that the translation here is “Sky Rider,” not Sky Raider.”

Aug 2/12: I-LE block II. Elbit Systems announces that it will showcase the new Skylark I-LE Block II at this month’s AUVSI conference in Las Vegas, NV. The new UAV can be built in the USA, and adds a new engine and power system, plus an improved day/night sensor turret.

June 11/12: Sweden. AeroVironment announces that they’ve won Sweden’s competition, and will supply 12 SUAS systems in a mix of RQ-20A Puma AE and Wasp III air vehicles, plus a set of common ground stations, training, and logistics support. Contract options could increase the buy to a total of 30 systems. The firm adds a roundup of foreign RQ-11 Raven, RQ-20 Puma, and Wasp customers, which demonstrates why they’re Elbit’s top competitor:

“In addition to Sweden, other international governments that have purchased AeroVironment small UAS include Australia, the Czech Republic, Denmark, Estonia, France, Italy, Lebanon, the Netherlands, Norway, Saudi Arabia, Singapore, Spain, Thailand, Uganda, and the United Kingdom.”

Swedish loss

May 23/12: Airbag issues. Flight International:

“Israel Defense Forces confirms that operations of the mini-unmanned aerial vehicle have been halted until further notice, pending the completion of work to determine what caused its airbag to be deployed in flight several times during recent weeks… Flights… will resume immediately after the issue has been resolved, with the aircraft mainly used by artillery units to provide an “over-the-hill” intelligence capability.”

2008 – 2011

Wins in Israel, France; Canada goes another way; Skylark I-LE introduced. Skylark-I LE
(click to view full)

Dec 13/11: Sweden. Sweden bought 6 Skylark UAV systems in 2007, but it’s looking to replace them with a follow-on buy. Their FMV is reportedly looking to buy a 2-tier system with ranges of 10 and 20 km, respectively, plus associated common ground control stations.

That could open the door to a buy of Skylark 1LE and Skylark II UAVs, but it also introduces new competitors into the mix. Shephard Media.

Dec 1/11: The UAS Dynamics joint venture ends, as Elbit Systems USA buys General Dynamics’ share. It was marketing Elbit’s Skylark I/II, Hermes 90, and Hermes 450 UAVs in the USA. Elbit Systems.

UAS Dynamics

Dec 20/10: Elbit Systems Ltd. announces a $16 million contract from the Polish Ministry of National Defense to supply a testing set of mobile multi-sensor monitoring and surveillance systems for Poland’s Rosomak, a variant of Patria’s 8×8 AMV wheeled Armored Personnel Carrier. The systems include Skylark UAV integration. Read “Poland & Elbit to Cooperate on Rosomak APC Surveillance Upgrade” for more.

Poland

Aug 3/10: Canada. Canada, previously a Skylark customer, buys [PDF] 5 of Prioria Robotics Maveric mini-UAV systems for use in Afghanistan. See also Nov 19/06 entry.

March 8/10: France. France’s DGA delivers Skylark I and Wasp-III mini-UAVs to French Special Forces, less than 3 months after contracts were signed for Elbit Systems’ Skylark (Oct 18/09) and Aerovironment’s Wasp-III (Nov 4/09), following verification and testing.

The DGA says that the Skylark delivery completes a set, following earlier DGA deliveries in 2008 and 2009. The Wasp-IIIs, on the other hand, will be entering an operational evaluation phase to assess their future value. DGA [in French].

Jan 26/09: Israel. Elbit Systems issues a clarifying release [PDF], adding that that the Israeli “Sky Raider” contract is worth approximately $40 million.

Dec 16/08: Skylark I. Elbit systems announces that Israel’s Defense Ministry has picked the Skylark I-LE to fill the battalion-level “Sky Raider” IDF tender. The IDF has been operating Skylark Is since 2005, but this purchase will supply mini-UAVs for all IDF Ground Forces battalions, including training and logistics support battalions. When the non-linear battlefield makes front lines irrelevant, and your country is 15 km wide at its narrowest point, that’s a smart decision.

Defense Update reports that the IDF intends to buy up to 100 systems at an estimated cost of $50 million, and Flight International states that options could raise the deal’s value to $100 million equivalent. Each system comprises 3 UAVs, 2 U-STAMP uncooled surveillance and targeting payloads developed by Controp, plus a ground station, an operating console and a communications link.

Elbit’s Skylark I LE had to compete with several Israeli UAVs, owing to the country’s strength in that sector. Competing options included IAI’s Bird’s Eye 400/600; Aeronautics Defence Systems Ltd’s Orbiter, which has won some export success; RAFAEL’s shoulder-launched Skylite A and the larger 2-man Skylite B; and Top I Vision/Rotem’s Casper 250.

Note that Defense Update and Flight International have different accounts regarding the competitors and deal value. While DID respects Flight International, Defense Update has earned its reputation as the top source for developments in Israel. Elbit Systems release | Defense Update | Flight International.

Israel’s Sky Rider artillery UAV program

Sept 1/08: Skylark I. Elbit Systems Ltd. announces [PDF] a contract to supply Hermes 450 and Skylark 1 UAV systems to “a country in the Americas” for the total of approximately $25 million. All UAVs are to be delivered within a year.

New information points to Mexico as the customer, with 2 complete Hermes 450 systems and a complete Skylark system.

Mexico

Skylark-I, ADF in Iraq
(click to view full)

Aug 3/08: Skylark I. Australia places its 3rd Skylark I mini-UAV order, valued at “several million dollars.” Elbit informs DID that these are standard Skylark Is, not the new Skylark I-LE model.

Australia is also working with Boeing to lease ScanEagle UAV services as its mid-tier solution, instead of the canceled Project JP129 Elbit Systems release [PDF].

3rd Aussie order

June 18/08: Upgrades. UV-Online reports that Elbit has made significant changes to its line of Skylark UAVs:

“Meanwhile the work on the company’s Skylark UAVs has vastly improved the performance of both the Skylark I and II. The company has changed some of the elements of the airframe structure, integrated a new battery and looked at power management. According to officials the new Skylark I-Long Endurance (LE) and Skylark-II LE can now stay aloft a lot longer.

The Skylark I-LE has doubled its endurance from 90 minutes to three hours with a mission range greater than 15km. The Skylark II-LE is almost completely a new system in its outward image with a much changed aerostructure. The engine has bee moved to the rear, the fuselage has been altered and there is also a new tail configuration. The endurance has more than doubled to over 15 hours and with a new datalink it can operate out to 150km.”

March 24/08: Skylark I. Elbit Systems Ltd. announces [PDF format] that it has won “a tender involving 10 of the leading UAV manufacturers worldwide,” and will supply Skylark I UAV systems to France’s Special Forces. This contract marks Elbit Systems’ first UAV contract with France.

France

2005 – 2006

Wins in Australia, Canada, South Korea; Problems with Canadian UAVs; Skylark II introduced. Skylark II concept
(click to view full)

Dec 17/07: Skylark II. Elbit System announces that the Skylark-II has been selected by the South Korean military as their “preferred solution” in ” a tender involving extensive technical tests and including UAV manufacturers from all over the world.” The first phase of the contract includes one comprehensive Skylark® II system. Additional systems are expected in the future.

The UAVs will be equipped with their standard-issue payload: Elbit subsidiary Elop’s advanced 8″ Micro-CoMPASS turret with a day sensor, cooled night sensor, laser illuminator and tracker; and an advanced digital communication system from Tadiran Spectralink, which is about to be wholly merged [PDF] into Elbit Systems. Elbit release.

South Korea

June 17/07: Recognition. Elbit Systems Ltd. announces that business research and consulting firm Frost & Sullivan has presented them with a “Best Innovative Product Award” for 2007 in the Aviation & Defense Category, for their Skylark-II. It is praised for bringing the capabilities of more expensive UAVs to a smaller and cheaper vehicle. Philadelphia Examiner | Israel Times.

Nov 19/06: Skylark I. Israel’s Globes business daily relays a Flight International report re: Canadian experiences with the Skylark I in Afghanistan:

“The British weekly quotes a technical director in the Canadian Army interim small UAV programme, Captain Rob Sanders as saying, “Most of them aren’t flying in Afghanistan. For some reason, in some parts of the country it will fly great, or today it will fly. The same one, at a separate time tonight, won’t fly. So they have grounded them all trying to figure out what is going on. We are sending a couple of specialists over there to sort that out.”

Despite requests, Elbit declines to provide updates concerning the resolution of this problem. On April 6/09, Boeing subsidiary Insitu receives an award to provide “small unmanned aerial vehicle (SUAV) services” to support the Canadian Forces in Afghanistan and elsewhere, using its ScanEagle UAV.

Canada problems, loss

Nov 8/06: Recognition. Elbit Systems Ltd. announces [PDF | HTML via Shepherd] that its Skylark II UAV has received a “2006 Best of What’s New” Award from Popular Science Magazine in the Aviation and Space category. If you haven’t heard of this feature before, the magazine explains:

“Each year, the editors of Popular Science review thousands of new products in search of the top 100 tech innovations of the year; breakthrough products and technologies that represent a significant leap in their categories. The winners – the Best of What’s New – are awarded inclusion in the much-anticipated December issue of Popular Science, the most widely read issue of the year since the debut of Best of What’s New in 1987. Best of What’s New awards are presented to 100 new products and technologies in 10 categories: Automotive, Aviation & Space, Computing, Engineering, Gadgets, General Innovation, Home Entertainment, Home Tech, Personal Health and Recreation.”

Oct 3/06: Skylark I. Canada joins Australia in choosing Elbit’s Skylark. The UAV was first ordered on a temporary basis, as part of the $200 million set of emergency purchases for Operation Archer in November 2005.

It was picked more formally as Canada’s future mini-UAV in October 2006, following a competition that reportedly included IAI’s I-View 50 with its unique parafoil landing system, and Boeing’s larger ScanEagle UAV. Thales Canada will act as the prime contractor.

Canada

June 13/06: Skylark II. Elbit Systems formally introduces the Skylark II “close range class tactical UAV system.” Release.

Skylark II

Nov 3/05: Skylark I. Australia chose Elbit’s Skylark as its mini-UAV, to complement Israel Aerospace Industries’ larger I-View 250 and some Boeing ScanEagles used at battalion and brigade levels.

Australia

Additional Readings

Catégories: Defence`s Feeds

LM Gets $112M for 2016 Aegis Mods | USAF ICBM Upgrades May be Delayed by Costs | Rhinemetall Meets & Exceeds UK’s Challenger 2 LEP

jeu, 18/08/2016 - 01:58
Americas

  • Lockheed Martin has received $112 million as part of the 2016 Aegis modernization program. The US Navy contract modification covers the production of multi-mission signal processor equipment sets, ballistic missile defense 4.0.2 equipment, Aegis weapon system modernization upgrade equipment, as well as associated spares to support the fielding of Aegis modernization capabilities to the fleet. Under the program, vessels receiving the upgraded systems will experience increased computing power as well as improved detection and reaction capabilities of its radars.

  • The Pentagon and the USAF have run into issues over the latter’s plan to replace the LGM-30G intercontinental ballistic missile (ICBM). Concern over cost estimates given the USAF have been expressed by Washington, who found that the flying branch’s figure differs greatly from that of the office of independent cost assessment. The disparity stems from the fact that the US hasn’t built new ICBMs in decades, and nuclear spending over the next 30 years could exceed $1 trillion.

Middle East North Africa

  • Following Monday’s bombing of a school and a Doctors Without Borders hospital in Yemen by Saudi-led forces, an investigation will commence by a body set up to investigate civilian casualties. The two bombings resulted in the death of 24 people, at least ten of them children, and adds to a growing number of incidents where coalition attacks have targeted non-military targets. Saudi Arabia has received much international criticism for its actions in Yemen, with some organizations claiming it is complicit in war crimes. US, UK and Canadian arms manufacturers have also come under fire for selling the Gulf kingdom weaponry.

  • If Russian media sources are to be believed, the Royal Moroccan Air Force could potentially be moving away from Western made aircraft in favor of the Su-34. Sources claim a deal between Rabat and Moscow is in the cards for a number of the bomber’s export versions as well as the Amur-class 1650 diesel electric submarine. Morocco has been undergoing modernization in all of its military branches, often with US help, in order to curb Islamist militants. However this latest deal may have more to do with its frosty neighbor Algeria, who has been buying Russian hardware for some time now.

Europe

  • Slat armor has been designed for tracked and wheeled armored fighting vehicles (AFV) by Russian defense manufacturers. Vehicles on which the armor can be installed include the BTR-60, BTR-70 and BTR-80 8×8 amphibious armored personnel carriers (APCs), the BMP-1 and BMP-2 tracked infantry fighting vehicles (IFVs), and the 4×4 BRDM-2 amphibious scout car. Up to 100% of the vehicle can be protected by the armor for enhanced survivability against anti-tank weapons fitted with a single high-explosive anti-tank (HEAT) warhead.

  • Rheinmetall has upped the stakes in the UK’s Challenger 2 Life Extension Program by offering wider enhancements to the platform alongside the requested spec by the MoD. This includes replacing the tank’s 120 mm L30A1 rifled gun with 120 mm L55 smoothbore, which allows for a much wider choice of ammunition options of which Rheinmetall is a leading expert. Other options offered include new optronics, situational awareness systems, and fire control solutions.

Asia Pacific

  • Too few aircraft and too few pilots, that’s whats being said about the Afghan air force’s hampered ability to tackle Taliban militants. While 130 aircraft is deemed as too few, the main problem stems from a lack of suitable candidates to be trained as pilots. Regarding the training of the air force by the US-led NATO coalition, their energies have been focused on establishing a special operations air wing and training crews to fly new aircraft, like the small A-29 attack aircraft and C-130 cargo planes. As a result, experienced pilots and crew have been pulled from other units.

  • They’re THAAD as hell, and they’re not going to take it any more. 900 South Korean protestors angry at their government’s deployment of the Terminal High Altitude Air Defense (THAAD) have taken part in a mass head shaving. Citizens from the southeastern county of Seongju have brought up several issues including safety issues regarding the system’s sophisticated radar and its potential to be a wartime target. Meanwhile, the US continues to lobby Beijing, saying THAAD’s deployment on the Korean peninsula does not threaten China.

Today’s Video

Belarus unveils its brand new Russian “Protivnik-GE” 59N6-E mobile 3D surveillance radar:

Catégories: Defence`s Feeds

Pages